STEEL COLUMN
1 STEEL COLUMN K1 POT12 8 1 18.2 WF. 600. 200. 11. 17 106.00 15,433.60 291.20
2 STEEL COLUMN K2 A POT6 2 1 17.78 WF. 400. 200. 8. 13 66.00 2,346.96 56.90
3 STEEL COLUMN K2 B POT12 1 1 18.305 WF. 400. 200. 8. 13 66.00 1,208.13 29.29
4 STEEL COLUMN K2 C POT12 2 1 18.831 WF. 400. 200. 8. 13 66.00 2,485.69 60.26
5 STEEL COLUMN K2 D POT12 2 1 18.892 WF. 400. 200. 8. 13 66.00 2,493.74 60.45
6 STEEL COLUMN K2 E POT12 1 1 19.356 WF. 400. 200. 8. 13 66.00 1,277.50 30.97
7 STEEL COLUMN K2 F POT12 1 1 19.364 WF. 400. 200. 8. 13 66.00 1,278.02 30.98
8 STEEL COLUMN K2 G POT12 2 1 19.882 WF. 400. 200. 8. 13 66.00 2,624.42 63.62
9 STEEL COLUMN K2 H POT12 1 1 20.386 WF. 400. 200. 8. 13 66.00 1,345.48 32.62
10 STEEL COLUMN K2 I POT12 4 1 20.933 WF. 400. 200. 8. 13 66.00 5,526.31 133.97
11 STEEL COLUMN K2 J POT12 1 1 20.431 WF. 400. 200. 8. 13 66.00 1,348.45 32.69
12 STEEL COLUMN K2 K POT12 2 1 20.4 WF. 400. 200. 8. 13 66.00 2,692.80 65.28
13 STEEL COLUMN K2 L POT12 1 1 20.35 WF. 400. 200. 8. 13 66.00 1,343.10 32.56
14 STEEL COLUMN K2 M POT12 1 1 20.9 WF. 400. 200. 8. 13 66.00 1,379.40 33.44
15 STEEL COLUMN K2 N POT12 1 1 19.3 WF. 400. 200. 8. 13 66.00 1,273.80 30.88
16 STEEL COLUMN K2 O POT12 2 1 19.9 WF. 400. 200. 8. 13 66.00 2,626.80 63.68
17 STEEL COLUMN K2 P POT12 1 1 19.405 WF. 400. 200. 8. 13 66.00 1,280.73 31.05
18 STEEL COLUMN K2 Q POT12 1 1 18.174 WF. 400. 200. 8. 13 66.00 1,199.48 29.08
19 STEEL COLUMN K3 POT12 4 2 22.15 WF. 400. 200. 8. 13 66.00 11,695.20 283.52
20 STEEL COLUMN K4 POT12 2 1 18.2 WF. 300. 150. 6,5. 9 36.67 1,334.79 43.68
21 STEEL COLUMN KA POT6 4 1 4.625 H. 150. 150. 7. 10 31.50 582.75 16.65
STEEL BEAM
1 STEEL BEAM B1 A POT12 21 1 7.476 WF. 150. 75. 5. 7 14.00 2,197.94 94.20
2 2 STEEL BEAM B1 B POT6 9 1 1.525 WF. 150. 75. 5. 7 14.00 192.15 8.24
3 3 STEEL BEAM B1 C POT6 12 1 2.15 WF. 150. 75. 5. 7 14.00 361.20 0.00
4 STEEL BEAM B1 D POT6 9 1.76 WF. 150. 75. 5. 7 14.00 0.00 0.00
5 STEEL BEAM B2 A POT12 50 1 7 WF. 200. 100. 5,5. 8 21.33 7,465.50 280.00
6 STEEL BEAM B2 B POT6 6 1 6 WF. 200. 100. 5,5. 9 22.33 803.88 28.80
7 STEEL BEAM B3 POT12 39 1 7.476 WF. 250. 125. 6. 9 29.58 8,624.46 291.56
8 STEEL BEAM B4 A POT12 3 1 8.667 H. 150. 150. 7. 10 31.50 819.03 23.40
9 STEEL BEAM B4 B POT12 4 1 7.476 H. 150. 150. 7. 10 31.50 941.98 26.91
10 STEEL BEAM B5 POT12 8 1 40 WF. 450. 200. 9. 14 76.00 24,320.00 512.00
11 BALK SOKONG B7 POT12 8 1 10.215 H. 250. 250. 9. 14 72.42 5,918.16 122.58
BRACING KOLOM

D:\program\steel concrete.xls - steel str - December 31, 2003 - 1 of 10


1 BRACING KOLOM BR1 1 1 2 7.195 L. 80. 80. 8 9.55 137.42 4.60
2 BRACING KOLOM BR1 2 1 2 6.572 L. 80. 80. 8 9.55 125.53 4.21
3 BRACING KOLOM BR1 3 1 2 7.665 L. 80. 80. 8 9.55 146.40 4.91
4 BRACING KOLOM BR1 4 1 2 7.385 L. 80. 80. 8 9.55 141.05 4.73
5 BRACING KOLOM BR1 5 4 2 7.248 L. 80. 80. 8 9.55 553.75 18.55
6 BRACING KOLOM BR1 6 4 2 6.36 L. 80. 80. 8 9.55 485.90 16.28
7 BRACING KOLOM BR1 7 1 2 8 L. 80. 80. 8 9.55 152.80 5.12
8 BRACING KOLOM BR1 8 1 2 8.3 L. 80. 80. 8 9.55 158.53 5.31
9 BRACING KOLOM BR1 9 1 2 8.585 L. 80. 80. 8 9.55 163.97 5.49
10 BRACING KOLOM BR1 10 1 2 9.287 L. 80. 80. 8 9.55 177.38 5.94
11 BRACING KOLOM BR1 11 2 2 7.248 L. 80. 80. 8 9.55 276.87 9.28
12 BRACING KOLOM BR1 12 2 2.0 8.66 L. 80. 80. 8 9.55 330.81 11.08
13 BRACING KOLOM BR1 13 2 2.0 6.36 L. 80. 80. 8 9.55 242.95 8.14
14 BRACING KOLOM BR1 14 2 2.0 7.95 L. 80. 80. 8 9.55 303.69 10.18
15 BRACING KOLOM BR1 15 1 2.0 7.195 L. 80. 80. 8 9.55 137.42 4.60
16 BRACING KOLOM BR1 16 1 2.0 6.57 L. 80. 80. 8 9.55 125.49 4.20
17 BRACING KOLOM BR1 17 1 2.0 7.664 L. 80. 80. 8 9.55 146.38 4.90
18 BRACING KOLOM BR1 18 1 2.0 7.385 L. 80. 80. 8 9.55 141.05 4.73
19 BRACING KOLOM BR1 19 4 2.0 7.248 L. 80. 80. 8 9.55 553.75 18.55
20 BRACING KOLOM BR1 20 4 2.0 6.359 L. 80. 80. 8 9.55 485.83 16.28
21 BRACING KOLOM BR1 21 1 2.0 8.97 L. 80. 80. 8 9.55 171.33 5.74
22 BRACING KOLOM BR1 22 1 2.0 9.4 L. 80. 80. 8 9.55 179.54 6.02
23 BRACING KOLOM BR1 23 1 2.0 8.2 L. 80. 80. 8 9.55 156.62 5.25
24 BRACING KOLOM BR1 24 1 2.0 8.8 L. 80. 80. 8 9.55 168.08 5.63
25 BRACING KOLOM BR1 25 4 2.0 8.68 L. 80. 80. 8 9.55 663.15 22.22
26 BRACING KOLOM BR1 26 4 2.0 8 L. 80. 80. 8 9.55 611.20 20.48
27 BRACING KOLOM BR1 27 18 2.0 8.024 L. 80. 80. 8 9.55 2,758.65 92.44
28 BRACING KOLOM BR1 28 12 2.0 8.022 L. 80. 80. 8 10.55 2,031.17 61.61
29 BRACING KOLOM BR1 29 6 2.0 5.8 L. 80. 80. 8 11.55 803.88 22.27
30 BRACING KOLOM BR1 30 1 2.0 9.283 L. 80. 80. 8 12.55 233.00 5.94
31 BRACING KOLOM BR1 31 1 2.0 8.72 L. 80. 80. 8 13.55 236.31 5.58
32 BRACING KOLOM BR1 ; 4 2.0 8.621 L. 80. 80. 8 14.55 1,003.48 22.07
BASE PLATE KOLOM
1 BASE PLATE K1 BP1 8 1.0 0.64 0.29 Plate 18 mm 145.80 216.48 2.97
2 BASE PLATE K2 BP2 26 1.0 0.45 0.25 Plate 15 mm 121.50 355.39 5.85
3 BASE PLATE K3 BP3 4 1.0 0.43 0.43 Plate 15 mm 121.50 89.86 1.48
4 BASE PLATE K4 BP4 2.00 1.0 0.34 0.2 Plate 12 mm 97.22 12.56 0.26
3 BASE PLATE KA BP6 4 2.0 0.17 0.17 Plate 12 mm 97.22 22.48 0.46
4 END PLATE K1 EP1 8 1.0 0.64 0.29 Plate 12 mm 97.22 144.35 2.97
5 END PLATE K2 EP2 26 1.0 0.45 0.25 Plate 15 mm 97.22 284.37 5.85
6 END PLATE K3 EP3 4 1.0 0.43 0.43 Plate 15 mm 97.22 71.90 1.48
7 END PLATE K4 EP4 2.00 1.0 0.34 0.2 Plate 12 mm 97.22 12.56 0.26
8 END PLATE K5 EP5 3 1.0 0.23 0.23 Plate 15 mm 97.22 15.43 0.32

D:\program\steel concrete.xls - steel str - December 31, 2003 - 2 of 10


9 END PLATE K6 EP6 3 1.0 0.28 0.28 Plate 15 mm 97.22 22.87 0.47
10 END PLATE K1 EP1 A 8 2.0 0.64 0.29 Plate 8 mm 64.93 192.82 5.94
11 END PLATE K3 EP3 A 4 4.0 0.64 0.29 Plate 8 mm 64.93 192.82 5.94
12 COUPLE PLATE K1 CP1 A 8 2.0 1 0.2 Plate 20 mm 160.00 512.00 6.40
COUPLE PLATE K1 CP1 B 8 2.0 0.8 0.5 Plate 12 mm 97.22 622.21 12.80
STIFEENER K1 STF1 16 2.0 0.57 0.2 Plate 10 mm 82.00 299.14 7.30
13 COUPLE PLATE K2 CP2 A 26 2.0 1 0.2 Plate 16 mm 129.51 1,346.90 20.80
COUPLE PLATE K2 CP2 B 26 2.0 0.8 0.175 Plate 12 mm 97.22 707.76 14.56
STIFEENER K2 STF2 26 2.0 0.35 0.1 Plate 10 mm 82.00 149.24 3.64
14 COUPLE PLATE K3 CP3 4 4.0 1 0.2 Plate 18 mm 153.82 492.22 6.40
15 COUPLE PLATE K4 CP4 A 2 2.0 0.8 0.15 Plate 15 mm 121.50 58.32 0.96
COUPLE PLATE K4 CP4 B 2 2.0 0.6 0.22 Plate 10 mm 82.00 43.30 1.06
STIFEENER K4 STF4 2 2.0 0.273 0.075 Plate 8 mm 64.93 5.32 0.16
` BASE PLATE BALK
1 BASE PLATE B5 BP'5 8 2.0 1.12 0.2 Plate 15 mm 97.22 348.44 7.17
STIFFENER B5 STF'5 A 8 8.0 0.422 0.2 Plate 10 mm 82.00 442.93 10.80
STIFFENER B5 STF'5 B 8 2.0 0.65 0.125 Plate 10 mm 82.00 106.60 2.60
SPLICE B5 SPL5 8 4.0 0.6 0.57 Plate 12 mm 97.22 1,063.98 21.89
2 BASE PLATE B3 BP'3 39 2.0 0.5 0.17 Plate 10 mm 82.00 543.66 13.26
STIFFENER B3 STF'3 A 39 1.0 0.422 0.2 Plate 10 mm 82.00 269.91 6.58
STIFFENER B3 STF'3 B 39 1.0 0.65 0.125 Plate 10 mm 82.00 259.84 6.34
3 BASE PLATE B7 BP'7 A 8 1.0 0.68 0.2 Plate 12 mm 97.22 105.78 2.18
BASE PLATE B7 BP'7 B 8 1.0 0.53 0.2 Plate 12 mm 97.22 82.44 1.70
STIFFENER B7 STF'7 A 8 1.0 0.22 0.2 Plate 12 mm 97.22 34.22 0.70
4 BASE PLATE B2 BP'2 A 1 1.0 0.68 0.2 Plate 12 mm 97.22 13.22 0.27
BASE PLATE B2 BP'2 B 8 1.0 0.53 0.2 Plate 12 mm 97.22 82.44 1.70
STIFFENER B2 STF'2 A 8 1.0 0.22 0.2 Plate 12 mm 97.22 34.22 0.70
PLAT BUHUL
5 BUHUL K1 PB1 180 2.0 0.33 0.2 Plate 16 mm 129.51 3,077.16 47.52
6 BUHUL BRACING PB2 45 2.0 0.26 0.27 Plate 8 mm 64.93 410.23 12.64
GORDING
1 GORDING GUDANG PUR1 74 1.0 18 C. 150. 65. 20. 2,3 5.50 7,326.00 679.32
GIRD CLADDING
1 GIRD ELV 0 - 18 GR1 AS1 14 1.0 72.5 C. 150. 65. 20. 2,3 5.50 5,582.50 517.65
2 GIRD ELV 8 - 22 GR1 AS1 2 1.0 52.5 C. 150. 65. 20. 2,3 5.50 577.50 53.55
3 GIRD ELV 0-18 GR1 AS1' 15 1.0 7.3 C. 150. 65. 20. 2,3 5.50 602.25 55.85
4 GIRD ELV 0 - 18 GR1 AS4 14 1.0 72.5 C. 150. 65. 20. 2,3 5.50 5,582.50 517.65
5 GIRD ELV 8 - 22 GR1 AS4 2 1.0 52.5 C. 150. 65. 20. 2,3 5.50 577.50 53.55
6 GIRD ELV 0-18 GR1 ASP 15 1.0 14.2 C. 150. 65. 20. 2,3 5.50 1,171.50 108.63
7 GIRD ELV 0-18 GR1 ASA 15 1.0 18.2 C. 150. 65. 20. 2,3 5.50 1,501.50 139.23
8 GIRD ELV 0-18 GR1 AS0 15 1.0 4.2 C. 150. 65. 20. 2,3 5.50 346.50 32.13
LOADING DOCK

D:\program\steel concrete.xls - steel str - December 31, 2003 - 3 of 10


STEEL COLUMN
1 STEEL COLUMN K5 POT6 3 1 10 H. 200. 200. 8. 12 49.92 1,497.60
2 STEEL COLUMN K6 POT6 3 1 5.4 H. 250. 250. 9. 14 72.42 1,173.20
BASE PLATE KOLOM
1 BASE PLATE K5 BP5 3 1.0 0.23 0.23 Plate 15 mm 121.50 19.28 0.32
2 BASE PLATE K6 BP6 3 1.0 0.28 0.28 Plate 15 mm 121.50 28.58 0.47
3 END PLATE K5 EP5 3 1.0 0.23 0.23 Plate 15 mm 97.22 15.43 0.32
4 END PLATE K6 EP6 3 1.0 0.28 0.28 Plate 15 mm 97.22 22.87 0.47
5 STIFEENER K5 STF5 A 3 2.0 0.32 0.075 Plate 10 mm 82.00 11.81 0.29
6 STIFEENER K5 STF5 B 3 4.0 0.32 0.075 Plate 8 mm 64.93 18.70 0.58
7 STIFEENER K6 STF6 3 2.0 0.43 0.1 Plate 10 mm 82.00 21.16 0.52
STEEL BEAM
1 BALK B2 B2 A 7 2.0 4.825 WF. 200. 100. 5,5. 8 21.33 1,440.84 54.04
2 BALK B2 B2 B 8 1.0 1.416 WF. 200. 100. 5,5. 8 21.33 241.63 9.06
3 BALK B2 B2 C 8 1.0 5.7 WF. 200. 100. 5,5. 8 21.33 972.65 0.00
4 BALK B7 B2 A 8 1.0 5.7 WF. 350. 175. 7. 11 49.58 2,260.85 63.84
5 BALK B7 B2 B 3 1.0 13.37 WF. 350. 175. 7. 11 49.58 1,988.65 56.15
6 BALK B8 (HC) B8 4 1.0 17.725 WF. 300. 150. 6,5. 9 36.67 2,599.90 85.08
` BASE PLATE BALK
1 BASE PLATE B2 BP'2 A 8 1.0 0.792 0.2 Plate 12 mm 97.22 123.20 2.53
2 BASE PLATE B2 BP'2 B 8 4.0 0.23 0.23 Plate 12 mm 97.22 164.57 3.39
3 BASE PLATE B8 BP'8 A 4 2.0 0.8 0.2 Plate 12 mm 97.22 124.44 2.56
4 SPLICE B8 SPL8 A 4 2.0 0.45 0.45 Plate 10 mm 82.00 132.84 3.24
5 SPLICE B8 SPL8 B 4 2.0 0.8 0.15 Plate 10 mm 82.00 78.72 1.92
6 BASE PLATE B7 BP'7 A 2 1.0 0.7 0.2 Plate 12 mm 97.22 27.22 0.56
7 BASE PLATE B7 BP'7 B 8 2.0 0.7 0.2 Plate 12 mm 97.22 217.77 4.48
8 STIFFENER B7 STF'7 A 8 2.0 0.22 0.2 Plate 12 mm 97.22 68.44 1.41
9 SPLICE B7 SPL8 A 4 2 0.4 0.2 Plate 12 mm 97.22 62.22 1.28
10 SPLICE B7 SPL8 B 2 2 0.8 0.175 Plate 12 mm 97.22 54.44 1.12

GORDING FACIA
1 GORDING FACIA GRFC A 22 2.0 1 C. 100. 50. 20. 2,3 4.07 179.08 16.72
2 GORDING FACIA GRFC B 2 1.0 35 C. 100. 50. 20. 2,3 4.07 284.90 26.60
3 GORDING FACIA GRFC C 17 1.0 1 C. 100. 50. 20. 2,3 4.07 69.19 6.46
4 GORDING FACIA GRFC D 2 1.0 30 C. 100. 50. 20. 2,3 4.07 244.20 22.80
GORDING
1 GORDING GUDANG PUR1 18 1.0 35.6 C. 150. 65. 20. 2,3 5.50 3,524.40 326.81

182,106.76 6,377.73
Gaset 15% 27,316.01 956.66

D:\program\steel concrete.xls - steel str - December 31, 2003 - 4 of 10


209,422.78 7,334.39

REKAPITULASI
VOLUME
NO ITEM WEIGHT
TOTAL (KG) BTG LBR
Kg/m
1 WF. 600. 200. 11. 17 106.00 15,433.60 12.00
2 WF. 400. 200. 8. 13 66.00 45,426.02 57.00
3 WF. 300. 150. 6,5. 9 36.67 3,934.69 9.00
4 H. 150. 150. 7. 10 31.50 2,343.76 6.00
5 WF. 350. 175. 7. 11 49.58 4,249.50 7.00
6 WF. 200. 100. 5,5. 8 21.33 10,120.62 40.00
7 WF. 200. 100. 5,5. 9 21.33 4,249.50 17.00
8 WF. 250. 125. 6. 9 29.58 8,624.46 24.00
9 WF. 450. 200. 9. 14 76.00 24,320.00 27.00
10 L. 80. 80. 8 9.55 13,865.99 121.00
11 Plate 16 mm 129.51 4,424.06 12
12 Plate 15 mm 121.50 1,332.73 4
13 Plate 18 mm 145.80 708.71 2
14 Plate 10 mm 82.00 2,359.14 10
15 Plate 12 mm 97.22 3,780.54 14
16 Plate 8 mm 64.93 819.88 4
17 C. 100. 50. 20. 2,3 4.07 777.37 16.00
18 C. 150. 65. 20. 2,3 5.50 26,792.15 406.00

D:\program\steel concrete.xls - steel str - December 31, 2003 - 5 of 10


2 POT12
1.6 POT6
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.6 POT12
1.2 POT12
0.9 POT6

0.6
0.6

0.8
0.8
1
0.9
0.9
1.6
1.5

D:\program\steel concrete.xls - steel str - December 31, 2003 - 6 of 10


0.32 2
0.32 2
0.32 2
0.32 2
0.32 8
0.32 8
0.32 2
0.32 2
0.32 2
0.32 2
0.32 4
0.32 4
0.32 4
0.32 4
0.32 2
0.32 2
0.32 2
0.32 2
0.32 8
0.32 8
0.32 2
0.32 2
0.32 2
0.32 2
0.32 8
0.32 8
0.32 36
0.32 24
0.32 12
0.32 2
0.32 2
0.32 8
180
121.527777777778
141.3

D:\program\steel concrete.xls - steel str - December 31, 2003 - 7 of 10


0.51

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

D:\program\steel concrete.xls - steel str - December 31, 2003 - 8 of 10


0.8
0.8

1.4
1.4
1.2

0.38
0.38
0.38
0.38

0.51

D:\program\steel concrete.xls - steel str - December 31, 2003 - 9 of 10


D:\program\steel concrete.xls - steel str - December 31, 2003 - 10 of 10

You might also like