You are on page 1of 2
3% Sarulla erations Lid PT TORISHIMA GUNA ENGINEERING 2_| Turbine Rotor | Last Stage | Blades Bottom | Side SUMMARY INSPECTION REPORT - ‘SUMMARY INSPECTION REPORT CUSTOMER: SARULLA OPERATION LTD MFG : TOSHIBA CORPORATION WO. NO. : WO-20-20527 EQUIPMENT —: GEOTHERMAL TURBINE PART NAME LAST STAGE BLADE TYPE 2 SCSF [CAPACITY _: 58350 kW REPORTNO. : TGE- serene ENGINEERING No | PARTNAME PICTURE DISCREPANCIES | ‘Disposition 1 | Turbine Rotor + There are small | + Next Last Stage scratches caused overhaul Blades Right by steam need to sand | Side condensation blasting & * Blade condition is minor | good polishing overhaul need to sand blasting & minor polishing There are small | + Next scratches caused overhaul by steam | need to sana ‘condensation blasting & Blade condition is minor good | polishing = Next STG Page | 1 ESa ru lla O@PE PT TORISHIMA GUNA ENGINEERING Operations Lid ENGINEERING PART NAME PICTURE _DISCREPANCIES | ‘DisposITION 3. | Turbine Rotor ‘+ There are small |» Next Last Stage scratches caused | overhaul Blades Upper by steam | need to sand Side condensation | _ blasting & * Blade condition is | minor good polishing 4" | Condition ‘+ Not found i oa shroud blade 5 | Diffuser ‘* Good Conaition © Not found * Good Conaition Finding : Recommendation : Note: > Found spray nozzle during borroscop on the last stage blade turbin > Please check all nozzle condition (NDT PT welding joint if needed) > Next overhaul should be sand blast turbine rotor & minor polishing on finding area > Conaition of turbine last satge blade is good, not indicate crack or major scratch ‘Aknowledge by: Elpandi SUMMARY INSPECTION REPORT - STG Page |2

You might also like