ρ
No Mid x a K = 2πa (ohm ρi (ohm Keterangan
(m) (m) (m) ) meter)
1 1.5 1 6.283185 71 446.106 Pasir
2 2.5 1 6.283185 33.5 210.487 Pasir
3 3.5 1 6.283185 20 125.664 Pasir
4 4.5 1 6.283185 15 94.2478 Lempung
5 5.5 1 6.283185 11 69.115 Lempung
6 6.5 1 6.283185 8 50.2655 Lempung
7 7.5 1 6.283185 5.65 35.5 Lempung
8 8.5 1 6.283185 5.2 32.6726 Lempung
9 9.5 1 6.283185 4.5 28.2743 Lempung
10 10.5 1 6.283185 3.1 19.4779 Lempung
11 11.5 1 6.283185 3.3 20.7345 Lempung
12 12.5 1 6.283185 2.8 17.5929 Lempung
13 13.5 1 6.283185 4.1 25.7611 Lempung
14 14.5 1 6.283185 3.6 22.6195 Lempung
15 15.5 1 6.283185 3.65 22.9336 Lempung
16 16.5 1 6.283185 4.85 30.4734 Lempung
17 17.5 1 6.283185 8.5 53.4071 Lempung
18 18.5 1 6.283185 4.3 27.0177 Lempung
19 19.5 1 6.283185 7.2 45.2389 Lempung

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

SOIL RESISTIVITY TEST (ASTM G57)

Praktikum : Geolistrik Tanggal :

Lokasi : Lapangan Penyaji : Kelompok 4A

Disusun : Muhamad Azizi Dicek Oleh :

No Mid a K = 2πa ρ ρi (ohm Keterangan


x (m) (m) (m) (ohm) meter)
1 3 2 12.56637 69 867.0796 Pasir
2 4 2 12.56637 42 527.7876 Pasir
3 5 2 12.56637 30 376.9911 Pasir
4 6 2 12.56637 21.5 270.177 Pasir
5 7 2 12.56637 15 188.4956 Pasir
6 8 2 12.56637 12.5 157.0796 Pasir
7 9 2 12.56637 10.5 131.9469 Pasir
8 10 2 12.56637 8.25 103.6726 Pasir
9 11 2 12.56637 5.9 74.14159 Lempung
10 12 2 12.56637 6.65 83.56636 Lempung
11 13 2 12.56637 6.7 84.19468 Lempung
12 14 2 12.56637 5.8 72.88495 Lempung
13 15 2 12.56637 7.35 92.36282 Lempung
14 16 2 12.56637 5.5 69.11504 Lempung
15 17 2 12.56637 8.5 106.8142 Pasir
16 18 2 12.56637 7.6 95.50442 Lempung
17 19 2 12.56637 5.45 68.48672 Lempung
18 20 2 12.56637 10.75 135.0885 Lempung

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

SOIL RESISTIVITY TEST (ASTM G57)

Praktikum : Geolistrik Tanggal :

Lokasi : Lapangan Penyaji : Kelompok 4A

Disusun : Muhamad Azizi Dicek Oleh :

Mid ρ
No x a K = 2πa (ohm ρi (ohm Keterangan
(m) (m) (m) ) meter)
1 4.5 3 18.8496 54 1017.876 Pasir
2 5.5 3 18.8496 40 753.9822 Pasir
3 6.5 3 18.8496 27.5 518.3628 Pasir
4 7.5 3 18.8496 19.5 367.5663 Pasir
5 8.5 3 18.8496 16 301.5929 Pasir
6 9.5 3 18.8496 14 263.8938 Pasir
7 10.5 3 18.8496 10.5 197.9203 Pasir
8 11.5 3 18.8496 9.45 178.1283 Pasir
9 12.5 3 18.8496 9.6 180.9557 Pasir
10 13.5 3 18.8496 9.8 184.7256 Pasir
11 14.5 3 18.8496 7.1 133.8318 Pasir
12 15.5 3 18.8496 6.75 127.2345 Pasir
13 16.5 3 18.8496 9 169.646 Pasir
14 17.5 3 18.8496 5.7 107.4425 Pasir
15 18.5 3 18.8496 8 150.7964 Pasir

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

SOIL RESISTIVITY TEST (ASTM G57)

Praktikum : Geolistrik Tanggal :

Lokasi : Lapangan Penyaji : Kelompok 4A

Disusun : Muhamad Azizi Dicek Oleh :

K= ρ
No Mid x a 2πa (ohm ρi (ohm Keterangan
(m) (m) (m) ) meter)
1 6 4 25.133 46.5 1168.672 Pasir
2 7 4 25.133 31 779.115 Pasir
3 8 4 25.133 25 628.3185 Pasir
4 9 4 25.133 20 502.6548 Pasir
5 10 4 25.133 16 402.1239 Pasir
6 11 4 25.133 12 301.5929 Pasir
7 12 4 25.133 11.5 289.0265 Pasir
8 13 4 25.133 11 276.4602 Pasir
9 14 4 25.133 9.8 246.3009 Pasir
10 15 4 25.133 9.75 245.0442 Pasir
11 16 4 25.133 7.7 193.5221 Pasir
12 17 4 25.133 10.1 253.8407 Pasir
13 18 4 25.133 9.4 236.2478 Pasir
14 19 4 25.133 6.95 174.6726 Pasir

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

SOIL RESISTIVITY TEST (ASTM G57)

Praktikum : Geolistrik Tanggal :

Lokasi : Lapangan Penyaji : Kelompok 4A

Disusun : Muhamad Azizi Dicek Oleh :

No Mid x a K = 2πa ρ ρi (ohm Keterangan


(m) (m) (m) (ohm) meter)
1 7.5 5 31.41593 34.5 1083.849 Pasir
2 8.5 5 31.41593 27.5 863.938 Pasir
3 9.5 5 31.41593 22.5 706.8583 Pasir
4 10.5 5 31.41593 18 565.4867 Pasir
5 11.5 5 31.41593 16 502.6548 Pasir
6 12.5 5 31.41593 14 439.823 Pasir
7 13.5 5 31.41593 13.5 424.115 Pasir
8 14.5 5 31.41593 10.3 323.584 Pasir
9 15.5 5 31.41593 9.15 287.4557 Pasir
10 16.5 5 31.41593 8.65 271.7478 Pasir
11 17.5 5 31.41593 10 314.1593 Pasir
12 18.5 5 31.41593 7.5 235.6194 Pasir
13 19.5 5 31.41593 9.1 285.8849 Pasir

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

SOIL RESISTIVITY TEST (ASTM G57)

Praktikum : Geolistrik Tanggal :

Lokasi : Lapangan Penyaji : Kelompok 4A

Disusun : Muhamad Azizi Dicek Oleh :

Mid K=
No x a 2πa ρ ρi (ohm Keterangan
(m) (m) (m) (ohm) meter)
1 9 6 37.699 31 1168.672 Pasir
2 10 6 37.699 25.5 961.3274 Pasir
3 11 6 37.699 19.5 735.1327 Pasir
4 12 6 37.699 19 716.2831 Pasir
5 13 6 37.699 17 640.8849 Pasir
6 14 6 37.699 15 565.4867 Pasir
7 15 6 37.699 14 527.7876 Pasir
8 16 6 37.699 11.5 433.5398 Pasir
9 17 6 37.699 12.5 471.2389 Pasir
10 18 6 37.699 11.5 433.5398 Pasir
11 19 6 37.699 9 339.292 Pasir
12 20 6 37.699 11 414.6902 Pasir

Mid
No x a K = 2πa ρ ρi (ohm Keterangan
(m) (m) (m) (ohm) meter)
43.982
Pasir
1 10.5 7 3 28.5 1253.495
43.982
Pasir
2 11.5 7 3 23.5 1033.584
43.982
Pasir
3 12.5 7 3 27.5 1209.513
43.982
Pasir
4 13.5 7 3 20 879.6459
43.982
Pasir
5 14.5 7 3 16 703.7168
43.982
Pasir
6 15.5 7 3 13 571.7699
7 16.5 7 43.982 12 527.7876 Pasir

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

3
43.982
Pasir
8 17.5 7 3 14 615.7522
43.982
Pasir
9 18.5 7 3 24 1055.575
43.982
Pasir
10 19.5 7 3 13 571.7699

SOIL RESISTIVITY TEST (ASTM G57)

Praktikum : Geolistrik Tanggal :

Lokasi : Lapangan Penyaji : Kelompok 4A

Disusun : Muhamad Azizi Dicek Oleh :

No Mid x a K = 2πa ρ ρi (ohm Keterangan


(m) (m) (m) (ohm) meter)
1 12 8 50.2655 26.5 1332.035 Pasir
2 13 8 50.2655 23 1156.106 Pasir
3 14 8 50.2655 20 1005.31 Pasir
4 15 8 50.2655 18 904.7787 Pasir
5 16 8 50.2655 15 753.9822 Pasir
6 17 8 50.2655 16.5 829.3805 Pasir
7 18 8 50.2655 15 753.9822 Pasir
8 19 8 50.2655 11.5 578.053 Pasir
9 20 8 50.2655 15 753.9822 Pasir

a ρ
N
Mid x (m K = 2πa (ohm ρi (ohm Keterangan
o
(m) ) (m) ) meter)
56.5486
Pasir
1 13.5 9 7 26.5 1498.54
56.5486 1130.97
Pasir
2 14.5 9 7 20 3
56.5486 1017.87
Pasir
3 15.5 9 7 18 6
56.5486 961.327
Pasir
4 16.5 9 7 17 4
56.5486 1017.87
Pasir
5 17.5 9 7 18 6
6 18.5 9 56.5486 13 735.132 Pasir

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

7 7
56.5486 904.778
Pasir
7 19.5 9 7 16 7

No Mid x a K = 2πa ρ ρi (ohm Keterangan


(m) (m) (m) (ohm) meter)
1 15 10 62.832 23.5 1476.549 Pasir
2 16 10 62.832 19.5 1225.221 Pasir
3 17 10 62.832 20 1256.637 Pasir
4 18 10 62.832 18 1130.973 Pasir
5 19 10 62.832 13.5 848.23 Pasir
6 20 10 62.832 16.5 1036.726 Pasir

SOIL RESISTIVITY TEST (ASTM G57)

Praktikum : Geolistrik Tanggal :

Lokasi : Lapangan Penyaji : Kelompok 4A

Disusun : Muhamad Azizi Dicek Oleh :

No Mid x a K = 2πa ρ ρi (ohm Keterangan


(m) (m) (m) (ohm) meter)
1 16.5 11 69.11504 21.5 1485.973 Pasir
2 17.5 11 69.11504 20 1382.301 Pasir
3 18.5 11 69.11504 15 1036.726 Pasir
4 19.5 11 69.11504 14 967.6105 Pasir

ρ
No Mid x a K = 2πa (ohm ρi (ohm Keterangan
(m) (m) (m) ) meter)
1 18 12 75.39822 21 1583.363 Pasir
2 19 12 75.39822 16 1206.372 Pasir
3 20 12 75.39822 18.5 1394.867 Pasir

No Mid x a K = 2πa ρ ρi (ohm Keterangan


(m) (m) (m) (ohm meter)

MUHAMAD AZIZI (1507117659)


LAPORAN PRAKTIKUM MEKANIKA TANAH

)
1 19.5 13 81.68141 21.5 1756.15 Pasir