Professional Documents
Culture Documents
General :
Project: Package Reach 3: Construction of 10 (ten) elevated stations excluding viaduct from
Jhansi Rani Square to Lokmanya Nagar on the East-West Corridor of Nagpur Metro
Rail Project
Object: To evaluate the performance of permanent Metal Railing Systems and Rails of
building including components, comply with requirements as per IBC or IRC code.
Material Specification:
Test Procedure
The railing system was tested according to ASTM E- 985, sec 7.1.1 to confirm with IBC and IRC code
load requirement of 200 lbf concentrated load and 50 plf uniformly distributed load. The load
configurations are detailed in following tabular columns.
The load was applied with a hydraulic cylinder and text fixture apparatus. The test load was
measured with an electronic load cell positioned between the test specimen and hydraulic
cylinder. The loading sequence consisted of applying the load gradually to preload 50% of the
target load and hold for 2 mins, then released 25 % (ie 50% of pre load) and hold for 1 mins and
then gradually to the target load. The 50 plf uniform load test was applied with equivalent
concentrated loads at Quarter point using Quarter point rule : bending moment, P = wl/2.
Concentrated Load test - Test load is 200lbf (890N)
Maximum Allowable Residual deflection as per clause no. 7.2.5 shall not exceed 20% of deflection
at 50% load
Horizontally
Hence , @ top rail mid span : 20% x ((h/24) +(l/96)) = 0.44 >0.15 @ 50 % load, thus ok.
@ top rail near post : 20% x (h/12) = 0.72 >0.15 @ 50 % load, thus ok.
@ top rail post : 20% x (h/12) = 0.72 >0.20 @ 50 % load, thus ok.
Vertically
@ top rail mid span : 20% x (l/96) = 0.086 >0.0 @ 50 % load, thus ok.
Uniform Load test - Test load 50plf/ft (730N/m)
Test Load: 50plf = 50 (41.3 in/12 in) = 172 lbf both horizontally and vertically
Maximum Allowable Residual deflection as per clause no. 7.2.5 shall not exceed 20% of deflection
at 50% load
Horizontally
Hence , @ Quarter point : 20% x ((h/24) +(l/96)) = 0.44 >0.10 @ 50 % load, thus ok.
Vertically
The railing assembly system was able to sustain an uniform load of 50plf (730N/m) and a
concentrated load of 200lbf (890N) when tested as per ASTM – E 985 and met the deflection
criteria as per the specification.