SPECIFICATION

I. Capacity:
AC : 50 kV
DC : 70 kV
Impulse voltage : 200 kV

II. Consists of:


a. Control Panel
b. AC Source
c. DC Source
d. Impulse Voltage Generation Device
e. Wave Form Monitor
f. Accessories

III. Control Panel:


a. Power Switch (S1) : Double pole, single throw ............................................ 1 pc
b. AC Voltmeter (V) : 0 – 200 V .......................................................................... 1 pc
c. Starting Power Switch (S3) .............................................................................. 1 pc
d. Pilot/Signal Lamp each ..................................................................................... 4 pcs
e. Elegtromagnetic Switch (MC) : 3p – 250 V – 25 A ................................. 1 pc
f. Main Voltage Regulator (SVR) : 5 kVA – 200 V – 0 – 240 V ................. 1 pc

g. AC Voltmeter (KV) : 0 – 100 V (0 – 25/50 kV in scale) ........................... 1 pc


h. DC Voltmeter (KV) : 0 – 100 A (0 – 75 kV in scale) .................................. 1 pc
i. AC Ammeter (A) : 0 – 30 A .............................................................................. 1 pc
j. Overourrent Relay (OCR) : 25 A ..................................................................... 1 pc
k. Insulating Transformer (TI) : 500 VA – 200 – 100 V ............................... 1 pc
l. AC Output Voltmeter Switch (S4) .................................................................... 1 pc
m. AC Output Voltage Terminal (V1, V2) ............................................................. 1 set
n. Leakage Current Measuring Terminal (t1, t2) ................................................ 1 set
(The following are starting devices)
o. Transfomer for Rectifier (T2) : 1ø – 20 VA – 100 V – 5000 V – G ....... 1 pc
p. Selenium Rectifier (Se) : 5HT – 20 .................................................................. 1 pc
q. DC Voltmeter (KV) : 0 – 7.5 kV ....................................................................... 1 pc
r. Main Condenser (C1) : for 0.5uF DC 5000 V .............................................. 1 pc
s. Delay Device for starting .................................................................................. 1 set
t. Push-botton Switch (B.S) ..................................................................................... 1 pc
u. Discharge Ball ...................................................................................................... 1 set

IV. AC Source:
a. Testing Transformer (T, Tr).................................................................................. 1 set
Type : Single phase, oil filled, self-cooling earth terminal
Rating : One hour
Capacity : 5 kVA
Primary Voltage : 100/200V
Secondary Voltage : 50000 V
Tertiary Voltage : 100 V (Accuracy . . . below ± 1%)
Testing Voltage : 75000 V (in 5 minutes)

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -1- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
V. DC Source:
a. Silicon Rectifier and Stand ................................................................................... 1 pc
Type : SMHR – 2 – 110
DC 75 kV for rectification
b. Smoothing Condenser (CO)
Capacity : 0.1 µF
Working Voltage : DC 75 kV
Testing Voltage : DC 100 kV
c. DC Voltage Measuring Multiplier (MP) : 750 MΩ – 75 kV .......................... 1 pc

VI. 200 kV Impulse Voltage Generation Device


a. Insulating Stand
b. O.F. Condenser (C) : 0.25 µF .......................................................................... 4 pcs
Working Voltage : DC 50 kV
Testing Voltage : DC 75 kV
c. Charging Resistor (r) ............................................................................................. 7 pcs
Water Resisting Type : 20 – 50 kΩ
d. Damping Resistance (Rd) ...................................................................................... 4 pcs
Non-inductive Selenoid Type Metal Resistor : 20
e. Wave Front Adjusting Inductance ...................................................................... 1 pc
Air-core/single-layer Cylinder Type : 350 µH
f. Discharge Resistor (R) ............................................................................................ 1 set
Non-inductive Type : 800 Ω
g. Discharge Ball : 80ø ................................................................................. 7 pcs
h. Discharge Ball Controller : Manual Oepratin/Interlock Type ...................... 1 set
i. Staring Ball : Insulating Needle Tip Type ......................................................... 1 pc
j. Reontgen Cable : for DC 5 kV 5 m

VII. Accessories
a. Insulating Oil Testing Stand .............................................................................. 1 pc
With Standard Ball Oil Testing Cap : 12.5ø
b. Spark Gap : 62.5ø Standard Ball Type, Needle Type, Plate Type ....... 1 set
c. Oil Pressure Tester .............................................................................................. 1 set
d. Klydonograph and Glass Voltage Divide ..................................................... 1 set
e. Earth Bar ............................................................................................................... 1 pc

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -2- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -- 3
3 -- TeknikDiselenggarakan
Diselenggarakan oleh Laboratorium
Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang
Tegangan Tinggi UGM
oleh Laboratorium Teknik Tegangan Tinggi UGM
CONTROL BOARD

18 13 9 8 7

17
1
16
3
19

20 2

14 15 10 12 11 6 5

1. Pilot Lamp (PL 1)


2. Power Switch (NPB 1)
3. Pilot Lamp for Power Switch (PL 2)
4. Sliding Voltage Regulator (SVR)
5. Electromagnetic Push-Button
6. Signal Lamp for Electromagnetic Contactor (SL)
7. Primary Voltmeter (V)
8. Primary Ammeter (A)
9. AC Output Voltmeter (KV)
10. AC Output Voltmeter Switch (S 1)
11. AC Output Voltmeter Terminal (VMT 1)
12. Leakage Ammeter Terminal (AMT)
13. DC Output Voltmeter (KV 1)
14. DC Output Voltmeter Switch (S 2)
15. DC Output Voltmeter Terminal (VMT 2)
16. Starting Power Switch (NFB 2)
17. Pilot Lamp for Starting Power Switch (PL 3)
18. Starting Voltmeter (KV 2)
19. Starting Push-Button (PB)
20. Terminal for External Starting Push-Button

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -4- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Control Board - Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -5- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Control Board - Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -6- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Control Board - Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -7- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Control Board - Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -8- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Control Board - Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang -9- Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Control Board - Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 10 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
TESTING TRANSFORMER

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 11 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Testing Transformer – Components

U-Terminal

Bushing

Oil Mark

Name Plate

Earth
Exhaust Terminal
Cock

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 12 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Testing Transformer – Components

Oil Cap

Terminal
Plate
Hanger

Primary Windings Tertiary Windings

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 13 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Testing Transformer – Components

PRIMARY
(U1-V1)
VOLT. (V) CUR. (A) CONN.
200 25 U2-V2
U1-V2
100 50
U2-V1

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 14 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
SILICON RECTIFIER AND INSULATING BASE

Input Terminal

Silicon
Rectifier

Output
Terminal

Resistor

Supporting
Insulator

Earth Terminal

Base

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 15 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
DC VOLTAGE MEASURING MULTIPLIER

Input
Terminal

Resistor

Earth
Terminal

Output
Terminal

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 16 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
SMOOTHING CONDENSER

Input Series Output


Terminal Resistor Terminal

Earth Terminal Bushing

Condensor

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 17 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
IMPULSE GENERATOR

Air-core Inductance
Supporting
Insulator

Output
Terminal
Discharge
Resistance

Charging
Resistance
Resistance
Divider - 1
Capacitor

Damping
Resistance

Gap
Controller

Charging Input Base


Terminal

Series Gap
Trigger
Input Terminal

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 18 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Impulse Generator – Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 19 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Impulse Generator – Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 20 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
Impulse Generator – Components

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 21 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM
RESISTANCE DIVIDER FOR IMPULSE

Input Terminal
(from Impulse Generator
Output Terminal)

Output Terminal
(to Resistance Divider - 2)

Input Terminal Output Terminal


(from Resistance Divider - 1) (to Oscilloscope)

Praktikum Teknik Tegangan Tinggi Universitas Tridinanti Palembang - 22 - Diselenggarakan oleh Laboratorium Teknik Tegangan Tinggi UGM