Residual Risk

Initial Risk Score


Score Controls in
List steps in task / activity Identified Hazards Associated Risks Control measures
place (Y / N)
L C Score L C Score

1. Transporting PA system Discuss safety with students in


Crashing whilst enroute to
and other equipment to 1.1 Traffic 1 5 5 class the day before the first
the venue
and back from ‘The session
Tanks
1.4

3.2

3.3

3.4

2. 4.1

4.2

4.3

4.4

Task / Activity Risk Assessment – OHS Unit – Dec 2014


Residual Risk
Initial Risk Score
Score Controls in
List steps in task / activity Identified Hazards Associated Risks Control measures
place (Y / N)
L C Score L C Score

3. 5.1

5.2

5.3

5.4

4. 6.1

6.2

6.3

6.4

5. 7.1

7.2

7.3

7.4

6. 8.1

8.2

8.3

8.4