SINCOR - DOWNSTREAM PROJECT 72
@ CONTROL AND SAFEGUARDING NARRATIVES —
Plant and instruments Air System Unit (PIASU)
Rev.
4
SINCOR - DOWNSTREAM PROJECT
SPECIFICATION
CONTROL AND SAFEGUARDING NARRATIVES.
Plant and Instruments Air System Unit (PIASU)
Modifications subject of this revision concern the following pages: 16
8 ]
6 a Q 0
« fpwiane[nwtino {22 |p marm W)Jewonma_Xé | agentes arena
2 pontoon [v-renmerme™ | wena * \ [a worn 1 Weg ora pst
2 [sasazto |v senna [w menon [A Nora re(Cons ps
+ | wovze [rears |. venina [a Nona FA
@ | rovssiess fn rz [A MonaN _[Pn. ROBIN IER
we] om | wmaraver | crecxraay | semnoncoor wane
cote | wmetey | quescoey | sptroxens
DOSUMENT REVISIONS
‘Sextions changed in ast revision are identified by a vertical line inthe right marginJeb n Materialcode OrdarN’ Rev.
Contrina SP STE SE 1811 oon 4
( EF Page
SINCOR - DOWNSTREAM PROJECT 2f72
e ‘CONTROL AND SAFEGUARDING NARRATIVES —
Piant and Instruments Air System Unit (PIASU)
CONTENTS,
1. PURPOSE.
2. REFERENCE DOCUMENTS.
3, ABBREVIATIONS .
4, DESCRIPTION OF PROCESS
41 General.
5. PROCESS CONTROL NARRATIVES ...
5.1 Anti Surge Detection. Turbine Driven Compressor 06-K-60-01A.
@ x2 susurgedeestonturine Deven Compressor VEK-40T
:
3 Anti Surge Detection. Motor Driven Compressor 06-K-60-01B. ..
5.4 Anti Surge Detection. Motor Driven Compressor 06-K-60-018.
$. LOGIC / SEQUENCE NARRATIVES ..
06-K-60-01A/T
Objective
Functional description |
Implementation and Operational Aspect..
62 06-K-60-01BS..
Objective .
Functional description
implementation and Operational Aspect..
06-PG-60.01A/B Air Dryer Sequene:
Objective.
Functional description
64 Compressors 06-K-60-01A/T/BIS Auto-Start Sequence,
6AL Object
64.2 Functional description.
7. IPF NARRATIVES.
TA Objectives...Jeb" Material code OiderN" Rev.
Contrina SP 5731E 66 1511 001 4
C Page
SINCOR - DOWNSTREAM PROJECT 32
e CONTROL AND SAFEGUARDING NARRATIVES —
Plant and instruments Air System Unit (PIASU}
72 ‘Compressors 06-K-60-DIAJT.
721 Functional Description
722 Operational and Implementation Aspects.
73 Compressors 06-K-60-01 BS er
73.1 Functional Description
73.2 Operational and Implementation Aspect
Attachments:
Number 4: CONTROL LOGIC DIAGRAMS. DOC. NO. WC-DP0181. Rev. 4. VENDOR ELLIOTT. a7
Number 2: CONTROL LOGIC DIAGRAMS. DOC. NO. WC-DP0174. Rev. 4. VENDOR ELLIOTT. 45
58
Number 3: COMPRESSOR CONTROL AND IPF NARRATIVE. DOC. NO. SK99J07D23. Rev. 2.JebN° Materialcode Order N” Rev,
Contrina SP -5731E 66 1614 oot 4
——— Page
SINCOR - DOWNSTREAM PROJECT 472
e CONTROL AND SAFEGUARDING NARRATIVES —
Ptant and Instruments Air System Unit (PIASU)
1. PURPOSE
This document describes the control and Instrument Protective Function (IPF) of the Plant and
Instrument Air Dryer unit (PIASU) Unit 6600 of the SINCOR Downstream Project.
REFERENCE DOCUMENTS
This specification is complemented by the dedicated following specifications:
DB 57300 P392 01 Process Control Philosophy
SP 57300 00 151004 DCS Functional Block Diagram
SP 5730D 00151005 ESD Functional Block Diagram
SP 5731E 66 156501 Cause and Effect Chart
WC-DP0174 Control Logie Diagrams. Compressors 08-K-60-01B/01S. Elliott vendor
document.
WO-DP0181 Control Logic Diagrams. Compressors 06-K-60-01A/01T. Elliott vendor
document.
$K99J07023 Compressor Control and IPF Narrative. Elliott vendor document.
ABBREVIATIONS
A: Automatic F: False FP : Fail Position M_ : Manual
Mt: Measurement N= No NA: Not Applicable PV: Process Value
RSP: Remote SetPoint $:Slave SP: Set Point TR: Tracking
U_ Unchanged Y: Yes
4 DESCRIPTION OF PROCESS
44 General
The mein objective of the Plant & Instrument Air System Unit is to produce compressed air from
atmosphere fo the Instrument Air and Plant Air System.
Compressed air from the air compressors is sent to both instrument and plant air headers. The Stream
going to the Instrument air system is passed through a heatless air dryer package where moisture
‘content is reduced to achiove a dew point of -20 degree C @ 8.5 Barg.
‘The unit is located between the demineralized water storage tank, the substation number 9 and the unit,
6100-6800 pipe rack and interfaces with all units in the Upgrader.
The Plant and instrument Air unit consists of two vendor's packages and other equipment.
+ Instrument & plant air compressors which includes four compressors, intercoolers, aftercoolers,
electrical motors andior steam turbines and the compressors controt system.
- Two instrument alr dryers each includes air dryer prefiters, desiccant vessels, purge vent silencer,
e air dryers afterfiters and related control system.
Other Equipment includes moisture separator, ptant air receiver and instrument air receiversob Material code OnderN’ Rev.
Contrina SP 731 66 1611 oor 4
Page
SINCOR - DOWNSTREAM PROJECT 5172
CONTROL AND SAFEGUARDING NARRATIVES —
Plant and Instruments Air System Unit (PIASU)
During normal operation plant and instrument air are produced in sufficient quantity at the quality
specification required to satisfy all users in the plant. instrument air is passed through instrument air