N 6300819

E 330907

DEMOLITION NOTES BOUNDARY


EXISTING BUILDING TO BE
DEMOLISHED, INCLUDING ROOF,
REFER TO SITE PLAN A-001 FOR INDICATIVE LOCATION WALLS, SLABS AND FOOTINGS:
OF STOCKPILES RECYCLED OFF SITE AS
APPROPRIATE
TREES SCHEDULED FOR DEMOLITION TO BE MARKED EXISTING CONCRETE PATHS TO
ONSITE BY CITY OF PARRAMATTA LANDSCAPE EXISTING TREES BE BE DEMOLISHED
ARCHITECT PRIOR TO REMOVAL REMOVED TO LANDSCAPE
ARCHITECTS DETAILS
TREE ROOTS EXCEEDING 50mm IN DIAMETER ARE NOT
TO BE CUT UNLESS PERMITTED IN WRITING BY
COUNCIL'S TREE MANAGEMENT OFFICER
ED
PRIOR TO INSTALLATION OF NEW LANDSCAPE WORKS, AIN
STRIP AND REMOVE EXISTING TURF/ MULCH BEDS TO RET
E
MIN. 50MM DEPTH AND REMOVE FROM SITE. EXCAVATE OB
HT EXISTING STORMWATER PIT
TO DEPTHS AS REQUIRED TO ACHIEVE DESIGN LEVELS.
PAT
TO BE RETAINED AND
ING
GRADE ALL WORKS TO ENSURE FREE FLOW OF IST AMENDED TO STORMWATER
EX ENGINEERS DETAILS
SURFACE WATER OVER THE SITE AND PREVENT
PONDING. GRADE TO DRAINS WHERE POSSIBLE. VERIFY 28610
ALL EXISTING CONDITIONS ON SITE PRIOR TO
COMMENCING. NOTIFY ARCHITECT IF SITE COS
CONDITIONS VARY FROM DRAWINGS. SEDIMENT CONTROL TO STORMWATER
PITS TO STORMWATER ENGINEERS
ALL EFFORTS HAVE BEEN MADE TO NOTE PRINCIPLE DETAILS INSTALLED PRIOR TO
DEMOLITION REQUIREMENT / WORKS. WHERE THE DEMOLITION AND DURING
CONTRACTOR REQUIRES ADDITIONAL DEMOLITION, EXISTING EXISTING CONCRETE PATHWAY CONSTRUCTION
SUPPORTING OF EXISTING STRUCTURES OR MAKING BOLLARDS TO TO BE DEMOLISHED (TYPICAL)
GOOD OF ZONES RESULTING IN THE DEMOLITION BE REMOVED
PROCESS, THE CONTRACTOR SHALL ALLOW FOR
SUCH WORKS AS REQUIRED TO COMPLETE THE
WORKS. EXISTING CONCRETE PATHS TO BE
DEMOLISHED
EXISTING SIGN TO BE REMOVED FOR
IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE
RELOCATION: FOOTINGS TO BE
THE WORKS ARE CONDUCTED IN ACCORDANCE WITH
DEMOLISHED
THE REQUIREMENTS OF LOCAL AUTHORITIES,
APPROVED BUILDING PRACTICES AND ALL RELEVANT
LEGISLATION REFER TO SURVEY PLAN PROVIDED BY EXISTING PORTICO TO BE REMOVED
CoP FOR EXISTING SITE CONDITIONS. FOR RELOCATION: FOOTINGS TO BE
DEMOLISHED
READ DEMOLITION DRAWINGS IN CONJUNCTION WITH EXISTING BUILDING TO BE
STRUCTURAL ENGINEER'S DRAWINGS AND DEMOLISHED, INCLUDING ROOF,
EXISTING SIGN TO BE REMOVED AND
SPECIFICATIONS. WALLS, SLABS AND FOOTINGS:
RETAINED TO SUPERINTENDENTS
RECYCLED OFF SITE AS
INSTRUCTIONS: FOOTINGS TO BE
REFER TO SERVICES DRAWINGS FOR THE EXTENT OF APPROPRIATE
DEMOLISHED
ELECTRICAL, MECHANICAL AND HYDRAULIC SERVICES

90
160
RELOCATION, DISCONNECTION OR REMOVAL.

S
CO
EXISTING POA AND SITE FENCING WITH
DECOMMISSION, CAP AND SEAL ALL SERVICES TO BE POLE TO BE RETAINED SEDIMENT CONTROL TO
TERMINATED OR DISTURBED BY DEMOLITION WORKS. STORMWATER ENGINEERS
PLACE MARKERS TO INDICATE LOCATION OF DETAILS INSTALLED PRIOR
112 TO DEMOLITION AND DURING
DISCONNECTED SERVICES. 85
CONSTRUCTION
CO
THE CONTRACTOR IS RESPONSIBLE FOR MANAGING S
ALL MATERIAL LOADING & UNLOADING ON SITE EXISTING POST TO BE
RELATING TO THE DEMOLITION WORKS. RETAINED FIE
LD
DEMOLISH LIN
E (A
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE PPR
AND MAINTAIN HOARDING, BARRICADES, OX.
RETAIN )
LIGHTING AND GUARDRAILS AS REQUIRED BY
APPLICABLE CODES AND REGULATIONS TO PROTECT EXISTING DRIVEWAY TO
OCCUPANTS OF BUILDING AND WORKERS. BE RETAINED
COMPLY WITH ALL REGULATIONS PERTAINING TO
SAFETY OF PERSONS, PROPERTY AND THE
ENVIRONMENT LEAVE CONTRACT AREAS AND SITE
CLEAN, ORDERLY AND ACCEPTABLE FOR NEW
EX
CONSTRUCTION. IST EXISTING EDB TO BE DE-
ING
PA ENERGISED, CAREFULLY
ALL SURFACES TO BE LEFT IN GOOD ORDER, MAKE TH REMOVED AND STORED FOR
TO
GOOD AND PROFESSIONALLY REPAIR ALL HOLES BE RELOCATION AS PER ELECTRICAL
WEATHER TIGHT AND TO EQUIVALENT FIRE RATING OF RE
TA ENGINEERING
SURROUNDING CONSTRUCTION AS REQUIRED. INE
D DESIGN/SPECIFICATION
PREVENT MOVEMENT OR SETTLEMENT OF STRUCTURE
(S) PROVIDE AND PLACE BRACING OR SHORING IN
ACCORDANCE WITH STRUCTURAL ENGINEER'S
DETAILS AND BE RESPONSIBLE FOR SAFETY AND
SUPPORT OF STRUCTURE DURING THE WORKS.
ASSUME LIABILITY FOR SUCH MOVEMENT,
BOUNDARY

SETTLEMENT, DAMAGE OR INJURY.

THE CONTRACTOR IS TO ALLOW FOR THE REMOVAL


AND DISPOSAL OF ALL DEMOLISHED MATERIALS,
DEBRIS, REFUSE AND RUBBISH ASSOCIATED WITH THE
DEMOLITION WORKS.

THE REMOVAL AND RETENTION OF TREES TO BE


CONDUCTED ACCORDING TO LANDSCAPE
ARCHITECT'S PACKAGE. EXISTING
WATER TANK
RETAIN AND PROTECT EXISTING SEWER AND WATER
INFRASTRUCTURE ACCORDING TO HYDRAULIC
ENGINEERS' PACKAGE.

Pavilion Precinct - Demolition


1 1 : 200

REFER TO LANDSCAPE
ARCHITECTS PLANS FOR
DETAILS

EXISTING DRAIN AND GRATE


TO BE RETAINED

DEMOLISH EXISTING BUILDING AND


EXISTING GATE TO SLAB: SAWCUT EXISTING PAVEMENT
BE REMOVED AND AT JOINTS. CONFIRM ONSITE WITH
RELOCATED SUPERINTENDENT

2
Services Depot - Demolition
Construction Documentation
1 : 200 0 10 20 m

Rev Revision Description Date Scale: 1:200 @A2


Date : 9/04/2021 5:04:48 PM
Boronia Park New Sports Pavilion A Construction Issue 09.04.21

PROJECT NORTH

NORTH
37A Bridge Street, Epping, 2121
Demolition Plan

TRUE
Nimbus Architecture and Heritage Pty Ltd
(A2)
For : City Of Parramatta Nominated Architect: Jesse Mowbray (NSWARB 8618; ARBV 20252)
ABN 71 609 346 965 Project Number : Drawing Number : Revision
Project Status: Construction Documentation
A
Email admin@nimbusarch.com
\\nimbus-srv\Shared\Projects\1914 CoP Boronia Park Sporting Pavilion\9 Documentation\9_9 BIM\9_9_1 Central File\1914 Boronia Central - Phone +61 2 9891 3564 1914 A-100
Construction.rvt