You are on page 1of 1
Brcssinnx |(@ FAKULTAS TEKNIK DAFTAR HARGA PENGUIIAN LAPANGAN DAN LABORATORIUM {LABORATORIUM Lil MATERIAL FAKULTAS TEKNIK- UNIVERSITAS NAROTAMA SURABAYA, 2017 ILTANAH Tem Pekerjoan ‘Setuan | Harga Satuan Keterangan (RP) [A PENYELIOAN & TES LAPANGAN 1 [Tes SondirRirgan 2,5 Ton m7 500,000 [in 3 Tae 2 [Bor Danglal SM. tit 500,000 in Titi a [resp tit 750,000 [in.2 Tk 4 [Pengamblan Undistrbed Sample Sample 20,000 [Bor-Danghal 5 [Dring Cor Tanah meter 350,000 [Bor-Mesin 6 [Dring Cor Batuan meter 200,000 |Bor-Mesin 7 [Pengambllan Undisturbed Sample ‘Sample 150,000 [Bor-Mesin 8 [Tesser tes 150,000 9 [Tes CaR Lapangan ts 200,000 in. 5TH 10[Tes Sand Cone tes 200,000 in. 5 Tithe 11 focer (Dynamic Cone Penetration Test) te 200,000 in. 5 Tek [TES LABORATORIO 7 [Volumter/Water Content /Gravimetr Sample 325,000, 2 [Cradasi butiran (ayakan & hydrometer) Sample 150,000, 3 [Aterberg mit Sample 225,000, 4 [Trasial UU/UCT/Dinect shear), Sample 150,000 5 [Ronsolidas Sample 150,000, 6 [Permeability (Rembesan) ‘Semple 150,00 7 | Standart Proctor (Pemadatan Lab) ‘sample 200,000, 8 [Mocified Proctor Sample 300,000 29 [can Laboratorium Sample 720,000 [CHARA PAKET (MINIMUM ORDER) 1 [OBR Lapangan Min Titik a "7000,000 [Tidak Termasuk Transportasl & Akomodasl 2 [Sand Cone Min. Tit a 7,000,000 [Tidak Termasuk Transportasi& Akomodas! «4 [DPT (Oynamic Cone Penetration Test is 7,000,000 [Tidak Termasuk Transports! & Akomodast 5 [2 Tk Sonar, 1 Titik Bor Danglal 5 m, Tes Lab, Reporting is 4,000,000 [Untuk Area Surabaya 6 [Tes Bahan Urugan : Proctor Gradas, Aterberg, CBR-Lab fa. Jenis Material: Lempung, Situ, Umestone & 700/000 Sample dri ke laboratoium [b.base Course A, Base course 8 & 7,400,000 [Sample kim ke laboratorium Gaon 1 Harga belum termasuk PPn dan PPh 2. Harga belum termasuk baya transportasi 3 Untuk lokasi pengetesan di luar pula Jawa diitung tersendi Surabaya, 1 Mei 2017

You might also like