You are on page 1of 1

LABORATORY

CIVIL-STRUCTURE

PROJECT : MERANGIN HYDROELECTRIC POWER PLANT 350 MW


DOC. No. : Rev. :0 Area : General
SUBJECT : Sieve Analysis - ASTM C-136 - C-136M-19
ENGINEER : WIDHI TRI NUGRAHA CHECKED : MISRIFAN APPROVED : M. YUSRI R.
Sign/Date : Sign/Date : Sign/Date :
QUARRY : BANGKO - CV. Nanda Sandy DATE : Thursday, September 3, 2020
TYPE : CRUSHED ROCK TIME :

Sieve Analysis - ASTM C-136 - C-136M-19


SIEVE NUMBER SAMPLE WEIGHT = 3000 GRAM SPECIFICATION
SIZE RETAINED % CUMULATIVE
MAKS. 20 MM
mm inch Gram % Retained Passing
76.20 3" 0 0 0 100 100 - 100
38.10 1 1/2" 0 0.00 0.00 100 100 - 100
19.05 3/4" 36 1.20 1.20 98.8 95 - 100
12.70 1/2" 2098 69.93 71.13 28.9 40 - 65
9.525 3/8" 650 21.67 92.80 7.2 30 - 60
4.750 No. 4 136 4.53 97.33 2.7 0 - 10
2.380 No. 8 0 0 97.33 2.7
1.190 No. 16 0 0 97.33 2.7
0.590 No. 30 0 0 97.33 2.7
0.297 No. 50 0 0 97.33 2.7
0.149 No. 100 0 0 97.33 2.7
PAN 80 2.67 100 0
TOTAL 3000 749.13
MODULUS FINENESS (FM) 7.49
GRADATION CURVE OF ZONE

Maks. 10 mm Maks. 20 mm
100 100
Cumulative Passing (%)
Cumulative Passing (%)

75 75

50 50

25 25

0 0
0 5 10 15 20 25 30 35 40 0 5 10 15 20 25 30 35 40
Sieve Size/ mm Sieve Size/ mm
Upper Limit Lower Limit Gradation Upper Limit Lower Limit Gradation

Maks. 40 mm
100
Cumulative Passing (%)

75

50

25

0
0 5 10 15 20 25 30 35 40
Sieve Size/ mm
Upper Limit Lower Limit Gradation