Professional Documents
Culture Documents
Above water
• Situated or taking place on or above the surface of the ground
• Operating or existing within the establishment; conventional
D1 C1 A1
Site clearance shall include Items for demolitions and site Item description for work
general clearance, the clearance shall be deemed to from which the materials
demolition and removal of all include disposal of the arising remain the property of
articles, objects, and materials arising the Employer shall be so
obstructions which are stated as well as the handing
expressly required to be over and location of storage.
Cleared , except those for Where the so stated materials
which separate items are are to be salvaged by
given as set out in this class. Contractor, a separate bill for
Clearing shall also include the the credit of the Employer
levelling of obsolete shall be so described.
dikes,terraces, ditches, etc.
1 2
FIRST DIVISION SECOND DIVISION THIRD DIVISION UNIT
Above Ground
Timber
Metal
No Predominant Material
BUILDING 2 x 5m (1 nos)
Concrete
Above ground ‒ concrete eriveway
SUM of total gross built-up area of 10 m2
3 x 7.5 x 2 (1 nos) (E411)
SUM Individual building ‒ administration office of
tatal gross built-up area of 45 m2 (E311) 50 m2 area (1 nos)
Below ground ‒ swimming pool for
Timber SUM total area is 50 m2 (E412.1)
5 x 8 (8 nos)
a long pipe, typically underground, for conveying oil, gas, etc. over long
distances.
FIRST DIVISION SECOND DIVISION THIRD DIVISION UNIT
5 Pipelines 1 Nominal bore: exceeding 300mm m
ITEM
NO. CODE NO. DESCPRIPTION UNIT QTY RATE AMOUNT(RM)
E500 PIPELINES A1
Demolition of pipelines shall be deemed to include
demolition and removal of supports