ACTIVITY DURATION ESTIMATE

[Form 3.15]

Activity ID: 1.1.2 Date Prepared: 17-06-2020

Activity Name: Architectural Design WBS ID:1.1

Responsibility: Zia Architectural Firm Activity Duration:2 days

Description of Work:
Architectural Design is made by a famous firm in order to give building adorable look

Res ID Resource Description Qty Unit of Rate Amount


[BOQ Item/Labor/Machine/Material] Measure

1.1.2.1 Architect designer No No 50000 50000

1.1.2.2 Neo Classic Design No No 1500000 1500000

TOTAL 1550000
Remarks:
Design is given preference