Electricity Bill Feb-2018 (Reshma Power)

You might also like

You are on page 1of 1
& Pakistan Water And Power Development Authi Reshma Power Generation (Pvt) Ld rity JOINT MONTHLY METER READINGS * Billing Month: BEBRUARY-2018 Car Mel MS DATE (TIME: 01.05.2018 / 149 Hrs, PRIMARY METERS USRRA) [41807306 41807208 BACK-UPMETERS (SKRA) J 41307300 #is07340 IMPORT ENERGY PRIMARY ENERGY METH TRCKCUP ENERGY METERS | : ACINE REACTIVE ACTIVE REACTIVE DATE Cae (MWHs) (MVARHs) (MWHS) (MVARHS) we wa wes we wa Xia BE} areas | moons | aea06 | Bore | son | wos | wero | mam | vam | ion Sician-2078 | 2400Him | 263.06 | _a26a9__| reson | 12077 | saree | aszan | Wwosaa | vais ADVANCE 0.00 025 0.00 068 0.00 024 0.00 oe | [GNTTS (th & AYart) 250.00 680.00 240.00 srn00 limronrED (rts) ovat Meter MDI (AW) 000 a0 0.00 010 sing (Cal) MDL IW) 2.0 ono MDI Reset count 9 3 a | #2 few (any) 336 855 147 | 19.86 PRIMARY ENERGY METERS BACKUP ENERGY METERS | | REACTIVE NETWE REACTIVE a TP (MVARTs) (MWHs) (MVARIs) Mei a wer | vr wa 5 BE] Doris” | a7s598_|_sioesar | ssrear | m9? | raasn | slo9sa7 | 55608 | Tae038 3iaian20i8_| 2400 HS | 1475398 | soae77 | 3s7ear 14749.11 | 3050842 | 383608 | Taare ADVANCE 0.00 rosr0a [0.00 ooo [nes [ — 00 [ain eA, 1087040.00, 216720.00 1086950.00 214030.00 [exponen cares) naval Neer DE Qa) | O00 3781 Tm [ane Bing (Cal) MDL CW) vai 383 [MDI Reset count 3 2 a fexro eww) 37007 aera | a5 Siner [Mveh-IMP) | (Mwh-EXP) ma 0.00% [0.00% M3 ‘4.00% [1.008% [cumalatve | 400% | 0.01% Note: Meter Testing & Sealing com {ee rectify the problem Time & Date error of four Mi jeters on dated 21-02-2018. FOR APGL FORNTOC FORLESCO NAME: M. Zubair Akhtar NAME: Qamar Fahim Khan NAME: Aftab Hussain Butt DESIG: General Manager DESIG Aa Manager (Pa) 2206 Wap Town DESIG. Addl. Manager (PGA), LESCO NGias A- SIGN, SIGN.

You might also like