Professional Documents
Culture Documents
Compare the 3 total costs in the Total column, we notice that St. Louis has the lowestcost with 2.920 million $.
Therefore, the best option would be St. Louis with a total cost of 2.920 million $
he new Texago refinery
Total
$ 3,070
$ 3,120
$ 2,920