BILL OF QUANTITY Bill ( BOQ )

PEKERJAAN RAMP DIFABEL

NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan Alat, Pembersihan dan Mob-demob Pekerja lot 1.00 Rp 1,000,000.00 Rp 1,000,000.00
TOTAL PEKERJAAN PERSIAPAN Rp 1,000,000.00

II. PEKERJAAN RAMP DIFABEL

1 Pek, Bongkaran Eksisting Keramik & Coran lot 1.00 Rp 1,200,000.00 Rp 1,200,000.00
2 Pek, Pengecoran K 300 m3 2.00 Rp 2,700,000.00 Rp 5,400,000.00
3 Pek, Pemasangan Hand Rail Stainless m1 8.00 Rp 1,200,000.00 Rp 9,600,000.00
4 Pek, Pasang Granit Unpolish m2 5.00 Rp 420,000.00 Rp 2,100,000.00
5 Pek, Pasang Rubber Anti Slip m2 5.00 Rp 410,000.00 Rp 2,050,000.00

Rp 20,350,000.00 TOTA
Rp 21,350,000.00
Rp 2,135,000.00
Rp 23,485,000.00
GRAND TOTAL PEKE