2 sp [VA WR Leu — FUEL TANK AREA GENERATOR SET (WITH CONC. PAD) FOUR LEGGED TOWER AREA HOR.CABLE LADDER 32U IP55 CABINET (WITH CONC. PAD) FL.+200 GRAVEL SURFACING Tower 40 M. Wind Speed 310 kph Soil Bearing >330kpa(Qa) No Ground Beam Description MATERIAL EQUIPMENT QUANTITY AMOUNT AMOUNT] Foundation work Excavation soil work 400.00 Back fill and compaction soil work 356.77 Bottom foundation level 100.00 Lean concrete 5.00 Marking Line foundation 1.00 Formworks - Foundation + Columns 85.80 Rebar Assembly - Foundation + Columns 5,253.28 Concrete - Foundation + Column 4000 Psi/7 day 43.23 Soil Leveling Top Floor FL + 0.15 44.55 Gravel size 2 inch FL + 0.20 11.14 Installation Tower Tower Setting Allignment of stub anchor Non shrink Grouting C | Foundation Fence Excavation soil work Form work Concrete work Reinforcement work (12 mm.) Column Fence Form work Concrete work 0.61} M3 727.45| kG Reinforcement work (12 mm.) Reinforcement work (10 mm.) Ground Beam and Top Beam Fence Form work Concrete work Reforcement work (12 mm.) Reforcement work (10 mm.) Finishing Fence Concrete block 20 cm. (Exposed) Mortar Corner Column (4 Corner) Mortar Corner Beam (2 Corner) Painting work Steel door entrance Barbed wire fence Re-bar concrete block Lintel beam concrete Lintel beam Re-bar Concrete column main electric +3.00 M Form work. Concrete work Reinforcement work fem Grounding installation Foundation Other Panel Electrical - Excavation soil Work 1.19| M3 Panel Electrical - Bottom Concrete Pad 0.59| M3 Panel Electrical - Concrete Block 20.00cm 5.64] M3 Panel Electrical - Back Field and Compaction soil work 2.27| M3 Panel Electrical - Concrete PAD 0.38] M3 Panel Electrical - Reinforcement of Bottom Concrete Pad 40.55| kG Panel Electrical - Reinforcement of Concrete PAD 26.41| KG Generator - Excavation soil work 1.19| M3 Generator - Bottom Concrete PAD 0.59] M3 Generator - Concrete Block 20.00cm 5.64| M2 Generator - Back Field and Compaction Soil Work 2.44 | M3 Generator - Concrete PAD 0.41} M3 Generator - Reinforcement of Bottom Concrete PAD 40.55| kG Generator - Reinforcement of Concrete PAD 28.27| kG Farm Tank Oil - Bottom Concrete PAD 0.50] M3 Farm Tank Oil- Concrete Curb 0.09] M3 Farm Tank Oil - Reinforcement of Bottom concrete PAD 34.30| KG Ladder - Excavation of Soil Work 9.52 | M3 Ladder - concrete Work (footing) 1.73| M3 Ladder - Concrete Work (Column) 0.25 | M3 Ladder - Back Field and Compaction Soil Work 7.66| M3 Ladder - Formwork Foundation 3.36| M2 Ladder - Formwork Column’ 231| M2 Ladder - Reinforcement Work Foundation 53.28| KG IER SUPPLIED Ladder - reinforcement Work column 27.70| KG JER SUPPLIED Exit Platement Concrete Platement ‘Wire Mesh Sign Board Size (120cm x 244cm) Layouts & Fence High 180.00cm Bunkhouse & Warehouse Materials (4M x 10M) Board-up Size (120cm x 24cm) Personal Protective Equipment and Aid Electricity Supply Clearing and Removal of Tress Haul Debris/Excess Materials BIGIGIG|G/G)/G/G)]G ELECTRICAL WORKS UGHTING & Fiber Optic Entrance Cabling’ IMC Pipe 32mm dia. IMC Pipe 20mm dia. PVC Pipe 20mm dia. PVC Pipe SOmm dia. PVC Long Elbow Conduits 50mm dia PVC Long Elbow Conduit 32mm dia. Copper Busbar (7 holes) 95mm2 GI Wire (For Lightning Arrester) Copper Air terminal Other Materials 80mm2 THNN insulated copper Wire 25mm2 THNN Perimeter light ACPDB Panel Board with IP55 Enclosure Obsruction Light (single light) w/ Photocell MCB (200A), 4x80A, 4X20A in IP55 Enclosure Manual Transfer Switch (200A ) in IP55 Enclosure COMMON TOWERS PHXXXXXX ISOMETRIC VIEW i 5 ag (4) SITE DEVELOPMENT PLAN (420m) LAYOUT PLAN (42.0m) 2 (2 SECTION A-A (42.0m) tay as a as — aes SNE OSE on f A-2 (GENERATOR SET PLAN ft ft ‘CONCRETE PAD DETAIL \SRIRTIEEEZ~ CABINET PLAN g | vom fae ae LF oro. ae | +200 Fat. = ‘ ELEVATION ELEVATION ELEVATION ELEVATION (2) GENERATOR SET DETAILS ey [ sommnrs me nit cone 8 | RUEL TAMARA CABINET DETAILS as = as -F ais ‘SEL sprorT TOWER wwe PEW ‘cronave wm sed 1h & cH oper soca e200 nt) — 1 ooae xm xa0 4a. TH (at) — @ GATE ELEVATION Terran Qa ~ Vermin (on) Fading web So Ta ATBAR QUE = Roca wt a sag 1394 na 440) —— 4 Fras WELDED ac PLATBAR GUDE : nee Puasa nic we (ers ~ ITED HN CWP) Qu BOLT DETAIL are somoasmenasc sms ia THe RATEAR PLATE mca ELE SHAPE) — (2) WELD-ON HINGES =m & CAST-IN PLATE DETAILS ~ apres ame gzn0im) ae ee ae Be It GENERAL NOTES “RIL ELECTRICAL INGTALLATION HEREIN SHALL BE DONE IN AGOORDANGE WITH THESE (OF THE RESISTANCE TEST SHALL BE MINIMUM OF 1 MEGA OF. 7. GROUNDING SYSTEM TEST TOTAL RESISTANCE SHALL BE LESS THAN OR EQUAL TO 10 onus. 18. MATERIALS THAT PROVIDE SUPPORT, ADOED SAFETY AND ACCESS, SUCH AS PULL ‘BOXES, JUNCTION BOXES, BENDS AND OTHER FITTINGS, SHALL BE PROVIDED, EVEN IF tm 884s 4 D LOAD SCHEDULE @) a < SSS = | = Se I ‘UH Ro ~~ ‘caaue ROUTING TOEARTHING RounNs—_ ToeARTING ay Ee nua ie —_ ' ‘++ i as (3) GROUNDING DETAIL (Gp SROUNDING ETAT, ELEVATION PAN ISOMETRIC VIEW gurmcmn | - <= = =n UuSs= ae & REBAR & TOWER LEG GROUNDING ce . ———a 7 wommnenrwzone | no zg "SRP ETERS ASMA oe Ace ed (@ GROUNDING WELL REINFORCING DETAIL, qa ee ® GROUNDING DETAIL Ba NDING DETTE ood aoe pomencem ee] reer oS _ = SSL SurORTNG TOWER 2 EDU TIPEW crow WO Sem SN omens oe = a13 NOTES: 1, ALLOMENSIONSAREIN em 1 ALLOSCREPANCES SHAL BE REFERRED TO ENGNEER FOR DECSIONS BEFORE PROCEEDNG WITHTHE WORKS. {DIMENSIONS SHAL BE NOT BE OBTANED BY SCALING. 4 ALLSETTING DMENSONS TO REFER TO THE TONER -WANUFACTURERS OMENSION. '5,COMPACTION ON BACKFL BY MEANS OF RAVER FOR VERY (12) OF FLL ‘ARRANGEMENT EUBEDDED LENGTH OF HOLONG DOM BOLT REFERTO THE TONER MANUFACTURERS DETAL. LUBE dm THK HIG STRENGTH NON SHRINK SA GROUT 2441 OR EQUVALENT WITHIN, COMPRESSVE STRENGTH (51 Ni aN ‘OVER EXCAVATE 0R) UNDER UT MUST BE FLLED WITH ‘oNaRETE. pee een Teele Teele fee le Teele ele [e[e elelele iter tlelele 1 t t € t _ ® DETAIL OF TOP PLATE g RRR E rere rere Feet beet HEE EE Qos a= a 3) DETAIL OF ANCHOR BOLT, iy Ber it OF BEARING PN ey DETAIL OF BEARING PLATE 4 Ss oo ‘oenocone:eneo oesorwo sD sO FOMOLHO ROOD 18 waco om :s2060 aa FEUENET gwen oerang eis) is : = : GENERAL NOTES: ‘ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. ‘CONCRETE: 2.4 CEMENT SHALL BE PORTLAND CEMENT TYPE 1 AND CONFORM TO ASTM (C{S0 LATEST EDITION. 122 CONCRETE AGGREGATES SHALL CONFORM TO ASTM C33. ‘23 MINIMUM COMPRESSIVE STRENGTH BASED ON CYLINDER TEST (AFTER 7 pe DAYS) SHALL BE ‘AS FOLLOW: {(@) LEAN CONCRTE fet00 (®) BUILDING STRUCTURE AND FOUNDATION. fe=280 (€) POSTENSION CONCRETE SLAB ‘e820 glo 3, REINFORCING STEEL: 3.1 ALL REINFORCING BARS SHALL BE NEW DEFORMED BILLET-STEEL BARS. ‘CONFORMING TO ASTM ABI5 OR EQUAL. 32 MINIMUM YIELD STRENGTH SHALL BE 990MPa 4000 kglom"\(FOR DEFORMED ‘BAR 0810-0825, fy=5000 ig/or. FOR DEFORMED BAR DB28-0832) & 235MPa (2400 klem®yFOR PLAIN ROUND BAR) UNLESS OTHERWISE NOTED. 3.3 ALL REINFORCING BARS SHALL BE BEND-COLD, HEATING OF BARS FOR THE PURPOSE OF BENDING ARE PROHIBITED. ‘3.4 WHENEVER WELDING OF REINFORCING BARS IS REQUIRED, AUTHORITY ENGINEER'S APPROVAL IS NEEDED AND PROCEDURES OF WELDING SHALL (CONFORM TO ANSUAWS D1 4 LATEST EDITION. ‘4. REINFORCING BARS, ANCHOR BOLTS, AND DUCTS SHALL BE ACCURATELY PLACED & ADEQUATELY SUPPORTED, AND ALL UNDERGROUND PIPE LINES. ((NCLUDING WATER & CABLE PIPES) SHALL BE EMBEDDED ACCORDING TO THE RELEVANT DESIGN DRAWING BEFORE POURING CONCRETE. 6. ALLCONSTRUGTION JOINTS SHALL BE THOROUGHLY CHIPPED, CLEANED, WETTED, AND COATED WITH NEAT CEMENT GROUT INMEDIATELY BEFORE PLACING OF NEW CONCRETE. (6. IF THE SOIL UNDERNEATH THE FOOTING IS BACKFILLED OR IS DISTURBED [DURING EXCAVATION, IT SHALL BE COMPACTED TO AT LEAST 06% OF THE [MAXINUM DRY DENSITY AS DETERMINED ACCORDING TO AASHTO T-180. THE ‘BACKFILL MATERIAL ABOVE FOOTING BOTTOM SHALL BE COMPACTED, LAYER BY LAYER, TO AT LEAST 90% OF THE MAXIMUM DRY DENSITY, UNLESS. ‘OTHERWISE NOTED. 7, SPACERS AND CHAIRS SHALL BE PROPERLY INSTALLED IN ORDER TO ENSURE. ‘THE SPECIFIED CONCRETE COVER AND SPACING OF REINFORCING BARS, mo, 12 esse 1 a sap ' | oo 4) COLUMN DETAIL (2 TOP COLUMN DETAILS +700 TOP OF CONCRETE LEVEL (CL) 77 fegoot0® oF GROUNO LeveL (GL) _ eopieeree sree, eye

You might also like