TRAVESING / CROSSECTION MEASUREMENT

PROJECT : KARIAN MULTIPURPOSE DAM PROJECT............... PAGE : 1


LOCATION : Spillway.......................... INSTRUMENT : TS TOPCON
SURVEYOR : Asep setiana...................................... SERIAL NO. : ES 105
WORK : Backfill backside PR&PL
HI HT H TARGET ANGULAR DISTANCE COORDINATE ELEVATION
STA BS FS HORIZONTAL VERTICAL SLOPE HOR X Y m
8+15 L 641841.567 9290992.997 49.924
8+15 R 641786.993 9290956.423 49.734

10+15 L 641816.448 9290891.479 34.151


10+15 R 641770.857 9290919.402 34.046

SKETSA :

Checked by, Lebak,..................2021


Consultant Supervisor Measured by,
Contractor

(.............................................) (.............................................)