Marqus Carr
Mr.P
EETC-2223
August 31, 2020
#2.
A. Bolted Fault
B.Archimg fault
C. Arc blast
Part2
# 3. 5mA
#4 a Prepare for machinaery shutdown
b.Machinery or Equipment shutdown
c. Lockout Tagout app
d. Release of storage
e. Verification of Isolation
f. Lockout tag out Removal
#6 The NEC prime objective is to provide a national standard for electrical installation.