You are on page 1of 4
DEVELOPMENT CORPORATION By: Party ofthe Second Part T° AVAILABILITY OF FUN (i202) oR Ox. As By: Party of the First Part = 03 090426 i F.EVANGELISTA Attorney V (Witness) g rwlgely |. LAXAMANA, JR. rabident ‘f la 3 ITA Q, DELA CRI g = ae sz 6 Regional eae REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGWAYS Region Il OFFICE OF THE REGIONAL DIRECTOR Sindalan, Cty of San Fernando, Pampanga CONTRACT AGREEMENT THIS AGREEMENT, made this 5 day of April 2021 between the Department of Public Works and Highways, with offices address at Sindalan, City of San Fernando, Pampanga, represented by ROSELLER A. TOLENTINO - Regional Director (hereinafter called the “Owner’) and LEADWAY CONSTRUCTION & DEVELOPMENT CORPORATION, with office address at #8004 Purok 8 Mining, Angeles City, Pampanga, represented by RODIGAR M. LAXAMANA, JR. ~ President (hereinafter called the “Contractor’). WHEREAS, the Owner is desirous that the Contractor execute 21€00056: Network Development Program - Construction of Missing Links/New Roads, Capas - Botolan Road (Baquilan Bridge 1), Province of Zambales and has accepted the bid for One Hundred Four Million Eight Hundred Eighty One Thousand Four Hundred Ninety Nine Pesos and 25/100 Only (P 104,881,499.25), by the Contractor for the execution and completion of such Works, within contract duration of Two Hundred Seventy (270) calendar days, and the remedying of any defects therein. The calculated unit bid prices showm in the attached Bill of Quantities are tabulated hereunder: New Unit ItemNo. | Description | Unit | Quantity | Unit Cost | Cost(Disc= | Amount 0.91%) PARTA | FACILITIES FOR THE ENGINEERS Provision of Field Office for the Engineers (Rental Basis) Alt (8) mo.| 9.00 6,272.00 | 6,214.92 55,934.28 Provision of Furnitures/ Fixtures, | A.2.1(11) | Equipment & Is | 1.00 | 89,271.43 | 88,459.06 88,459.06 Appliances for the Field Office for the Engineers Provision of 4x4 Pick-up Type A1.2(2) | Service Vehiclefor | mo.} 9.00 | 22,579.20 | 2237373 | 201,363.57 the Engineer on Bare Rental Basis Operation and Maintenance of A1.2(5) | 4x4PickupType | mo.| 9.00 | 12,544.00 | 12,429.85 | 111,868.65 Service Vehicle for ‘the Engineer ‘Sub-Total PART A 457,625.56 Page 1of 4 2100056: Network Development Program ~ Construction of Missing Links/New Roads, Capas ~Botolan Road (Boqullan Bdge 1), Province of Zambales New Unit ItemNo.| Description | Unit | Quantity | Unit Cost | Cost (Disc= | __ Amount § 0.91 %) 2 PARTB | OTHER GENERAL REQUIREMENTS Z>, Project Billboard 533 85 _| Signboards ea. | 300 | 7,698.88 | 7,628.82 22,886.46 u gS ‘Occupational ge 8.7(2) | SafetyandHealth | 1s. | 1.00 | 222,743.81 | 220,716.84] 220,716.84 Program ‘Mobilization/ 89 | Serotitastion | ' | 100 | 923,983.97 | 915,575.72 | 915,575.72 ‘Sub-Total PARTB 1,159,179.02 5 Tt PARTC | EARTHWORKS ee $ i Structural ge 3 103(1)8 | Excavation, Soft | cum.| 2,221.06 | 59650 | 591.07 | 1,312,801.93 sé 22 Rock a2 £8. Embankment gg 55 104(2)a | From Borrow cum.| 1,650.00 | 683.25 | 67703 | 1,117,09950 4 SB (Common Soil) L Zs 3° ‘Sub-Total PART C 2,429,901.43 : : 3 PARTF | BRIDGE CONSTRUCTION gs a Concrete Piles Cast 400(17)f | in Drilled Holes m. | 666.00 | 73,753.02 | 73,081.87 | 48,672,525.42 (1.30m dia) ‘aoo(aaynt | Permanent Casing, tam tommihice | ™ | 333.00 | 32,202.30 | 31,909.26 | 10,625,783.58 8 Pile integrity 8 g < 40002616 | Testing, cow Strain | &% | 1800 | 54,063.11 | s3s7i.14 | 96428052 - = High Str 5 S= 400(27) | DynamicTesting | ea. | 3.00 | 326,889.97 | 323,915.27 | 971,745.81 = weg (PDA) a ge Reinforcing Steel, i—eH 40aia | Cteay kg. | 7623753 | 74.11 73.44 | 5,598,884.20 s zg Reinforcing Steel, A z 40aityb | ervey kg. | 24211675 | 75.72 75.03 | 18,166,019.75 2 5 Structural Concrete Class "A" x“ 3 405(163 | fen a7sampaye | &% | 116198 | 1071903 | 1062149 | 12341,95895 ) N 28 Days 5 Lean Concrete 3 2. 40718) | (16.50 Mpa) cum] 2360 | 5,106.79 | 5,060.32 119,423.55 ag Forms and age 4141) Is. | 1.00. | 340515840 | 337417146 | 3,374,171.46 obs Falseworks ES Sub-Total PART E 100,834,793.24 ts 6 GRAND TOTAL 104,881,499.25 NOW THIS AGREEMENT WITNESSETH AS FOLLOWS: 1. In this Agreement, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2. The following documents shall be attached, deemed to form, and be read and construed as part of this Agreement, to wit: (@) General Conditions of Contract; (b) Special Conditions of Contract, () Drawings/Plans/Specifications; Department of Public Works and Highways By: Party of the First Part ROSELLEWVA. TOLENTINO Page 2of 4 21C00056: Network Development Program ~ Construction of Missing Links/New Roads, Capas-- Botolan Road (Gaqulan Bdge 1), Province of Zambales (a) Invitation to Bid; (@) Instructions to Bidders; (Bid Data Sheet; (Q) Bid form, including all the documents/statements contained in the Bidders bidding envelopes, as annexes; (h) Eligibility requirements, documents and/or statements; (Performance Security; ()._ Net Financial Contracting Capacity (NFCC); (W)_ Notice of Award of Contract and the Bidder's conforme thereto; (Other contract documents that may be required by existing laws and/or the Owner. 3. In consideration of the payments to be made by the Owner to the Contractor as, hereinafter mentioned, the Contractor hereby covenants with the Owner to execute and complete the Works and remedy any defects therein in conformity with provisions of this Contract in all respects. 4. The Owner hereby covenants to pay the Contractor in consideration of the execution and completion of the Works and the remedying of defects wherein, the Contract Price or such other sum as may become payable under the provisions of this Contract atthe time and in the manner prescribed by this Contract. 5. The Contractor shall pay taxes in full and on time and that failure to do so will entitle the government to suspend payment for any services delivered by the Contractor. 6. The Contractor shall likewise regularly present within the duration of the Contract, attax clearance from the BIR as well as a copy of its income and business tax returns duly stamped and received by the BIR and duly validated with tax payments made thereon. IN WITNESS whereof the parties thereof have caused this Agreement to be executed the day and year first before written, REPUBLIC OF THE PHILIPPINES LEADWAY CONSTRUCTION & DEPARTMENT OF PUBLIC WORKS AND DEVELOPMENT CORPORATION HIGHWAYS (PARTY OF THE FIRST PART) (PARTY OF THE SECOND PART) BY: BY: Lebaa We laces ROSELL FOLENTINO: RODIGAR\M. LAXAMANA, JR. Regibnal Director Str Q. DELA: 4 IZ resident IGNACIO F. EVANGELISTA Chief, Construction Division ‘Attorney V (Witness) (Witness) (OK. AS TO AVAILABILITY OF FUNDS: VIDA ANGELA E. CALMA Page 3 of 4 21€00056: Network Development Program Construction of Missing Lnks/New Roads, apas-Botolan Road (Baquian Bridge 1), Province of Zambales F.EVANGELISTA Attorney V (Witness) z < BG 25 p- us zs o> sa ge aS 5 & z= 3 § 2 2 2 3 5 a a 38 = 2 Const. Division (Witness) hi Regibnal Director REPUBLIC OF THE PHILIPPINES ) SSS SS CITY OF SAN FERNANDO ACKNOWLEDGEMENT BEFORE ME, as the Notary Public for and within the Province/City of San Fernando, Pampanga personally appeared, ROSELLER A. TOLENTINO, Regional Director representing the REPUBLIC OF THE PHILIPPINES (Department of Public Works and Highways), with PRC License No. 0034860, and RODIGAR M. LAXAMANA, JR., President, representing LEADWAY CONSTRUCTION & DEVELOPMENT CORPORATION, with PRC License No. 0108181, known to be the same persons who executed the foregoing CONTRACT and AGREEMENT and they acknowledged to me that the sameis their true act and deed for and in behalf of the parties they represented. This instrument consist of four (4) pages, including this page, on which this acknowledgement is written duly signed by the contracting parties and their witnesses on the left margin of the other pages. INWITNESS WHEREOF, | have hereunto affixed my Signature and Official Seal this dayof _\PP 0 6 9094’ 2021. (Notary Public) Doc.No. __f‘] Page No. Book No. 4 Series of 2021 (BENG. 103569-01/10/2020 Both in Pampanga Roll No. 54501 MCLE Compliance No. Vi-003517 tssued on June 21. 2019 PasigGitv Commission No. 02-30 Page 4 of 4 2100056: Network Development Program ~ Construction of Missing Lnks/New Roads, apas Botolan Road (Gaqulan Bridge 1), Province of Zambales

You might also like