Professional Documents
Culture Documents
Fixed Steel Column Base Design
Fixed Steel Column Base Design
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.
BASE PLATE ID :- (B-1) Refrences
ECP
DESIGN CASE :- (D.L+L.L) Case a Steel grade St.37
Fy = 2.40 t/cm2
1)- APPLIED FORCES :- Fu = 3.60 t/cm2
M = 64.00 m.t
N = 30.00 t
Q = 6.00 t
4)-VERTICAL WELD :-
d = 800.00 mm
C = 95.00 t (Comp.)
T = 65.00 t (Tens.)
Sw = 6.00 mm
Fweld = 0.6771 t/cm2 < 0.720 t/cm2 SAFE Eqn.5.2
Qweld = 0.0313 t/cm2 < 0.720 t/cm2 SAFE Eqn.5.2
Feq = 0.6792 t/cm2 < 0.792 t/cm2 SAFE Eqn.5.3
P.84
5)-HORIZONTAL WELD :-
Y1 = 625.00 mm
L1 = 1250.00 mm
L2 = 100.00 mm
Sw = 8.00 mm
Aw = 491.20 cm2
Ix = 668302 cm4
Fweld = 0.66 t/cm2 < 0.720 t/cm2 SAFE Eqn.5.2
Qweld = 0.01 t/cm2 < 0.720 t/cm2 SAFE Eqn.5.2
Feq = 0.66 t/cm2 < 0.792 t/cm2 SAFE Eqn.5.3
P.84
6)-ANCHOR BOLTS :-
CONCRETE PEDASTIAL :-
ECG Project Name
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.
Fcu = 300.00 kg/cm2
tpedastial = 130.00 cm
bpedastial = 70.00 cm
Fc = 34.51 kg/cm2 < 90.00 kg/cm2 SAFE
e = 5.00 cm
C = 77.498 t
T = 40.652 t
Φ = 25 mm
AΦ = 4.91 cm2
n = 6 No of anchor bolts (one side)
Φ = 25 mm
Fb = 7.13 Kg/cm 2
f = 1.00
M1 = 1.35 cm.t
M2 = 3.02 cm.t
Mdes = 3.02 cm.t
tp = 36.1 mm
t = 38 mm
ECG Project Name
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.