You are on page 1of 5
© 41F/2F- Optix RTN 605 V100R003 Two typae of IDUs are adsed to implemert the hybrid tranzmigsion of TDM Et and Ethamet data services. 4. IDU 605 1F: 16¥Et + 2xF E+ 1xGE, and IF 1-0 2. IDU 605 2F: 1 6xE1 ~ SxF E+ 1x06, and IF t=1 IDU605 1F IDU 605 2F OptiX RTN 620 ‘SDH/PDH microwave = With regard to the TDM services, the backplane is connected to the cross- connect board, thus implementing the 141 HSB protection through the dual- fed and selective-receiving of the cross-connection. = With regard to the Ethernet services in the Hybrid microwave services, the Bssiaadeescird - cross-connection and the pov] sera) ee i dual-fed are nat performed por LP FO oe on the IFH2 and EMSS. fsteana Therefore, the 141 protection ELD ese ore for the Hybrid microwave service is implemented by the IFH2 and the EMSE. Figure 1-6 One ODU confgured for one antenna Direct aount Separate mount Figure 1-7 Two QDUs configured for one antenna Direct acunt Separate nount ‘Orderwiredata External alarm asynchronous data NM gata, 2.4 Signal Processing Flow ‘This section descrinas the signal processing flow ot the Optix BTN 600 that uses the IDU 605 through the example of E1 signas Figuro2-8Signal procossing flow ives Table 25 Transmit direction Logical _ | Signal Processing Description Board 1 | PEt | + Accesses Et signals. (DU) © HBS decoding «+ Tranamis the 2.048 Mbit/s signals to the IFO board. Figure 3-1 System architecture of the IDU 610 or DU 620 Ibu 610/620 Ordenvire date P Tay cwwmezre seca] | Sar | [ear] [oe | [er al Revisar la ODU + Conexién entre la ODU, el acoplador hibrido y la antenal + Verificarla resistencia al agua de las interfaces. + Estatus del cable de tierra. » Apatiencia de la ODU. ee ODU — Diagrama de Bloques Copyrers 2 att Hane TecrrndogesCa. Lad alles meee.

You might also like