You are on page 1of 1

Actual Loads

Wind speed = 35 m/s GH = 1.69


Actual Loads Size Dept Qty, n Elevation Kz Fa Fa*Gh*Kz*n Base Moment
(m) (m) (kN) (kN) (kN-m)
LR 0.20 Ø x 2.0m GSM 1 30 1.3687 0.016 0.04 1.08
PANEL 900 MHZ GSM 3 29 1.3555 0.713 4.90 142.10
HP 0.30 DIA. MW 4 28 1.3420 0.120 1.09 30.48
PANEL 1800 MHZ GSM 1 26 1.3139 0.534 1.19 30.83
HP 0.30 DIA. MW 1 24 1.2842 0.120 0.26 6.25
PANEL 900 MHZ GSM 1 25 1.2992 0.713 1.57 39.14
3G 2100 MHZ GSM 1 25 1.2992 0.538 1.18 29.53
HP 0.30 DIA. MW 1 24 1.2842 0.120 0.26 6.25
HP 0.60 DIA. MW 1 23 1.2687 0.350 0.75 17.26
HP 0.30 DIA. MW 1 23 1.2687 0.120 0.26 5.92
HP 0.30 DIA. MW 2 22.5 1.2607 0.120 0.51 11.51
HP 0.30 DIA. MW 1 23 1.2687 0.120 0.26 5.92
NEW LTE 1 GSM 3 26.00 1.314 0.538 3.58 93.18
Tubular Poles 25.0m high GSM LS N/A 2 1.000 N/A 2 N/A 2 3734.14
Mounted Poles 2.0M high GSM LS N/A 2 1.000 N/A 2 N/A 2 2.26
Cantilevered Lattice 4.0m high GSM LS N/A 2 1.000 N/A 2 N/A 2 111.26
Total Base Moment = 4267.11
% Comparison of original design loads versus actual loads = 0.7522 < 1.0

Page 5 of 11

You might also like