You are on page 1of 5

Contact Info Site Plan

Address
Project: Drilling Invest
Company Name
City, State/Province Number: 001
Client: Laa Hydro
Location: Scale 1:1000 Map Origin [m] X: 0 Y: 0

Well 1
Contact Info Wells
Address
Project: Drilling Invest
Company Name
City, State/Province Number: 001
Client: Laa Hydro
Location:

b L Aquifer

R
B

Test bore
Name X [m]
Contact Info Lugeon Test Summary - Well 1
Address
Project: Drilling Invest
Company Name
City, State/Province Number: 001
Client: Laa Hydro

Test Interval Graphs Result


Top
Bottom
20
1 16 1

Flow [l/min]
10.000 m 2 2
15.000 m 12
Step

Step
3 3
8
4 4
5 4 5
0
0 0.3 0.6 0.9 1.2 0 0.3 0.6 0.9 1.2 0 10 20 30 40 50
Pressure [bar] Pressure [bar] Lugeons
0
1 0 1
m 2 2
Flow [l/s]

m 0
Step

Step
3 3
0
4 4
5 0 5
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Pressure [bar] Pressure [bar] Lugeons
Contact Info Lugeon Test Analysis Report
Address
Project: Drilling Invest
Company Name
City, State/Province Number: 001
Client: Laa Hydro
Location: Lugeon Test: Lugeon Test 2 Tested bore: Well 1
Test Conducted by: Test Date: 2/24/2021
Analysis Performed by: Analysis Date: 2/24/2021
Lithology:

Top of Test Interval: 10.000 m


Bottom of Test Interval: 15.000 m
Length of Test Interval: 5.000 m
Gauge Position: 0.000 m
Depth to Groundwater: 5.000 m
Radius of Test Section: 0.032 m

Step Pressure [bar] Flow Meter Readings [l] Average Flow Hydraulic Conductivity
1 2 Rate [l/min] [m/s] [m/d] Lugeon
-6
1 0.3 20.0 30.0 10.0 3.3253184 × 10 0.287 25.3
-6
2 0.6 30.0 50.0 20.0 4.8207787 × 10 0.417 36.7
-6
3 1.0 60.0 80.0 20.0 3.5269163 × 10 0.305 26.8
-6
4 0.4 70.0 90.0 20.0 5.9036704 × 10 0.510 44.9
-6
5 0.4 100.0 120.0 20.0 5.9036704 × 10 0.510 44.9
-6
Average
4.6960709 × 10 0.406 35.7

20
1 16 1
Flow [l/min]

2 2
12
Step

Step

3 3
8
4 4
5 4 5
0
0 0.3 0.6 0.9 1.2 0 0.3 0.6 0.9 1.2 0 10 20 30 40 50
Pressure [bar] Pressure [bar] Lugeons
Contact Info Lugeon Test Analysis Report
Address
Project: Drilling Invest
Company Name
City, State/Province Number: 001
Client: Laa Hydro
Location: Lugeon Test: Lugeon Test 1 Tested bore: Well 1
Test Conducted by: Test Date: 2/24/2021
Analysis Performed by: Analysis Date: 2/24/2021
Lithology:

Top of Test Interval: m


Bottom of Test Interval: m
Length of Test Interval: m
Depth to Groundwater: m
Radius of Test Section: 0.032 m

Step Pressure [bar] Flow Meter Readings [l/s] Average Flow Hydraulic Conductivity
1 2 3 4 Rate [l/s] [m/s] [m/d] Lugeon
1
2
3
4
5
Average

0
1 0 1
2 2
Flow [l/s]

0
Step

Step

3 3
0
4 4
5 0 5
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Pressure [bar] Pressure [bar] Lugeons

You might also like