Variations in slump between trucks

Slump adjustment is a fact of life for concrete can be the result of many factors.
contractors, but they should follow these guidelines Long delivery, waiting, and unloading
times, for example, can decrease
for its use slump. Add water, if necessary, in
accordance with ASTM C 94. Turn the
drum an additional 30 revolutions at
BY BRUCE A. SUPRENANT mixing speed.

ready mix truck arrives on c o n t ra c t o r. Adjustments to the • Aggregates - 2%

A the jobsite. The concrete


sliding down the chute
looks dry, a worker asks
for 5 gallons of water, and the fight
begins. Water-paranoid specifiers
amount of water and admixtures
are commonly required. These ad-
justments aren’t necessarily due to
poor quality control or material
variations. Variations in slump be-
(60 pounds of aggregate per cubic
yard)
Water-cement ratios can vary by
about 0.01. Howe ve r, with uniform
mixing, batching tolerances
and inspectors may not allow any tween trucks can be the result of shouldn’t affect slump by more
water to be added on-site. Water- other factors. than 1⁄2 inch.
happy contractors, on the other Batching tolerances. Even with ASTM C 94 (Ref. 2) requires the
hand, consider adding water to a sophisticated computer-controlled total mixing water, which influ-
truck a birthright. Both parties batch plants, batching tolerances ences both slump and water-ce-
have a vested interest in the quality can affect slump control. Toler- ment ratio, to be measured within
and performance of the concrete. ances for the individual batching of ±3%. Besides the water added at
Why should slump be adjusted each mix ingredient are given be- the plant, the total mix water in-
in the field? How should slump be low (Ref. 1). Examples of how each cludes free water in the aggregates
adjusted in the field? Prepour con- tolerance affects the batch weights and, if applicable, water added on-
ferences must settle these two im- of a typical 3500-psi concrete mix site, residual mixer wash water, and
portant questions before the con- also are shown. ice. If the ±3% requirement is met,
crete arrives. • Cementitious materials - 1% the water content can vary by
(5 pounds of cement per cubic about 1 gallon, the water-cement
Factors Affecting Slump yard) ratio can vary by about 0.02, and
Rarely will a laboratory mix be • Water (by volume or weight) - 1% the slump can change by 1 inch per
entirely suitable under the variable (2.5 pounds or 1⁄3 gallon of water cubic yard of concrete.
field conditions facing a concrete per cubic yard) Most batch plant operators work
on the “dry” side (batch water a lit- 63% of the total drum volume. ratio above the maximum permitted
tle short), which produces concrete When the truck arrives on-site, turn by specifications.
with a safe water-cement ratio the drum another 30 revolutions at When using water to increase
while allowing, if necessary, some mixing speed to reduce any segre- slump, it must be added to the en-
field water additions to adjust gation that may have occurred dur- tire batch. Don’t add water to the
slump. Some batch plant operators ing the haul. middle or end of a batch. It’s im-
hold back as much as 5% of the De l i ve ry, waiting, and unload- possible to accurately guess the
batch water. Check the batch ticket ing times. Prolonged delivery, wait- amount of concrete remaining in
to determine how much water has ing, and unloading times can cause the truck. The common practice of
been added at the plant. a decrease in slump. ASTM C 94 re- hitting the drum with a fist and lis-
Aggregate moisture content. tening to the resulting sound to
Measuring and correcting for fine guess the remaining cubic yards
aggregate moisture content can sig- isn’t accurate. The amount of water
nificantly change slump. Assuming PROLONGED DELIVERY, WAIT- to add to a partial batch of concrete
a sand content of 1,200 pounds per to stay within the maximum water-
ING, AND UNLOADING TIMES
cubic yard, a 1% variation in sand cement ratio can’t be calculated. Al-
moisture causes a variation of CAN CAUSE A DECREASE so, you can’t add water to increase
about 1 1⁄2 gallons of water per cubic IN SLUMP slump to bypass the 1 1⁄2 hour or 300
yard. Many ready mix producers revolution criteria of ASTM C 94.
measure sand moisture contents in Make sure on-site water is added
the morning; as the temperature correctly. Introduce water into the
rises during the day and the aggre- quires the producer to have con- batch at the head section of the drum
gate dries, more water is absorbed, crete within the permissible slump or by dual injection into the head and
reducing concrete slump. range for 30 minutes starting either discharge section of the drum. Don’t
To indicate changes in sand on arrival on-site or after initial use a hose to spray additional mix
moisture content, producers slump adjust-
should use a properly maintained ment, whichever
and calibrated sand moisture me- is later. The first
ter. Moisture-compensating equip- and last
ment can be set to automatically 1
⁄4-cubic-yard dis-
reproportion sand and water batch charges are ex-
weights for a change in aggregate empt from this re-
moisture content. Typically, mois- quirement. The
ture meters aren’t sufficiently accu- contractor is re-
rate to warrant interlocking them sponsible for
with moisture compensators for slump changes
automatic operation. Even with so- due to prolonged
phisticated equipment, it’s difficult waiting and un-
to prevent slump variations due to loading times.
changes in sand moisture content.
Concrete temperature. Even Adding Water to
slight variations in concrete tem- Increase Slump
perature can affect slump. A rise in ASTM C 94 is the
t e m p e ra t u re usually decreases most frequently
slump because cement hyd ra t e s cited specification
faster at higher tempera t u re s. For that permits and
instance, a 10°F increase in con- controls on-site
crete temperature demands an ad- slump adjustment.
ditional gallon of water to maintain Section 11.7 allows
the same slump the concrete had at for a slump adjust-
the lower temperature. ment if the truck
Mixing. To achieve a uniform arrives on-site with
concrete batch, ASTM C 94 requires a concrete slump
a minimum of 70 to 100 revolutions less than specified.
at mixing speed. Because it’s diffi- The water addi- Concrete to be pumped usually requires a high slump.
cult to obtain uniform concrete in tion, howe ve r, Adding superplasticizers on-site, instead of water, can
an overloaded mixer, the volume of must not increase obtain a pumpable mix without increasing the water-
mixed concrete should not exceed the water-cement cement ratio.
water into the discharge end of the yard dosages. Throw in the re- bic yard can’t be used for accep-
drum. This method doesn’t ade- quired number of bags, then mix to tance or rejection of concrete.
quately distribute the water through- achieve the desired slump. Admix- ASTM C 94 requires tests for accep-
out the mix and the amount of water ture costs per cubic yard of con- tance to be taken from concrete
added is only a guess. crete vary from $1 to $3. representing about 15% to 85% of
ASTM C 94 requires an addition- the load. The test also must be tak-
al 30 revolutions at mixing speed Decreasing Slump en after all water is added to the en-
when water is added to the truck. Sometimes, slump needs to be tire batch.
Water can’t be added to the truck decreased. For instance, the slump Though the initial slump test of-
when the combined re vo l u t i o n s of the first 1⁄4 cubic yard of concrete ten is used in the field, it’s not in
from a long haul or waiting time is 4 inches, but it’s for a slipform strict accordance with ASTM C 94
exceed 270. paver that needs concrete with a since some concrete (the 4 cubic
Check that the ready mix truck maximum 2-inch slump. feet needed to fill a wheelbarrow)
has a Truck Mixer Ma n u f a c t u re r s Ready mix drivers typically use a is removed before water is added.
Bureau rating plate attached to the couple of extra sacks of cement to try Not accounting for the 4 cubic feet
body indicating its conformance to to dry up the mix. This may lower won’t make any practical difference
truck mixer and agitator standards. slump, either due to the cement or to at the site, but it does violate the
These standards require the truck the increased heat and grinding ac- strict interpretation of ASTM C 94.
to have a mixer water system with tion of the additional revolutions. Still, initial slump tests provide a
a working, visible sight gauge and But the process is time-consuming more accurate reading than the al-
an automatic measuring device ac- and usually not very effective. t e rn a t i ve—guessing the slump
curate to 1% of the total capacity of If a high air content causes a high while standing on a ladder looking
the water tank. slump, an air detrainer can be down into the drum, watching the
added. Reducing air content by 1% concrete move.
Other Ways to Increase Slump reduces slump by 1⁄2 inch. Trucks
It’s important to understand that with high air contents are usually Prepour Conference
concrete properties can change sent back to the plant. At the prepour conference, it’s
when water is added to the mix. An effective method for reducing important for the ready mix pro-
Adding just 1 gallon of water per slump is to add powdered silica ducer, contractor, engineer, archi-
cubic yard can: fume. Prepackaged powdered silica tect, owner, and inspector to agree
• Increase slump 1 inch fume, without superplasticizer, on why and how slump is to be ad-
• Decrease compressive strength dries up a concrete mix. Howe ve r, it justed in the field. Make sure speci-
150 to 200 psi also will darken concrete, which fications are clear for slump
• Waste about 1⁄4 bag of cement may not be acceptable. One con- tolerances and maximum water-
• Increase shrinkage by 10% tractor reports that adding 6 cement ratios for each concrete
But water isn’t the only way to pounds of silica fume to a cubic mix. Also discuss the permitted
adjust slump. Consider adding a yard of concrete lowers the slump slump adjustments, who autho-
water reducer or superplasticizer at by 1 inch. The cost of silica fume is rizes slump adjustments, and when
the site to increase slump. Using about $3 per cubic yard. water is appropriate or when ad-
admixtures maintains the water- mixtures will be used. Place con-
cement ratio, but provides a work- Testing Slump trols and limits on the use of water
able slump. If the concrete is at the Most contractors use two slump and admixtures.
maximum water-cement ratio, an tests—one for checking the initial References
admixture may be the only accept- slump of the concrete and the oth- 1. ACI 304R-89, “Guide for Measuring,
able method of increasing slump. er for acceptance criteria. Mixing, Transporting, and Placing
It’s best to add a superplasticizer Initial slump tests are used to de- Concrete,” American Concrete Insti-
to concrete of a constant slump. For termine how much water is needed, tute, Detroit, Mich.
instance, use water to raise the con- if any, to increase slump. To measure 2. ASTM C 94, “Standard Specifica-
crete slump to 4 inches, then add a initial slump, fill a wheelbarrow with tion for Ready-mixed Concrete,”
superplasticizer to raise the slump concrete from the first part of the ASTM, Philadelphia, Pa.
to 6 inches or more. If the concrete truck and take a slump test on this
has a lower slump, it’s difficult to de- first 1⁄4 cubic yard. Water additions
termine the correct dosage to based on initial slump usually are
achieve the desired slump. conservative, since the first 1⁄4 cubic
Some manufacturers make yard of concrete out of the truck typ-
prepackaged powdered admixtures ically is wetter, with a higher slump, PUBLICATION #C940038
(superplasticizer or water reducer) than the remaining concrete. Copyright © 1994, The Aberdeen Group
that come in convenient per-cubic- The slump test on the first 1⁄4 cu- All rights reserved