Professional Documents
Culture Documents
Specification - Telephone Instrument and Intercom System
Specification - Telephone Instrument and Intercom System
This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.
Record of Revisions
Revision
No. Date Description
TABLE OF CONTENTS
Section
1.0 GENERAL......................................................................................................................................................... 4
1.1 SCOPE OF SPECIFICATION ........................................................................................................ 4
1.2 SPECIFICATION INCLUDES........................................................................................................ 4
1.3 RELATED SECTIONS..................................................................................................................... 4
1.4 REFERENCES................................................................................................................................... 5
1.5 DEFINITIONS ................................................................................................................................... 7
1.6 DATA SUBMITTALS....................................................................................................................... 7
1.7 QUALITY CONTROL ..................................................................................................................... 8
1.8 HEALTH AND SAFETY CONSIDERATIONS............................................................................ 8
1.9 SERVICE CONDITIONS................................................................................................................. 9
1.10 FACTORY TESTING....................................................................................................................... 9
1.11 COORDINATION ...........................................................................................................................10
1.12 DELIVERY, HANDLING AND STORAGE ...............................................................................10
2.0 PRODUCTS ....................................................................................................................................................10
2.1 GENERAL........................................................................................................................................10
2.2 DESIGN AND CONSTRUCTION ................................................................................................11
2.3 SYSTEM GROUNDING ................................................................................................................13
3.0 EXECUTION ..................................................................................................................................................14
3.1 GENERAL........................................................................................................................................14
3.2 INSTALLATION METHOD .........................................................................................................14
3.3 TESTING AND COMMISSIONING............................................................................................15
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification: MQ-SP-T-7805
Project Name: Date: 07 Apr 2011
Contract Number: Page: 4 of 16
Revision: 2
1.0 GENERAL
B. The contractor shall furnish all labor, materials, tools and equipment required to
complete the work.
D. Telephone Instruments
F. Communication Cables
This specification includes the typical telephone instruments, door intercom systems and
communication cables in buildings and Housing Areas.
1.4 REFERENCES
A. The referred codes and standards are intended to provide an acceptable level of
quality for materials, products and workmanship. In case of conflict between these
standards and the text of this specification, the specification text shall govern.
B. The latest revision of the referred codes and standards shall be used wherever
applicable. In case of conflict, the Contractor shall propose equipment, materials and
processes conforming to one group of codes and standards.
SASO 1345: Low Frequency Cables and Wires with PVC Insulation and PVC
Sheath - Part 1: General Testing and Measuring Methods
SASO 1346: Low Frequency Cables and Wires with PVC Insulation and PVC
Sheath - Part 2: Telephone Wire for Inside Applications
IEC 60189: Low Frequency Cables and Wires with PVC Insulation and PVC
Sheath
IEC 60728: Cable Distribution System for Television and Sound Signals
ISO 68-1: General Purpose Screw Threads - Basic Profile -Part 1: Metric Screw
Threads
IEC 60189 : Low Frequency Cables and Wires with PVC Insulation and PVC
Sheath
IEC 60189-2 Part 2: Cables in Pairs, Triples, Quads and Quintuples for Inside
Installation
IEC 60189-3 Part 3: Equipment Wires with Solid or Stranded Conductor, PVC
Insulated, in Singles, Pairs and Triples
ISO 68-1 General Purpose Screw Threads - Basic Profile -Part 1: Metric Screw
Threads
BS 6259 : Code of Practice for the Design, Planning, Installation, Testing and
Maintenance of Sound Systems
UL 810: Capacitors
1.5 DEFINITIONS
A. The Contractor shall submit to MARAFIQ following items for review and approval
before commencing Work:
3. Performance data including mean time between failures (MTBF) and mean time
to repair (MTTR) figures
7. Design calculations
8. A full list of standard and optional system features with descriptions of operation
A. The Contractor shall be responsible for the quality of work and shall develop and
propose programs and methods of construction and testing to achieve the specified
quality to the approval of the MARAFIQ.
3. Contractor
B. In the absence of any of the above, best accepted industry practice shall be employed
throughout.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification: MQ-SP-T-7805
Project Name: Date: 07 Apr 2011
Contract Number: Page: 9 of 16
Revision: 2
a. A maximum of 40°C
b. A minimum of 0°C
c. Average temperature, measured over a period of 1 month, is a maximum of
35°C
a. A maximum of 50°C
b. A minimum of 0°C
c. Average temperature, measured over a period of 1 month, is a maximum of
45°C
2. Altitude is less than 1000 m, unless a higher altitude is specified in Contract
Drawings.
A. The Contractor shall ensure that all tests and inspections are carried out prior to
shipping the equipment by the supplier. The Contractor is responsible to ensure that
all equipment is manufactured in accordance with the design characteristics
mentioned in this Specification. However, MARAFIQ reserves the right to carry out
tests and inspections of equipment if deemed necessary.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification: MQ-SP-T-7805
Project Name: Date: 07 Apr 2011
Contract Number: Page: 10 of 16
Revision: 2
1.11 COORDINATION
A. The Contractor shall be responsible for the proper coordination of all phases of the
work under this Contract.
B. It shall be the responsibility of the Contractor to coordinate the work and equipment
as specified herein, with work to be performed and equipment to be furnished under
other Sections of the specifications, in order to assure a complete and satisfactory
installation.
A. The Contractor shall deliver, handle and store equipment and material units in
accordance with all applicable MARAFIQ Specifications as well as the following
requirements:
1. Ensure equipment and materials are delivered to site originally packed, securely
wrapped and labeled by manufacturer in unopened containers. Protect materials
during delivery to comply with manufacturer’s direction.
2.0 PRODUCTS
2.1 GENERAL
A. All goods and products covered by these Specifications shall be procured, when
available, from an in-Kingdom manufacturer. Procurement of all goods and products
manufactured out-of-Kingdom must be approved by MARAFIQ.
B. Telephone instrument and door intercom system shall comply with Saudi Arabian
Ministry of Communications and Information Technology regulations and related
ITU and CCITT recommendations.
1. The telephone sets shall be equally compatible with the Digital Electronic
Private Automatic Branch Exchange (EPABX), the key system and the local
telephone exchange.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification: MQ-SP-T-7805
Project Name: Date: 07 Apr 2011
Contract Number: Page: 11 of 16
Revision: 2
2. It shall all have push-button dials, and shall be designed to operate efficiently
over long line loops.
4. The equipment shall be suitable for the particular environment and shall be
designed to prevent ingress of all vermin, accidental contact with live parts, and
to minimize the ingress of dust and dirt.
5. The equipment shall withstand mechanical and vibration shock during handling
and transportation, when packaged for shipment with the proportions as
specified in the MARAFIQ Telephone System and Intercommunication
Equipment Specification.
B. Digital Telephones
1. The telephone set shall have at least 12 facility buttons with associated LED’s
and designations. At least half the facility buttons shall be freely programmable
by the user.
2. It shall also be possible to incorporate a loudspeaker function and a digit display
(LCD) in the telephone, showing the number of the calling extension, unless
otherwise specified by MARAFIQ.
3. All normal EPABX features shall be available from the digital telephone.
4. The digital telephones shall also have buttons for secrecy, programming mode
and triple access line.
5. There shall be functions for automatic speech connection and message waiting
indication.
6. It shall be possible to dial directly hands free without waiting for dialing tone.
7. It shall be possible to dedicate the most common features to a programmable
button.
1. The pair density factor suggested for distribution or riser cable requirements
beyond the main terminals is from 5 to 20 pairs per 100 m2, for general
office use. Special use buildings or special use areas in a building must be
estimated on the basis of whatever information is available.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification: MQ-SP-T-7805
Project Name: Date: 07 Apr 2011
Contract Number: Page: 12 of 16
Revision: 2
2. The pair density factors recommended for estimating entrance cable(s) sizes for
various buildings are shown in Table 1 below.
D. Communication Cables
1. Door answering systems shall consist of one or more entrance stations. The
system may also include an electric door opening system.
4. The door station box shall be made of galvanized sheet steel and shall be
provided with rubber gasket to assure weatherproof attachment of the cover
plate.
5. The metal front plate shall include illuminated nameplates and pushbuttons, an
indicating lamp for “ready to communicate” and a push-button for switching on
the entrance illumination.
A. The grounding shall include all cable and installation hardware required. All
equipment shall be connected to earth ground via internal building wiring according
to NEC standards.
3.0 EXECUTION
3.1 GENERAL
B. Deviations from the plans, specifications and construction drawings shall not be
permitted, except upon prior written authority by MARAFIQ.
A. General
1. After award of Contract and within the time period specified in the Contract, the
Contractor shall deliver the total system in a manner that fully complies with the
requirements of this Specification. The Contractor shall make no substitutions or
changes in the system without written approval from MARAFIQ.
2. The Contractor shall install all equipment and systems in a manner that complies
with accepted industry standards of good practice, the requirements of this
Specification, and does not constitute a safety hazard. The Contractor shall
ensure that all installation personnel understands and complies with all the
requirements of this Specification.
3. During installation, the Contractor shall ensure greater flexibility to meet current
and future communication needs.
5. The Contractor shall provide needs for future growth to avoid possible costly
rearrangements.
6. All cables, wires and noisy equipment shall be covered up according to the latest
installation standards.
7. The Contractor shall ensure better compatibility between the STC entrance
facilities, and facilities provided by MARAFIQ.
8. The Contractor shall provide all equipment necessary to meet the requirements
in the above sections as well as all system performance standards.
9. Where telephone or data outlets are installed adjacent to each other, install one
outlet for each instrument.
Power and Water Utility Company for Jubail and Yanbu (MARAFIQ) Master Specification: MQ-SP-T-7805
Project Name: Date: 07 Apr 2011
Contract Number: Page: 15 of 16
Revision: 2
11. The Contractor shall employ the latest installation practices and materials.
12. The Contractor shall guarantee that all installed material and equipment will be
free from defects, workmanship, and will remain so for a period of 1 year from
the date of final acceptance of the system by MARAFIQ.
13. The Contractor shall provide the manufacture’s equipment warranty documents
certifying that all equipment installed under this document conforms to its
published specifications.
A. The Contractor shall carry out all site tests in accordance with approved test
procedures to ensure that the equipment and related accessories comply with
specifications and operational requirements. All tests are subject to witnessing by
MARAFIQ’s representative.
B. At least 4 weeks prior to schedule tests, the Contractor shall submit to MARAFIQ an
outline of the plan and procedures used in performing the site inspection and site
tests. This shall include a brief description of the test equipment, reference drawings,
proposed tests and procedure, test sheets, calculations, reference drawings and
minimum/maximum test and performance values in conformance with the
specification and acceptability of the equipment and acceptability of the installation.
C. Upon completing the installation of the system, the Contractor shall test the entire
system to ensure proper working. The Contractor shall verify that the system is fully
operational and meets all the system performance requirements of this document.
Moreover, the system shall be checked to verify that all performance requirements
and standards are met. The performance requirements shall be verified using the
necessary test equipment.
E. Upon completion of all testing, the Contractor shall submit 5 copies of certified
reports attesting that each test has been performed in accordance with the approved
test procedures. The report for each test shall include the name of the person in-
charge of the test and the date of performance. All factory and field test reports shall
be included in Operation and Maintenance Manual.
1. Continuity test and loop resistance, unbalance resistance, opens, shorts, crosses,
grounds and insulation resistance.