344,9 m
240 m 300 m
60 m
90 m 150 m Aiming Point Marking
30 m
75 m
30 m 30 m 30 m 30 m 1,8 m
1,5 m 22,5 m 22,5 m 22,5 m
90 m
30
45 m
7,5 m 0,9 m
75 m
Touch Down Zona Marking
Threshold Marking
Holding Position
3449 m
1751 m
Runway Strip
Detail 2
Runway Shoulder
Runway Lighting
arking
Runway
22,5 m 22,5 m 22,5 m
150 m
Rapid exit taxiway
Rapid exit taxiway
LayOut Bandara
263,700 m
Skala 1 : 5000 SUMBER
LISTRIK DEPOT Detail 3
PEMADAM GUDANG
KEBAKARAN TERMINAL BUILDING KARGO
PARKIR
FAKULTAS TEKNIK
UNIVERSITAS TADULAKO
PALU-SULAWESI TENGAH
NE
MATA KULIAH
1492 m
E
EN
N
E
E
NN
E
ES
W
NN
PERENCANAAN
NW
SE
LAPANGAN TERBANG
E
W
SS
WN
W
W
SS
WS
S
W
Clearway DOSEN PEMBIMBING
SW
H. Anas Tahir, ST., MT
NIP : 19701218 199803 1 004
Dr. Ir. Arief Setiawan, ST., MT., ATM.,IPM
1,8 m 30 m 30 m 30 m 30 m
22,5 m 22,5 m 22,5 m 22,5 m 22,5 m 1,5 m NIP : 19750621 2003 12 1 003
45 m
60 m 45 m
12
0,9 m 7,5 m
DIPERIKSA / ASISTEN
240 m H. Anas Tahir, ST., MT
NIP : 19701218 199803 1 004
KOORDINATOR TUGAS
Ir. Mashuri , ST., MT.
100 m NIP : 19701102 199903 1 004
Taxiway Lighting
NAMA TUGAS
PERENCANAAN
LAPANGAN TERBANG
SKALA JUMLH GAMBAR
1 : 5000 7
NAMA GAMBAR NO. GAMBAR
Layout Bandara 1
DIGAMBAR OLEH
WIJIYANTO
F 111 17 040
FAKULTAS TEKNIK
UNIVERSITAS TADULAKO
PALU-SULAWESI TENGAH
MATA KULIAH
PERENCANAAN
LAPANGAN TERBANG
DOSEN PEMBIMBING
Detail 1
H. Anas Tahir, ST., MT
NIP : 19701218 199803 1 004
Dr. Ir. Arief Setiawan, ST., MT., ATM.,IPM
344,9 m NIP : 19750621 2003 12 1 003
Runway Strip
240 m
DIPERIKSA / ASISTEN
60 m
RESA 90 m 150 m Aiming Point Marking Runway Shoulder H. Anas Tahir, ST., MT
30 m Runway NIP : 19701218 199803 1 004
75 m
30 m 30 m 30 m 30 m 1,8 m
1,5 m 22,5 m 22,5 m 22,5 m 22,5 m 22,5 m KOORDINATOR TUGAS
90 m
30
45 m
7,5 m 0,9 m
75 m
Ir. Mashuri , ST., MT.
Touch Down Zona Marking 150 m
Clearway 1 NIP : 19701102 199903 1 004
45 m NAMA TUGAS
Threshold Marking
R = 45 m
PERENCANAAN
LAPANGAN TERBANG
1 : 5000 7
DIGAMBAR OLEH
WIJIYANTO
F 111 17 040
FAKULTAS TEKNIK
UNIVERSITAS TADULAKO
PALU-SULAWESI TENGAH
MATA KULIAH
PERENCANAAN
LAPANGAN TERBANG
Detail 2
DOSEN PEMBIMBING
DIPERIKSA / ASISTEN
90° m 30° m
R = 25,5 m
240 m
2 H. Anas Tahir, ST., MT
NIP : 19701218 199803 1 004
100 m
NAMA TUGAS
PERENCANAAN
LAPANGAN TERBANG
Detail
Marking 2 3
DIGAMBAR OLEH
WIJIYANTO
F 111 17 040
FAKULTAS TEKNIK
UNIVERSITAS TADULAKO
PALU-SULAWESI TENGAH
MATA KULIAH
PERENCANAAN
LAPANGAN TERBANG
DOSEN PEMBIMBING
50 m
DIPERIKSA / ASISTEN
SUMBER 263,7 m
LISTRIK DEPOT KOORDINATOR TUGAS
64,9 m 81,85 m
PEMADAM GUDANG
KEBAKARAN KARGO Ir. Mashuri , ST., MT.
NIP : 19701102 199903 1 004
50 m
NAMA TUGAS
Detai Apron
SKALA JUMLH GAMBAR
Skala 1 :2500
1 : 3000 7
Detail
Apron 4
DIGAMBAR OLEH
WIJIYANTO
F 111 17 040
FAKULTAS TEKNIK
UNIVERSITAS TADULAKO
PALU-SULAWESI TENGAH
MATA KULIAH
Slab
Beton
PERENCANAAN
LAPANGAN TERBANG
DOSEN PEMBIMBING
Dowel
Ø40-460
A H. Anas Tahir, ST., MT
NIP : 19701218 199803 1 004
Dr. Ir. Arief Setiawan, ST., MT., ATM.,IPM
NIP : 19750621 2003 12 1 003
Dowel
Ø40-460 Ø12-500 DIPERIKSA / ASISTEN
7,6 m
NAMA TUGAS
Potongan B - B
A Skala 1 : 50
PERENCANAAN
7,6 m LAPANGAN TERBANG
Ø12 - 500 mm JOINT SPACING
DOWEL Ø40 - 460 mm
51 cm 460 mm
Potongan A - A
NAMA GAMBAR NO. GAMBAR
Skala 1 : 50
Desain Pelat
Lantai Apron 5
DIGAMBAR OLEH
WIJIYANTO
F 111 17 040
FAKULTAS TEKNIK
UNIVERSITAS TADULAKO
PALU-SULAWESI TENGAH
2,5 % 1,5 % 1,5 % 2,5 %
MATA KULIAH
PERENCANAAN
7,5 m 45 m 7,5 m
LAPANGAN TERBANG
DOSEN PEMBIMBING
Skala 1 : 20
KOORDINATOR TUGAS
NAMA TUGAS
7,5 m 23 m 7,5 m
PERENCANAAN
LAPANGAN TERBANG
7,62 cm
76,2 m
Skala 1 : 200 1 : 200
1 : 20
7
30,48 cm
NAMA GAMBAR NO. GAMBAR
WIJIYANTO
F 111 17 040
FAKULTAS TEKNIK
UNIVERSITAS TADULAKO
PALU-SULAWESI TENGAH
MATA KULIAH
PERENCANAAN
LAPANGAN TERBANG
DOSEN PEMBIMBING
3m
H. Anas Tahir, ST., MT
0,3 m 3m 1m
NIP : 19701218 199803 1 004
Dr. Ir. Arief Setiawan, ST., MT., ATM.,IPM
NIP : 19750621 2003 12 1 003
1,5 m 1,5 m 1,5 m 1,5 m 1,5 m
2,4 m
3,6 m DIPERIKSA / ASISTEN
1m
0,5 m
1,1 m H. Anas Tahir, ST., MT
NIP : 19701218 199803 1 004
1,1 m
9m 6m
KOORDINATOR TUGAS
1,4 m
2,6 m
NAMA TUGAS
1,5 m 1,5 m
PERENCANAAN
0,8 m 1,4 m LAPANGAN TERBANG
1m 3m
1 : 10 7
Marking Arah Runway
Skala 1 : 10 NAMA GAMBAR NO. GAMBAR
Detail Marking
7
Arah Runway
DIGAMBAR OLEH
WIJIYANTO
F 111 17 040