2 sp [VA WR Leu —
FUEL TANK
AREA
GENERATOR SET
(WITH CONC. PAD)
FOUR LEGGED
TOWER AREA
HOR.CABLE
LADDER
32U IP55 CABINET
(WITH CONC. PAD)
FL.+200 GRAVEL SURFACINGTower 40 M. Wind Speed 310 kph
Soil Bearing >330kpa(Qa) No Ground Beam
Description MATERIAL EQUIPMENT
QUANTITY AMOUNT AMOUNT]
Foundation work
Excavation soil work 400.00
Back fill and compaction soil work 356.77
Bottom foundation level 100.00
Lean concrete 5.00
Marking Line foundation 1.00
Formworks - Foundation + Columns 85.80
Rebar Assembly - Foundation + Columns 5,253.28
Concrete - Foundation + Column 4000 Psi/7 day 43.23
Soil Leveling Top Floor FL + 0.15 44.55
Gravel size 2 inch FL + 0.20 11.14
Installation Tower
Tower
Setting Allignment of stub anchor
Non shrink GroutingC | Foundation Fence
Excavation soil work
Form work
Concrete work
Reinforcement work (12 mm.)
Column Fence
Form work
Concrete work 0.61} M3
727.45| kG
Reinforcement work (12 mm.)
Reinforcement work (10 mm.)
Ground Beam and Top Beam Fence
Form work
Concrete work
Reforcement work (12 mm.)
Reforcement work (10 mm.)Finishing Fence
Concrete block 20 cm. (Exposed)
Mortar Corner Column (4 Corner)
Mortar Corner Beam (2 Corner)
Painting work
Steel door entrance
Barbed wire fence
Re-bar concrete block
Lintel beam concrete
Lintel beam Re-bar
Concrete column main electric +3.00 M
Form work.
Concrete work
Reinforcement work
fem
Grounding installationFoundation Other
Panel Electrical - Excavation soil Work 1.19| M3
Panel Electrical - Bottom Concrete Pad 0.59| M3
Panel Electrical - Concrete Block 20.00cm 5.64] M3
Panel Electrical - Back Field and Compaction soil work 2.27| M3
Panel Electrical - Concrete PAD 0.38] M3
Panel Electrical - Reinforcement of Bottom Concrete Pad 40.55| kG
Panel Electrical - Reinforcement of Concrete PAD 26.41| KG
Generator - Excavation soil work 1.19| M3
Generator - Bottom Concrete PAD 0.59] M3
Generator - Concrete Block 20.00cm 5.64| M2
Generator - Back Field and Compaction Soil Work 2.44 | M3
Generator - Concrete PAD 0.41} M3
Generator - Reinforcement of Bottom Concrete PAD 40.55| kG
Generator - Reinforcement of Concrete PAD 28.27| kG
Farm Tank Oil - Bottom Concrete PAD 0.50] M3
Farm Tank Oil- Concrete Curb 0.09] M3
Farm Tank Oil - Reinforcement of Bottom concrete PAD 34.30| KG
Ladder - Excavation of Soil Work 9.52 | M3
Ladder - concrete Work (footing) 1.73| M3
Ladder - Concrete Work (Column) 0.25 | M3
Ladder - Back Field and Compaction Soil Work 7.66| M3
Ladder - Formwork Foundation 3.36| M2
Ladder - Formwork Column’ 231| M2
Ladder - Reinforcement Work Foundation 53.28| KG IER SUPPLIED
Ladder - reinforcement Work column 27.70| KG JER SUPPLIEDExit Platement
Concrete Platement
‘Wire Mesh
Sign Board Size (120cm x 244cm)
Layouts & Fence High 180.00cm
Bunkhouse & Warehouse Materials (4M x 10M)
Board-up Size (120cm x 24cm)
Personal Protective Equipment and Aid
Electricity Supply
Clearing and Removal of Tress
Haul Debris/Excess Materials
BIGIGIG|G/G)/G/G)]GELECTRICAL WORKS
UGHTING & Fiber Optic Entrance Cabling’
IMC Pipe 32mm dia.
IMC Pipe 20mm dia.
PVC Pipe 20mm dia.
PVC Pipe SOmm dia.
PVC Long Elbow Conduits 50mm dia
PVC Long Elbow Conduit 32mm dia.
Copper Busbar (7 holes)
95mm2 GI Wire (For Lightning Arrester)
Copper Air terminal
Other Materials
80mm2 THNN insulated copper Wire
25mm2 THNN
Perimeter light
ACPDB Panel Board with IP55 Enclosure
Obsruction Light (single light) w/ Photocell
MCB (200A), 4x80A, 4X20A in IP55 Enclosure
Manual Transfer Switch (200A ) in IP55 EnclosureCOMMON TOWERSPHXXXXXX
ISOMETRIC VIEW
i
5
ag
(4) SITE DEVELOPMENT PLAN (420m)LAYOUT PLAN (42.0m)
2
(2 SECTION A-A (42.0m)
tay
as a as — aes
SNE OSE on f A-2(GENERATOR
SET PLAN
ft
ft
‘CONCRETE PAD DETAIL
\SRIRTIEEEZ~ CABINET PLAN
g | vom
fae ae LF oro. ae | +200 Fat.
= ‘
ELEVATION ELEVATION ELEVATION ELEVATION
(2) GENERATOR SET DETAILS
ey
[ sommnrs me nit cone 8
| RUEL TAMARA
CABINET DETAILS
as
= as
-F ais‘SEL sprorT TOWER wwe PEW
‘cronave wm sed 1h & cHoper
soca e200 nt) —
1 ooae
xm xa0 4a. TH (at) —
@ GATE ELEVATION
Terran
Qa
~ Vermin (on)
Fading web So Ta ATBAR QUE = Roca wt a
sag 1394 na 440)
—— 4 Fras WELDED ac PLATBAR GUDE
: nee Puasa nic we (ers ~
ITED HN CWP)
Qu BOLT DETAIL
are somoasmenasc
sms ia THe RATEAR
PLATE mca ELE SHAPE) —
(2) WELD-ON HINGES
=m
& CAST-IN PLATE DETAILS
~ apres ame gzn0im)
ae ee ae
Be ItGENERAL NOTES
“RIL ELECTRICAL INGTALLATION HEREIN SHALL BE DONE IN AGOORDANGE WITH THESE
(OF THE RESISTANCE TEST SHALL BE MINIMUM OF 1 MEGA OF.
7. GROUNDING SYSTEM TEST TOTAL RESISTANCE SHALL BE LESS THAN OR EQUAL TO 10
onus.
18. MATERIALS THAT PROVIDE SUPPORT, ADOED SAFETY AND ACCESS, SUCH AS PULL
‘BOXES, JUNCTION BOXES, BENDS AND OTHER FITTINGS, SHALL BE PROVIDED, EVEN IF
tm 884s 4
D LOAD SCHEDULE
@)
a < SSS = |
= Se I‘UH Ro ~~
‘caaue ROUTING
TOEARTHING
RounNs—_
ToeARTING
ay
Ee
nua ie
—_
'
‘++
i as
(3) GROUNDING DETAIL
(Gp SROUNDING ETAT,
ELEVATION PAN
ISOMETRIC VIEW gurmcmn |
- <= = =nUuSs= ae
& REBAR & TOWER LEG GROUNDING ce
. ———a 7
wommnenrwzone |
no zg "SRP ETERS ASMA
oe Ace ed (@ GROUNDING WELL REINFORCING DETAIL,
qa ee
® GROUNDING DETAIL
Ba NDING DETTE
ood aoe pomencem ee] reer oS _ =
SSL SurORTNG TOWER 2 EDU TIPEW
crow WO Sem SN
omens oe = a13NOTES:
1, ALLOMENSIONSAREIN em
1 ALLOSCREPANCES SHAL BE REFERRED TO ENGNEER
FOR DECSIONS BEFORE PROCEEDNG WITHTHE WORKS.
{DIMENSIONS SHAL BE NOT BE OBTANED BY SCALING.
4 ALLSETTING DMENSONS TO REFER TO THE TONER
-WANUFACTURERS OMENSION.
'5,COMPACTION ON BACKFL BY MEANS OF RAVER FOR
VERY (12) OF FLL
‘ARRANGEMENT EUBEDDED LENGTH OF HOLONG DOM
BOLT REFERTO THE TONER MANUFACTURERS DETAL.
LUBE dm THK HIG STRENGTH NON SHRINK SA GROUT
2441 OR EQUVALENT WITHIN, COMPRESSVE STRENGTH
(51 Ni aN
‘OVER EXCAVATE 0R) UNDER UT MUST BE FLLED WITH
‘oNaRETE.
pee een
Teele
Teele
fee le
Teele
ele [e[e
elelele
iter
tlelele
1
t
t
€
t
_ ® DETAIL OF TOP PLATE
g
RRR E
rere
rere
Feet
beet
HEE EE
Qos a=
a
3) DETAIL OF ANCHOR BOLT,
iy Ber it OF BEARING PN
ey
DETAIL OF BEARING PLATE
4
Ss
oo‘oenocone:eneo
oesorwo sD sO
FOMOLHO ROOD 18
waco om :s2060
aa
FEUENET
gwen oerang
eis)
is :
= :GENERAL NOTES:
‘ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.
‘CONCRETE:
2.4 CEMENT SHALL BE PORTLAND CEMENT TYPE 1 AND CONFORM TO ASTM
(C{S0 LATEST EDITION.
122 CONCRETE AGGREGATES SHALL CONFORM TO ASTM C33.
‘23 MINIMUM COMPRESSIVE STRENGTH BASED ON CYLINDER TEST (AFTER 7
pe
DAYS) SHALL BE
‘AS FOLLOW:
{(@) LEAN CONCRTE fet00
(®) BUILDING STRUCTURE AND FOUNDATION. fe=280
(€) POSTENSION CONCRETE SLAB ‘e820
glo
3, REINFORCING STEEL:
3.1 ALL REINFORCING BARS SHALL BE NEW DEFORMED BILLET-STEEL BARS.
‘CONFORMING TO ASTM ABI5 OR EQUAL.
32 MINIMUM YIELD STRENGTH SHALL BE 990MPa 4000 kglom"\(FOR DEFORMED
‘BAR 0810-0825, fy=5000 ig/or. FOR DEFORMED BAR DB28-0832) & 235MPa (2400
klem®yFOR PLAIN ROUND BAR) UNLESS OTHERWISE NOTED.
3.3 ALL REINFORCING BARS SHALL BE BEND-COLD, HEATING OF BARS FOR THE
PURPOSE OF BENDING ARE PROHIBITED.
‘3.4 WHENEVER WELDING OF REINFORCING BARS IS REQUIRED, AUTHORITY
ENGINEER'S APPROVAL IS NEEDED AND PROCEDURES OF WELDING SHALL
(CONFORM TO ANSUAWS D1 4 LATEST EDITION.
‘4. REINFORCING BARS, ANCHOR BOLTS, AND DUCTS SHALL BE ACCURATELY
PLACED & ADEQUATELY SUPPORTED, AND ALL UNDERGROUND PIPE LINES.
((NCLUDING WATER & CABLE PIPES) SHALL BE EMBEDDED ACCORDING TO THE
RELEVANT DESIGN DRAWING BEFORE POURING CONCRETE.
6. ALLCONSTRUGTION JOINTS SHALL BE THOROUGHLY CHIPPED, CLEANED,
WETTED, AND COATED WITH NEAT CEMENT GROUT INMEDIATELY BEFORE
PLACING OF NEW CONCRETE.
(6. IF THE SOIL UNDERNEATH THE FOOTING IS BACKFILLED OR IS DISTURBED
[DURING EXCAVATION, IT SHALL BE COMPACTED TO AT LEAST 06% OF THE
[MAXINUM DRY DENSITY AS DETERMINED ACCORDING TO AASHTO T-180. THE
‘BACKFILL MATERIAL ABOVE FOOTING BOTTOM SHALL BE COMPACTED, LAYER
BY LAYER, TO AT LEAST 90% OF THE MAXIMUM DRY DENSITY, UNLESS.
‘OTHERWISE NOTED.
7, SPACERS AND CHAIRS SHALL BE PROPERLY INSTALLED IN ORDER TO ENSURE.
‘THE SPECIFIED CONCRETE COVER AND SPACING OF REINFORCING BARS,
mo,
12 esse 1
a
sap
'
|
oo
4) COLUMN DETAIL (2 TOP COLUMN DETAILS
+700 TOP OF CONCRETE LEVEL (CL)
77 fegoot0® oF GROUNO LeveL (GL)
_ eopieeree sree,
eye