REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Region Il
OFFICE OF THE REGIONAL DIRECTOR
Sindalan, Cty of San Fernando, Pampanga
CONTRACT AGREEMENT
THIS AGREEMENT, made this 5 day of April 2021 between the Department of Public
Works and Highways, with offices address at Sindalan, City of San Fernando, Pampanga,
represented by ROSELLER A. TOLENTINO - Regional Director (hereinafter called the
“Owner’) and LEADWAY CONSTRUCTION & DEVELOPMENT CORPORATION, with office
address at #8004 Purok 8 Mining, Angeles City, Pampanga, represented by
RODIGAR M. LAXAMANA, JR. ~ President (hereinafter called the “Contractor’).
WHEREAS, the Owner is desirous that the Contractor execute 21€00056: Network
Development Program - Construction of Missing Links/New Roads, Capas - Botolan
Road (Baquilan Bridge 1), Province of Zambales and has accepted the bid for One Hundred
Four Million Eight Hundred Eighty One Thousand Four Hundred Ninety Nine Pesos and
25/100 Only (P 104,881,499.25), by the Contractor for the execution and completion of such
Works, within contract duration of Two Hundred Seventy (270) calendar days, and the
remedying of any defects therein. The calculated unit bid prices showm in the attached Bill of
Quantities are tabulated hereunder:
New Unit
ItemNo. | Description | Unit | Quantity | Unit Cost | Cost(Disc= | Amount
0.91%)
PARTA | FACILITIES FOR THE ENGINEERS
Provision of Field
Office for the
Engineers (Rental
Basis)
Alt (8) mo.| 9.00 6,272.00 | 6,214.92 55,934.28
Provision of
Furnitures/
Fixtures,
| A.2.1(11) | Equipment & Is | 1.00 | 89,271.43 | 88,459.06 88,459.06
Appliances for the
Field Office for the
Engineers
Provision of 4x4
Pick-up Type
A1.2(2) | Service Vehiclefor | mo.} 9.00 | 22,579.20 | 2237373 | 201,363.57
the Engineer on
Bare Rental Basis
Operation and
Maintenance of
A1.2(5) | 4x4PickupType | mo.| 9.00 | 12,544.00 | 12,429.85 | 111,868.65
Service Vehicle for
‘the Engineer
‘Sub-Total PART A 457,625.56
Page 1of 4
2100056: Network Development Program ~ Construction of Missing Links/New Roads, Capas ~Botolan Road
(Boqullan Bdge 1), Province of ZambalesNew Unit
ItemNo.| Description | Unit | Quantity | Unit Cost | Cost (Disc= | __ Amount
§ 0.91 %)
2 PARTB | OTHER GENERAL REQUIREMENTS
Z>, Project Billboard
533 85 _| Signboards ea. | 300 | 7,698.88 | 7,628.82 22,886.46
u gS ‘Occupational
ge 8.7(2) | SafetyandHealth | 1s. | 1.00 | 222,743.81 | 220,716.84] 220,716.84
Program
‘Mobilization/
89 | Serotitastion | ' | 100 | 923,983.97 | 915,575.72 | 915,575.72
‘Sub-Total PARTB 1,159,179.02
5 Tt PARTC | EARTHWORKS
ee
$ i Structural
ge 3 103(1)8 | Excavation, Soft | cum.| 2,221.06 | 59650 | 591.07 | 1,312,801.93
sé 22 Rock
a2 £8. Embankment
gg 55 104(2)a | From Borrow cum.| 1,650.00 | 683.25 | 67703 | 1,117,09950
4 SB (Common Soil) L
Zs 3° ‘Sub-Total PART C 2,429,901.43
: : 3 PARTF | BRIDGE CONSTRUCTION
gs a Concrete Piles Cast
400(17)f | in Drilled Holes m. | 666.00 | 73,753.02 | 73,081.87 | 48,672,525.42
(1.30m dia)
‘aoo(aaynt | Permanent Casing,
tam tommihice | ™ | 333.00 | 32,202.30 | 31,909.26 | 10,625,783.58
8 Pile integrity
8
g < 40002616 | Testing, cow Strain | &% | 1800 | 54,063.11 | s3s7i.14 | 96428052
- = High Str
5 S= 400(27) | DynamicTesting | ea. | 3.00 | 326,889.97 | 323,915.27 | 971,745.81
= weg (PDA)
a ge Reinforcing Steel,
i—eH 40aia | Cteay kg. | 7623753 | 74.11 73.44 | 5,598,884.20
s zg Reinforcing Steel,
A z 40aityb | ervey kg. | 24211675 | 75.72 75.03 | 18,166,019.75
2 5 Structural
Concrete Class "A"
x“
3 405(163 | fen a7sampaye | &% | 116198 | 1071903 | 1062149 | 12341,95895
) N 28 Days
5 Lean Concrete
3 2. 40718) | (16.50 Mpa) cum] 2360 | 5,106.79 | 5,060.32 119,423.55
ag Forms and
age 4141) Is. | 1.00. | 340515840 | 337417146 | 3,374,171.46
obs Falseworks
ES Sub-Total PART E 100,834,793.24
ts 6 GRAND TOTAL 104,881,499.25
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
1. In this Agreement, words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be attached, deemed to form, and be read and
construed as part of this Agreement, to wit:
(@) General Conditions of Contract;
(b) Special Conditions of Contract,
() Drawings/Plans/Specifications;
Department of Public Works and Highways
By: Party of the First Part
ROSELLEWVA. TOLENTINO
Page 2of 4
21C00056: Network Development Program ~ Construction of Missing Links/New Roads, Capas-- Botolan Road
(Gaqulan Bdge 1), Province of Zambales(a) Invitation to Bid;
(@) Instructions to Bidders;
(Bid Data Sheet;
(Q) Bid form, including all the documents/statements contained in the Bidders
bidding envelopes, as annexes;
(h) Eligibility requirements, documents and/or statements;
(Performance Security;
()._ Net Financial Contracting Capacity (NFCC);
(W)_ Notice of Award of Contract and the Bidder's conforme thereto;
(Other contract documents that may be required by existing laws and/or the
Owner.
3. In consideration of the payments to be made by the Owner to the Contractor as,
hereinafter mentioned, the Contractor hereby covenants with the Owner to
execute and complete the Works and remedy any defects therein in conformity
with provisions of this Contract in all respects.
4. The Owner hereby covenants to pay the Contractor in consideration of the
execution and completion of the Works and the remedying of defects wherein, the
Contract Price or such other sum as may become payable under the provisions of
this Contract atthe time and in the manner prescribed by this Contract.
5. The Contractor shall pay taxes in full and on time and that failure to do so will
entitle the government to suspend payment for any services delivered by the
Contractor.
6. The Contractor shall likewise regularly present within the duration of the Contract,
attax clearance from the BIR as well as a copy of its income and business tax returns
duly stamped and received by the BIR and duly validated with tax payments made
thereon.
IN WITNESS whereof the parties thereof have caused this Agreement to be executed
the day and year first before written,
REPUBLIC OF THE PHILIPPINES LEADWAY CONSTRUCTION &
DEPARTMENT OF PUBLIC WORKS AND DEVELOPMENT CORPORATION
HIGHWAYS
(PARTY OF THE FIRST PART) (PARTY OF THE SECOND PART)
BY: BY:
Lebaa We laces
ROSELL FOLENTINO: RODIGAR\M. LAXAMANA, JR.
Regibnal Director
Str Q. DELA: 4 IZ
resident
IGNACIO F. EVANGELISTA
Chief, Construction Division ‘Attorney V
(Witness) (Witness)
(OK. AS TO AVAILABILITY OF FUNDS:
VIDA ANGELA E. CALMA
Page 3 of 4
21€00056: Network Development Program Construction of Missing Lnks/New Roads, apas-Botolan Road
(Baquian Bridge 1), Province of ZambalesF.EVANGELISTA
Attorney V
(Witness)
z <
BG
25
p-
us
zs
o> sa
ge
aS
5
&
z=
3
§
2
2
2
3
5
a
a
38
=
2
Const. Division
(Witness)
hi
Regibnal Director
REPUBLIC OF THE PHILIPPINES )
SSS SS
CITY OF SAN FERNANDO
ACKNOWLEDGEMENT
BEFORE ME, as the Notary Public for and within the Province/City of San Fernando,
Pampanga personally appeared, ROSELLER A. TOLENTINO, Regional Director
representing the REPUBLIC OF THE PHILIPPINES (Department of Public Works and
Highways), with PRC License No. 0034860, and RODIGAR M. LAXAMANA, JR.,
President, representing LEADWAY CONSTRUCTION & DEVELOPMENT
CORPORATION, with PRC License No. 0108181, known to be the same persons who
executed the foregoing CONTRACT and AGREEMENT and they acknowledged to me
that the sameis their true act and deed for and in behalf of the parties they represented.
This instrument consist of four (4) pages, including this page, on which this
acknowledgement is written duly signed by the contracting parties and their witnesses
on the left margin of the other pages.
INWITNESS WHEREOF, | have hereunto affixed my Signature and Official Seal this
dayof _\PP 0 6 9094’ 2021.
(Notary Public)
Doc.No. __f‘]
Page No.
Book No. 4
Series of 2021 (BENG. 103569-01/10/2020
Both in Pampanga
Roll No. 54501
MCLE Compliance No. Vi-003517
tssued on June 21. 2019 PasigGitv
Commission No. 02-30
Page 4 of 4
2100056: Network Development Program ~ Construction of Missing Lnks/New Roads, apas Botolan Road
(Gaqulan Bridge 1), Province of Zambales