& JSA AND RISK ASSESSMENT FORM
QC-HSE Doc. No. 201488—PIPE—JSA—003_[Rev. No.0
HSE Date 20 November S016 Page | of 2
i PT. ADHIKARYA (PERSERO), Tok. Prepared By _| Reviewed By “Appipved By — Owner
7 ‘AMMONIA UREA PROJECT (APPLICATOR E PK PKG
Person In Charge Inturtg Pr i NAME, dv-dpwem by | Novien- 5 cuufamy | Widede
Position / Tittle of Job |
= —— ee seoarune | AR (Ta ==
Date 2 Novencor SOF DATE [toneveripor Ses) Never 200 fT |e V0.
wonce of Basie men ss
San eae, a Consequence | __ Risk Assessment Recommended Action Risk Assessment
ae Pato | aia PR | sv | RR crooner [pr [sve
Dropped abject |= Human 2" Personalinjury, | 3 | 3 | 9 | Ensure thatno body 1 73 [3
‘consequences | hit by material passing/working under the object,
blocks; lever or equipment except if consider necessary by
blocks; shackles; Rigging Supv. and the number of
personnel shall be as minimum as
posible and ling gears use
Property;
= Control and make sure that
sling(s), chain block, lever block
and shackle(s) are installed
property and certified before liting
the module;
= Controlcheck and make sure that
Pull; etc)
7 Fees ‘SWLof sings, chain block, lever
= wateriat ——} (Materia nla Ocoee
consequences | damage) the writen procedure;
- ControVcheck and make sure that
part line quantity of iting,
‘equipmentis capable for iting
object,
- Prolif the object wth gradual
increase;
- Wearing proper PPE (Personal
Protective Equipment)
~ Only experienced & qualified /
trained personnel are handling
lining devices.JSA AND RISK ASSESSMENT FORM.
OCHRE Do No OAS PIPE=JSA~0B [Rev No
SE Dae Faseda
oP Ser er rere
: F cae a =
gages | mares
nm eet ‘nie on ee |
SER RTE eT
‘mt | scone | SRST EeteTommrereSe | | om | coma [enrnoee
- SE ata lyme nin
es oe ee ieee eee so ra oe
Tos oar — | aie ee ee : :
| Beer ‘Siete been tte eon mT «| =
ns Zoeaeeecnass
aa eee eee remem
er es oe a
7 , Tote wT erapen gma! Wa erase Tip :
eos | trond aioe | tet ser marten OO Bonn a ng arn ec