Professional Documents
Culture Documents
KEGIATAN : PENYEDIAAN DAN PENGEMBANGAN PRASARANA DAN SARANA PERTANIAN TANAMAN PANGAN DAN DORTIKULTURA
T.A. : 2017
JUMLAH
NO. URAIAN PEKERJAAN HARGA
(Rp.)
JUMLAH 130,909,090.92
PPN 10 % 13,090,909.09
DIBULATKAN 144,000,000.00
Dibuat Oleh:
Konsultan Perencana
Team Leader
Standarisasi Harga Barang Listrik
1 2 3 4 5 6
A. STANDAR HARGA KELISTRIKAN
1 ARMATURE HPLN 80 W Fiber Buah 513,480
HPLN 125 W Fiber Buah 471,900
HPLN 250 W Fiber Buah 514,800
HPLN 80 W Alumunium Kaca Buah 608,520
HPLN 125 W Alumunium Kaca Buah 653,400
HPLN 250 W Alumunium Kaca Buah 688,800
PLC CAPING E27 Set 104,400
TL 40 W Set 108,000
Sorot 400 W MHL + Ornament Set 2,100,000
Sorot 175 W MHL Set 1,594,800
Sorot 1000 W MHL Set 8,267,160
Sorot 2000 W MHL Set 12,672,000
Lampu SON 70 W,Cap Fiber
Buah 582,000
Alumunium
112
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
uk. 10 mm Buah 20,250
uk. 4 mm Buah 15,000
uk. 2,5 mm Buah 10,500
9 CAPASITOR 8 µF Buah 75,000
10 µF Buah 75,000
12 µF Buah 121,000
18 µF Buah 82,500
25 µF Buah 90,000
32 µF Buah 105,000
113
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
9 CAPASITOR 50 µF Buah 127,500
10 CONTROLER LAMPU HIAS 3 Jalur - Unit 812,400
11 CONTACKTOR 3 Phase 35 A - Buah 667,200
3 Phase 50 A - Buah 936,000
12 CIRCUIT BREACKER 100 A - bh 804,000
150 A - bh 1,668,000
13 CABEL TIES Width 3,6 mm 0,14" - bks 55,200
Width 4,8 mm 0,19" - bks 92,400
14 ELEKTRODA 2,6 mm - bks 137,700
15 FITTING Fitting Gantung Out Door E27 Keramik bh 25,200
Fitting duduk E27 Keramik bh 19,200
Fitting duduk E40 Keramik bh 26,400
Fitting Pijar Plapon - bh 14,400
FUSE 4A + Soket Box set 10,516
16 FUSE BOX 1 Group - bh 14,400
4 Group - bh 37,200
17 GARDU Treck Schoer lkp TR - set 936,600
Arester 24 KV lkp - bh 1,319,640
Pentanahan 5,5 mm lkp - set 710,114
Pentanahan 2,75 mm lkp - set 249,163
114
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
TC 2x 16mm - mtr 10,800
TC 2 x 25 mm - mtr 15,600
TC 4 x 16 mm - mtr 30,240
TC 4 x 25 mm - mtr 34,800
TC 4 x 35 + 1 x 25 mm - mtr 50,400
TC 3 x 35 + 1 x 25 mm - mtr 26,400
TC 3 x 50 + 1 x 35 mm - mtr 58,800
TC 3 x 70 + 1 x 50 mm - mtr 73,200
115
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
23 KABEL NYFGBY 2x1,5 mm - mtr 32,400
NYFGBY 2x2,5 mm - mtr 37,200
NYFGBY 2x4 mm - mtr 42,000
NYFGBY 2x6 mm - mtr 63,600
NYFGBY 2x10 mm - mtr 78,000
NYFGBY 2x16 mm - mtr 106,800
NYFGBY 2x25 mm - mtr 150,000
NYFGBY 2x35 mm - mtr 208,800
NYFGBY 2x50 mm - mtr 242,400
NYFGBY 4x1,5 mm - mtr 43,200
NYFGBY 4x2,5 mm - mtr 48,000
NYFGBY 4x4 mm - mtr 62,400
NYFGBY 4x6 mm - mtr 82,800
NYFGBY 4x10 mm - mtr 121,200
NYFGBY 4x16 mm - mtr 175,800
NYFGBY 4x25 mm - mtr 242,400
NYFGBY 4x35 mm - mtr 308,400
NYFGBY 4x50 mm - mtr 396,000
NYFGBY 4x70 mm - mtr 538,800
NYYHY 2x1,5 mm - mtr 11,520
NYYHY 2x2,5 mm - mtr 21,600
NYYHY 3x4 mm - mtr 81,000
NYM 2x1,5 mm - mtr 11,400
NYM 2x2,5 mm - mtr 15,000
NYM 3x1,5 mm - mtr 16,200
NYM 3x2,5 mm - mtr 17,400
NYMHY 2x0,75 mm - mtr 16,560
NYA 1,5 mm - mtr 9,000
NYA 2,5 mm - mtr 10,380
NYA 4 mm - mtr 11,400
NYAF 2,5 mm - mtr 18,480
NYAF 4 mm - mtr 23,400
NYY 2x1,5 mm - mtr 16,200
NYY 2x2,5 mm - mtr 19,080
NYY 2x4 mm - mtr 24,600
NYY 2x6 mm - mtr 40,200
NYY 2x10 mm - mtr 54,000
NYY 3x2,5 mm - mtr 37,200
NYY 3x4 mm - mtr 75,600
NYY 3x6 mm - mtr 78,000
NYY 4x1,5 mm - mtr 24,000
NYY 4x2,5 mm - mtr 27,600
NYY 4x4 mm - mtr 46,800
NYY 4x6 mm - mtr 51,744
NYY 4x10 mm - mtr 138,000
NYY 4x16 mm - mtr 147,600
NYY 4x25 mm - mtr 165,600
NYY 4x35 mm - mtr 220,200
116
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
NYY 4x50 mm - mtr 297,600
NYY 70 mm - mtr 129,000
KABEL TIES Stenlis 4,2 mm 52 cm buah 33,789
24 KLEMP Klemp Beugel - bh 112,200
Double Klemp Beugel - bh 92,400
Clamp Standrat - bh 18,000
Paku Clamp (Shadel) 6-8 mm - bks 4,440
Paku Clamp (Shadel) 8 mm beton - bks 45,600
117
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
24 KLEMP Paku Clamp (Shadel) 12 mm beton - bks 53,400
25 KAWAT Kabel Baja (Sling) 4 mm - mtr 8,040
Kabel Baja (Sling) 6 mm - mtr 11,000
Jarum Keras Kecil bh 18,750
Kawat No.14 - Kg 22,680
26 KAIN Screen Asahi - Roll 275,400
27 LAMPU Lampu Hias Jenis Kelapa 4m set 38,400,000
Lampu Hias Jenis Bunga SK 0801 - 5m set 48,000,000
Lampu Hias Jenis Bunga SK 1601 - 4m set 48,000,000
Lampu Hias Jenis Bunga SK 1901 - 4m set 48,000,000
Lampu Hias Jenis Bunga SK 2801 - 6m set 54,600,000
Lampu Hias Jenis Bunga SK 2802 - 5,5 mm set 55,440,000
Lampu Hias Jenis Bunga SK 4502 - 4,5 mm set 492,000
Lampu Hias Gantung Plastik / Mika bh 112,500
Lampu Hias Antik lkp DF7038A/2 set 3,975,000
Lampu Hias Selang 1 Line 1 Warna mtr 52,500
Lampu Hias Selang 2 Line 1 Warna mtr 40,500
Lampu Hias Selang 3 Line 1 Warna mtr 40,500
Lampu Hias Selang 3 Line 3 Warna mtr 67,650
Lampu Hias Rice Light 1 Warna / 8M set 108,000
Lampu Neon Ultra - set 168,000,000
Fiber Optic Lamp - Unit 10,560,000
LED light string - bh 222,000
Lampu Tirai GSM - bh 600,000
Flexistar LED - bh 435,600
Lampu Sorot HPIT-Plus 150 W / E40 bh 300,000
250 W / E40 bh 330,000
400 W / E40 bh 349,200
1000 W / E40 bh 1,452,000
Lampu Sorot HPIT SON 150 W / E40 bh 300,000
250 W / E40 bh 330,000
400 W / E40 bh 349,200
Lampu SON 70 W - bh 150,000
Lampu SON 100 W - bh 232,500
Lampu HPLN 80 W / E27 bh 174,000
125 W / E27 bh 222,000
Lampu PLC 10 W / Garansi bh 46,200
20 W / Garansi bh 60,000
23 W / Garansi bh 62,400
32 W / Garansi bh 64,800
40 W / Garansi bh 120,000
45 W / Garansi bh 129,600
65 W / Garansi bh 252,000
70 W / Garansi bh 306,000
90 W / Garansi bh 307,200
Lampu TL 40 W SNI bh 27,600
20 W SNI bh 21,600
Neon Sign - bh 26,400,000
118
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
Lampu DC TL 10 W - unit 31,200
HQI-E - bh 252,000
Fire Lamp G075 - unit 4,452,000
Bamboe Light DC 10 - unit 30,240,000
Lampu Taman Bunga - unit 31,920,000
Lampu Pijar 10 W bh 9,240
15 W bh 9,240
119
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
27 LAMPU Lampu Pijar 25 W bh 9,240
40 W bh 9,240
60 W bh 14,400
75 W bh 14,400
100 W bh 14,400
Lampu SSL LED 10W/12V ceramic hight power led set 2,364,000
Lampu SSL LED 20W/12V ceramic hight power led set 2,748,000
Lampu SSL LED 25W/12V ceramic hight power led set 2,820,000
Lampu SSL LED 30W/12V ceramic hight power led set 2,976,000
Lampu SSL LED 40W/12V ceramic hight power led set 3,348,000
Lampu LED Bulb 3 W / Garansi bh 166,800
5 W / Garansi bh 198,000
7 W / Garansi bh 237,600
Lampu LED Tube 10 W / Garansi bh 354,000
15 W / Garansi bh 436,800
20 W / Garansi bh 573,600
Lampu LVD 100 W + Armature set 3,450,000
80 W + Armature set 2,950,000
Lampu LVD 60 W + Armature set 2,450,000
40 W + Armature set 1,950,000
23 W + Armature set 1,750,000
28 MASTER KEY Standar - set 389,400
29 MINI CIRCUIT BREAKER MCB 2 A - bh 42,000
MCB 4 A - bh 42,000
MCB 6 A - bh 73,200
MCB 10 A - bh 73,200
MCB 20 A - bh 98,400
MCB 32 A - bh 98,400
MCB 40 A - bh 156,000
30 ORNAMENT Ornament PLC Pipa 1" - 1m lkp set 156,000
Ornament HPLN/HPIT/SON Pipa Besi 1,5" - 1,5 m set 372,000
Pipa Besi 1,5" - 2 m set 408,000
Pipa Besi 1,5" - 3 m set 420,000
Pipa Besi 1,5" - 4 m set 480,000
Pipa Besi 1,5" - 5 m set 564,000
uk. 2''-6 m buah 821,374
uk. 1,5"-6 m buah 562,500
120
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
Global Posisioning System - unit 17,400,000
Tool Kit - unit 1,386,000
RIG buah 12,000,000
Lemari Loker besi buah 2,000,000
Rompi Kerja buah 345,000
Grounding Tester buah 9,500,000
BENHID buah 1,500,000
121
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
Pengecas Aki buah 1,700,000
Puller NGK 2T Uk. 2T buah 3,375,000
uk. 1,5T buah 2,625,000
Cuttrick buah 2,540,000
CengHock buah 4,870,000
Tripot buah 1,556,000
Ragum buah 1,450,000
Gurinda Duduk Listrik buah 6,700,000
Tangan Listrik buah 1,800,000
Stand Bor buah 2,500,000
Sabuk Pengaman buah 3,800,000
Bor Tangan Listrik buah 1,700,000
Pipe Bending buah 12,000,000
Flux Meter buah 965,000
Lampu Emergency (mobil) buah 695,000
Rambu Pengaman Jalan buah 530,000
Tongkat Lampu buah 435,000
Teleskoping Isolator Sticks Uk. 4x1,5 m buah 7,800,000
uk. 9 m buah 15,000,000
Isolating Glove Kapasitas Teg. 20 kv buah 1,015,000
122
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
42 STATER Stater TL 40 W - bh 7,920
43 STOP KONTAK Out Bow 1 Lobang bh 22,200
2 Lobang bh 42,000
3 Lobang bh 42,000
4 Lobang bh 42,000
In Bow - bh 63,600
44 STEKER - - bh 45,600
45 SCHOEN 4 mm - bh 6,600
6 mm - bh 9,000
123
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
46 SOLAR CELL/PLTS Modul Surya 50 WP -12 VDC bh 4,164,000
60 WP - 12 VDC bh 4,500,000
80 WP - 12VDC bh 5,500,000
100 WP - 12VDC bh 6,727,500
120 WP - 12VDC bh 7,578,500
130 WP - 12VDC bh 7,981,000
50 WP - 24VDC bh 4,255,000
100 WP - 24VDC bh 8,625,000
150 WP - 24VDC bh 12,075,000
Electronic BOX Sistem (EBS) 10A-12VDC/220VAC-500W set 3,300,000
30A-12VDC/220VAC-1000W set 4,500,000
Inverter 500 W, 12V-220V bh 1,115,500
600 W, 12V-220V bh 1,426,000
1000 W, 12V-220V bh 2,288,500
Battery Charger Regulator (BCU) 12V/10A & PWM Charge Mode bh 1,176,000
12V/20A & PWM Charge Mode bh 1,404,000
Battery Charger Controller 12V/10A & PWM Charge Mode bh 1,476,000
12V/20A & PWM Charge Mode bh 1,884,000
BOX Panel System SHS (Plate Powder Coating + Aksesoris
Outdoor powder Coating) set 1,970,000
124
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
Base Plate Flandes + Angkur 200 mm x 200 mm x 700 mm set 850,000
47 SUTM Tiang Besi 11 mtr - 156 daN - btg 5,367,120
Pin Insulator 24 KV lkp - bh 326,280
Cut Out 20 KV + fuse link 6A - set 1,472,400
Traves UNP 10 - 200 cm + lkp be - set 500,400
Breace 800mm lkp pole band - set 81,312
Strain Clamp Suspension uk. 3 - bh 49,768
Joint Sleave uk. 35 mm - bh 49,672
125
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
48 SUTR Dead Angle ass 35-70 mm - bh 81,840
Large Angle ass 35-70mm - bh 105,960
Compresion Joint uk.35 mm AL - bh 44,160
Compresion Joint uk.25 mm AL - bh 43,200
Compresion Joint uk.35-70 mm AL/CU u. - bh 79,800
Compresion Joint uk.25 mm AL/CU u.TR - bh 57,600
49 SOKET LAMPU SELANG 3 Line - bh 56,700
2 Line - bh 52,500
50 TRAFO TL 40 W - bh 49,200
HPLN 80 W - bh 158,400
HPLN 125 W - bh 158,400
SON 70 W - bh 138,600
SON 100 W - bh 174,000
HPIT - Pluse 150 W - bh 224,400
HPIT - Pluse 250 W - bh 249,600
HPIT - Pluse 400 W - bh 294,000
HPIT - Pluse 1000 W - bh 2,032,800
HPIT SON 150 W - bh 277,200
HPIT SON 250 W - bh 351,600
HPIT SON 400 W - bh 378,000
Trafo Distribusi 100 KVA / 20 KV 3 Phase bh 53,220,000
Trafo Distribusi 50 KVA / 20 KV 3 Phase bh 43,380,000
Trafo Distribusi 25 KVA / 20 KV 3 Phase bh 36,600,000
51 TAPPING CONNECTOR Uk. 6-25/35-70 mm - bh 22,200
Uk. 35-70/35-70 mm Double Baut bh 51,600
52 TIANG 11 m / 156 daN - btg 6,460,800
11 m / 200 daN - btg 10,200,000
9 m / 90 daN - btg 5,338,200
9 m / 100 daN - btg 5,832,000
Besi PJU 8m,2",3",4" - btg 2,583,600
Single Ornament Antik Uk. 9 m btg 8,041,364
Galvanis Oktagional Single
10 m btg 12,538,680
Ornament
Galvanis Oktagional Double
10 m btg 13,207,410
Ornament
53 TIMER / TIME SWICTH SUL 181H - bh 633,600
54 TWINKLE LIGHT LED - set 121,500
55 TERMINAL 16 mm SNI - bh 32,400
126
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
Baterai Deep Cycle MF
4 - MF 1x65AH 12V Buah 3,984,288
1x100AH 12V
PEMBANGKIT LISTRIK
TENAGA ANGIN
Pembangkit Listrik Tenaga
1 - Horizontal Axis set 53,425,680
Angin
127
Standarisasi Harga Barang Listrik
HARGA
SATUAN (Rp.)
NO JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
1 2 3 4 5 6
WALIKOTA SINGKAWANG,
ttd
Untuk salinan yang sah sesuai aslinya AWANG ISHAK
Sekretaris Daerah Kota Singkawang
YASMALIZAR, SH
Pembina Tk. I
NIP.19681016 199803 1 004
128
STANDARISASI HARGA BAHAN BANGUNAN
NO JENIS DAN NAMA BARANG SPESIFIKASI SATUAN HARGA SATUAN (Rp.) Keterangan
1 2 3 4 5 6
A. BAHAN PENGISI
- Kg 2,300.00
17 Sirtu - M3 253,500.00
Pilihan M4 265,171.00
B. BAHAN MINYAK
53
STANDARISASI HARGA UPAH KERJA
HARGA SATUAN
NO. JENIS DAN NAMA BARANG/JASA SPESIFIKASI SATUAN KET
(Rp.)
1 2 3 4 5 6
A. STANDAR UPAH KERJA
1 Kepala Tukang - Hari 167,000
A. TENAGA
1. Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2. Mandor L.04 OH 0.0500 130,000.00 6,500.00
B. BAHAN
C. PERALATAN
A. TENAGA
1. Pekerja L.01 OH 0.7500 120,000.00 90,000.00
2. Mandor L.04 OH 0.0250 130,000.00 3,250.00
B. BAHAN
C. PERALATAN
Pengurugan Kembali 1 M3 Galian Dihitung Dari 1/3 Dari Koefisien Pekerjaan Galian
HARGA SATUAN JUMLAH HARGA
NO KODE SATUAN KOEFISIEN
( Rp. ) ( Rp. )
A. TENAGA
1. Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2. Mandor L.04 OH 0.0083 130,000.00 1,083.33
B. BAHAN
C. PERALATAN
A. TENAGA
1. Pekerja L.01 OH 0.5000 120,000.00 60,000.00
2. Mandor L.04 OH 0.0500 130,000.00 6,500.00
B. BAHAN
C. PERALATAN
A. TENAGA
1. Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2. Mandor L.04 OH 0.0100 130,000.00 1,300.00
B. BAHAN
1. Pasir Urug M3 1.2000 170,500.00 204,600.00
C. PERALATAN
A. TENAGA
1. Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2. Mandor L.04 OH 0.0100 130,000.00 1,300.00
B. BAHAN
1. Tanah Datang M3 1.2000 111,195.00 133,434.00
C. PERALATAN
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
A. Sewa Tanah M2 -
B. PERALATAN
Periksa lembar 1.2-2 1.00 5,870,000.00 5,870,000.00
C. FASILITAS KONTRAKTOR
1 Base Camp/Direksi Keet Unit - -
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Jembatan Darurat LS - -
2 Pemeliharaan Jalan Kerja / Samping LS -
E.II. LAIN-LAIN
1 Papan Nama Kegiatan Unit 2.00 450,000.00 900,000.00
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. 1.2
JENIS PEKERJAAN MOBILISASI Lembar 1.2-2
B. PERALATAN
8 DUMP TRUCK 6 TON E08 Unit 2.00 800,000.00 1,600,000.00
10 EXCAVATOR 80-140 HP E10 Unit 1 570,000.00 570,000.00
13 MOTOR GRADER >100 HP E13 Unit 1.00 - -
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1.00 3,700,000.00 3,700,000.00
25 TAMPER E25 Unit 1 -
A. TENAGA
B. BAHAN
C. PERALATAN
Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk
bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian
Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar
dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. 3.2.2.a Analisa EI-322
JENIS PEKERJAAN Timbunan Pilihan
SATUAN PEMBAYARAN M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Faktor pengembangan bahan (padat ke asli) Fv 1.11
7 Tebal hamparan padat t 0.15 M
8 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv1 0.90 Faktor konversi
Waktu sklus Ts1 dihapus, masuk
- Menggali, memuat T1 0.32 menit dalam waktu
- Lain lain T2 0.10 menit siklus
Waktu Siklus = T1 x Fv Ts1 0.42 menit disesuaikan
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 14.63 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 102.39 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2735 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0684 Jam
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
ALAT ALAT ALAT JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN dan PERAWATAN UPAH TOTAL BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA SEWA ALAT
ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) % % (Rp.) - (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No. JENIS PERALATAN KODE f1 x HP x 1 Orang 1 Orang
ALAT i(1+i)^A (B - C) x D 0.002 x B 12 2.5 Harga BBM 0.0625 (g1 x B') 0.125 (g1 x B') Per Per
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----- s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
(1+i)^A-1 W W 15 3 f2 x HP x 0.0875 W 0.175 W = =
Harga Olie Rp23,857.1 Rp14,571.4
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G g1 G H I J K L
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 17 18 19 20 21 22 23
1. DUMP TRUCK 6 TON E08 100.0 6.0 Ton 300,000,000.00 5.00 5,000.00 300,000,000.00 30,000,000.00 0.26 14,245.06 120.00 14,365.06 0.15 0.03 319,275.00 0.09 5,250.00 0.18 10,500.00 23,857.14 14,571.43 373,453.57 387,818.64 Pek. Berat
2. EXCAVATOR 80-140 HP E10 133.0 0.9 M3 1,100,000,000.00 5.00 5,000.00 1,100,000,000.00 110,000,000.00 0.26 52,231.90 440.00 52,671.90 0.15 0.03 424,635.75 0.09 19,250.00 0.18 38,500.00 23,857.14 14,571.43 520,814.32 573,486.22 Pek. Berat