Professional Documents
Culture Documents
LO955
0
LO955 Batch Management ...........................................................................................................................................0-1
Copyright ..................................................................................................................................................................0-2
Materials Management..........................................................................................................................................0-4
Prerequisites ..........................................................................................................................................................0-5
Target Group .........................................................................................................................................................0-6
Course Overview.......................................................................................................................................................1-1
Course Goals .........................................................................................................................................................1-2
Course Objectives .................................................................................................................................................1-3
Course Content (1) ................................................................................................................................................1-4
Course Content (2) ................................................................................................................................................1-5
Course Overview: Diagram (1) .............................................................................................................................1-6
Course Overview: Overview Diagram (2) ............................................................................................................1-7
Main Business Scenario ........................................................................................................................................1-8
Introduction...............................................................................................................................................................2-1
Introduction: Unit Objectives................................................................................................................................2-2
Introduction: Course Overview Diagram (1) ........................................................................................................2-3
Introduction: Overview Diagram (2).....................................................................................................................2-4
Business Background ............................................................................................................................................2-5
Integration of Batch Management.........................................................................................................................2-6
Batch Management in Logistics............................................................................................................................2-7
Introduction: Unit Summary .................................................................................................................................2-8
Master Data...............................................................................................................................................................3-1
Master Data: Unit Objectives................................................................................................................................3-2
Master Data: Course Overview Diagram ..............................................................................................................3-3
Master Data: Business Scenario............................................................................................................................3-4
Business Definition of...........................................................................................................................................3-5
The Term...............................................................................................................................................................3-6
Master Data Structure ...........................................................................................................................................3-7
Master Data Structure ...........................................................................................................................................3-8
Material Master Record and Batch Master Record ...............................................................................................3-9
Assignment of Batch Number .............................................................................................................................3-10
Batch Creation.....................................................................................................................................................3-11
Master Data: Unit Summary ...............................................................................................................................3-12
Exercise Data Sheet ............................................................................................................................................3-13
Master Data Exercises.........................................................................................................................................3-17
Master Data Solutions .........................................................................................................................................3-19
Batch Levels..............................................................................................................................................................4-1
Batch Levels: Unit Objectives ..............................................................................................................................4-2
Batch Levels: Course Overview Diagram.............................................................................................................4-3
Batch Levels: Business Scenario..........................................................................................................................4-4
Batch Unique per Material Number and Plant ......................................................................................................4-5
Batch Unique per Material Number ......................................................................................................................4-6
Batch Unique per Client and Material Number.....................................................................................................4-7
Customizing ..........................................................................................................................................................4-8
Procedure Following a Change in the Batch Level ...............................................................................................4-9
Batch Levels: Summary ......................................................................................................................................4-10
Batch Specification ...................................................................................................................................................5-1
Batch Specification: Unit Objectives ....................................................................................................................5-2
Batch Specification: Course Overview Diagram ..................................................................................................5-3
Batch Specification: Business Scenario ................................................................................................................5-4
Integration .............................................................................................................................................................5-5
Batch Classification ..............................................................................................................................................5-6
Characteristic Inheritance......................................................................................................................................5-7
Batch Classification and Characteristic Inheritance..............................................................................................5-8
Maintaining Master Data I ....................................................................................................................................5-9
Maintaining Master Data II.................................................................................................................................5-10
Customizing: Tips and Tricks .............................................................................................................................5-11
Batch Specification: Unit Summary....................................................................................................................5-12
Batch Specification Exercises .............................................................................................................................5-13
Batch Specification Solutions .............................................................................................................................5-17
Batch Status Management.........................................................................................................................................6-1
Batch Status Management: Objectives..................................................................................................................6-2
Batch Status Mgmt: Course Overview Diagram ...................................................................................................6-3
Batch Status Management: Business Scenario.....................................................................................................6-4
Business Background ............................................................................................................................................6-5
Integration .............................................................................................................................................................6-6
How Batch Status Management Works ................................................................................................................6-7
Example ................................................................................................................................................................6-8
Tips & Tricks 1 .....................................................................................................................................................6-9
Tips & Tricks 2 ...................................................................................................................................................6-10
Batch Status Management: Summary .................................................................................................................6-11
Batch Status Management Exercises...................................................................................................................6-12
Batch Status Management Solutions..................................................................................................................6-14
Availability Check for Batches .................................................................................................................................7-1
Availability Check: Unit Objectives .....................................................................................................................7-2
Availability Check: Overview Diagram................................................................................................................7-3
Availability Check: Business Scenario .................................................................................................................7-4
Batch Definition and Availability Check ..............................................................................................................7-5
Availability Check and Status Management .........................................................................................................7-6
Availability Check: Summary...............................................................................................................................7-7
Batch Determination .................................................................................................................................................8-1
Batch Determination: Unit Objectives ..................................................................................................................8-2
Batch Determination: Course Overview Diagram ................................................................................................8-3
Batch Determination: Business Scenario ..............................................................................................................8-4
Batch Determination in the Logistics Process.......................................................................................................8-5
Principal of Batch Determination..........................................................................................................................8-6
Batch Determination for Goods Movements.........................................................................................................8-7
Batch Determination in Production.......................................................................................................................8-8
Batch Determination in Sales................................................................................................................................8-9
Batch Determination in Sales..............................................................................................................................8-10
Batch Determination in Warehouse Management...............................................................................................8-11
Batch Determination in Warehouse Management...............................................................................................8-12
Batch Determination: Application Master Data ..................................................................................................8-13
How Customizing and the Applications Are Linked ..........................................................................................8-14
Settings in Customizing ......................................................................................................................................8-15
Condition Technique in Batch Determination.....................................................................................................8-16
Batch Determination: Unit Summary..................................................................................................................8-17
Batch Determination Exercises ...........................................................................................................................8-18
Batch Determination Solutions ...........................................................................................................................8-31
Price Determination ..................................................................................................................................................9-1
Price Determination: Objectives ...........................................................................................................................9-2
Price Determination: Course Overview Diagram..................................................................................................9-3
Price Determination: Business Scenario ...............................................................................................................9-4
Functionality .........................................................................................................................................................9-5
Condition Technique in Pricing for Batches .........................................................................................................9-6
Display in Billing Document ................................................................................................................................9-7
Partial Stocks and Their Combinations .................................................................................................................9-8
Structure of Valuation for a Single Batch .............................................................................................................9-9
Price Determination: Summary...........................................................................................................................9-10
Shelf Life Expiration Date ......................................................................................................................................10-1
Shelf Life Expiration Date: Unit Objectives .......................................................................................................10-2
Shelf Life Expiration Date: Overview Diagram..................................................................................................10-3
Shelf Life Expiration Date: Business Scenario ...................................................................................................10-4
Business Background ..........................................................................................................................................10-5
Integration ...........................................................................................................................................................10-6
Shelf Life Expiration Date Check in Goods Receipt...........................................................................................10-7
Central Fields in the Purchase Order...................................................................................................................10-8
Calculation of the Shelf Life Expiration Date.....................................................................................................10-9
SLED Check in Batch Determination ...............................................................................................................10-10
Shelf Life Expiration Date: Summary...............................................................................................................10-11
Shelf Life Expiration Date Exercises ................................................................................................................10-12
Shelf Life Expiration Date Solutions ...............................................................................................................10-15
Batch Where-used List............................................................................................................................................11-1
Batch Where-used List: Objectives.....................................................................................................................11-2
Batch Where-used List: Overview Diagram ......................................................................................................11-3
Business Scenario ...............................................................................................................................................11-4
Business Background ..........................................................................................................................................11-5
Batch Tracking over Several Manufacturing Levels...........................................................................................11-6
Batch Where-used List for Trading Goods .........................................................................................................11-7
Batch Where-used List: Summary ......................................................................................................................11-8
Batch Specification and Quality Management........................................................................................................12-1
Batch Specification: Unit Objectives .................................................................................................................12-2
Batch Specification: Overview Diagram............................................................................................................12-3
Batch Specification: Business Scenario .............................................................................................................12-4
Quality Management (QM) Inspections in Logistics ..........................................................................................12-5
Simplified Batch Maintenance with QM.............................................................................................................12-6
Creating a Material Specification........................................................................................................................12-7
Setting up QM Insp. Data in the Mat. Master Record.........................................................................................12-8
Transfer of Inspection Results.............................................................................................................................12-9
Example: Quality Inspection upon GR from Production ..................................................................................12-10
Batch Specification: Summary.........................................................................................................................12-11
Batch Specification and Quality Management Exercises..................................................................................12-12
Batch Specification and Quality Management Solutions ..................................................................................12-16
Appendix: Batch Creation in Process Manufacturing .............................................................................................13-1
Appendix: Batch Creation: Unit Objectives........................................................................................................13-2
Appendix: Batch Creation Overview Diagram ...................................................................................................13-3
Appendix: Batch Creation Business Scenario.....................................................................................................13-4
Process Flow .......................................................................................................................................................13-5
Inspection During Production: Master Data........................................................................................................13-6
Inspection During Production: Master Recipe ....................................................................................................13-7
Inspection During Production: Material Master..................................................................................................13-8
Inspection During Production: Mat. Specification..............................................................................................13-9
Master Recipe and Material Specification ........................................................................................................13-10
Master Recipe and Material Specification ........................................................................................................13-11
Checks in the Production Process .....................................................................................................................13-12
Creation of Partial Lots .....................................................................................................................................13-13
Relationship Between Partial Lots and Batches................................................................................................13-14
Batch Number Assignment ...............................................................................................................................13-15
Appendix: Batch Creation: Summary ...............................................................................................................13-16
Optimized Batch Processing ...................................................................................................................................14-1
Optimized Batch Processing: Unit Objectives ....................................................................................................14-2
Optimized Batch Processing: Overview Diagram...............................................................................................14-3
Optimized Batch Processing: Business Scenario ................................................................................................14-4
Mass-Processing of Batches................................................................................................................................14-5
Batch Information Cockpit: Introduction ............................................................................................................14-6
Batch Information Cockpit: Screen Layout.........................................................................................................14-7
Batch Information Cockpit: Navigation Area .....................................................................................................14-8
Batch Information Cockpit: Selection Area ........................................................................................................14-9
User Settings .....................................................................................................................................................14-10
Optimized Batch Processing: Summary............................................................................................................14-11
Optimized Batch Processing: Exercises ............................................................................................................14-12
Optimized Batch Processing: Solutions ............................................................................................................14-14
Introduction to Batch-specific Units of Measure ....................................................................................................15-1
Batch-Specific Units of Measure: Objectives .....................................................................................................15-2
Batch-specific Material UoMs: Overview Diagram............................................................................................15-3
Batch-specific Material UoMs: Business Scenario .............................................................................................15-4
Batch-Specific Units of Measure: Differences....................................................................................................15-5
Use of Active Ingredients....................................................................................................................................15-6
Physical Quantity and Active Ingredient Quantity..............................................................................................15-7
Calculating the Quantity .....................................................................................................................................15-8
Prices for Active Ingredients...............................................................................................................................15-9
Planned and Actual Active Ingredient Proportions ...........................................................................................15-10
Use of Product Units .........................................................................................................................................15-11
Batch-Specific Calculation of the Product Quantity .........................................................................................15-12
Batch-Specific Units of Measure: Summary.....................................................................................................15-13
Integration of Batch-specific Units of Measure ......................................................................................................16-1
Integration: Unit Objectives................................................................................................................................16-2
Integration: Overview Diagram ..........................................................................................................................16-3
Integration: Business Scenario ............................................................................................................................16-4
Batch Management Requirement as Prerequisite................................................................................................16-5
Batch-specific UoMs as an Attribute of a Batch .................................................................................................16-6
Integration of Batch-specific Units of Measure ..................................................................................................16-7
Batch-specific Units of Measure in Logistics .....................................................................................................16-8
Integration: Summary..........................................................................................................................................16-9
Data Concept in Active Ingredient Management ....................................................................................................17-1
Data Concept: Unit Objectives............................................................................................................................17-2
Data Concept: Overview Diagram ......................................................................................................................17-3
Data Concept: Business Scenario........................................................................................................................17-4
The Central Unit of Measure for Active Ingredients...........................................................................................17-5
Relationship Between Units of Measure .............................................................................................................17-6
Maint. of Units of Measurement in Customizing................................................................................................17-7
Percentage and User-defined Calculation ...........................................................................................................17-8
Linking of Master Data I.....................................................................................................................................17-9
Linking of Master Data II .................................................................................................................................17-10
Active Ingredient Content in the Specification .................................................................................................17-11
Active Ingredient Characteristic: Special Features ...........................................................................................17-12
Classification Maintenance in the Material Master...........................................................................................17-13
Maintaining Units of Measurement in Mat. Master ..........................................................................................17-14
Activating Active Ingredient Mgmt in Customizing.........................................................................................17-15
Data Concept: Summary ...................................................................................................................................17-16
Data Concept in Active Ingredient Management-1 Exercises...........................................................................17-17
Data Concept in Active Ingredient Management-2 Exercises...........................................................................17-19
Data Concept in Active Ingredient Management-3 Exercises...........................................................................17-21
Data Concept in Active Ingredient Management-1 Solutions...........................................................................17-23
Data Concept in Active Ingredient Management-2 Solutions...........................................................................17-26
Data Concept in Active Ingredient Management-3 Solutions...........................................................................17-27
Active Ingredient Prices..........................................................................................................................................18-1
Active Ingredient Prices: Unit Objectives...........................................................................................................18-2
Active Ingredient Prices: Overview Diagram .....................................................................................................18-3
Active Ingredient Prices: Business Scenario.......................................................................................................18-4
Standard Price per Active Ingredient ..................................................................................................................18-5
Valuation of Single Batches Based on Act. Ingredients......................................................................................18-6
Valuation Based on Several Active Ingredients..................................................................................................18-7
Sales Price Based on Active Ingredients.............................................................................................................18-8
Active Ingredient Prices: Unit Summary ............................................................................................................18-9
Active Ingredient Prices Exercises....................................................................................................................18-10
Active Ingredient Prices Solutions....................................................................................................................18-13
Actual and Planned Values of AI Proportions ........................................................................................................19-1
Actual and Planned Values: Unit Objectives ......................................................................................................19-2
Actual and Planned Values: Overview Diagram.................................................................................................19-3
Actual and Planned Values: Business Scenario ..................................................................................................19-4
From Planned Value to Actual Value .................................................................................................................19-5
Planned and Actual Values in the Master Data ...................................................................................................19-6
Inventory Correction Factor................................................................................................................................19-7
Actual and Planned Values: Summary................................................................................................................19-8
Actual and Planned Values of AI Proportions-1 Exercises.................................................................................19-9
Actual and Planned Values of AI Proportions-2 Exercises...............................................................................19-12
Actual and Planned Values of AI Proportions-3 Exercises...............................................................................19-14
Actual and Planned Values of AI Proportions-1 Solutions ...............................................................................19-16
Actual and Planned Values of AI Proportions-2 Solutions ...............................................................................19-22
Actual and Planned Values of AI Proportions-3 Solutions ...............................................................................19-24
Data Concept in Product Quantity Management.....................................................................................................20-1
Product Quantity Management: Unit Objectives ................................................................................................20-2
Product Quantity Management: Overview Diagram...........................................................................................20-3
Product Quantity Management: Business Scenario ............................................................................................20-4
The Central Unit of Measure for Product Quantities ..........................................................................................20-5
Relationship Between Units of Measure .............................................................................................................20-6
Maint. of Units of Measurement in Customizing................................................................................................20-7
User-defined Calculation ....................................................................................................................................20-8
Linking of Master Data .......................................................................................................................................20-9
Material Master Maintenance............................................................................................................................20-10
The Product Quantity in the Specification ........................................................................................................20-11
Classification Maintenance in the Material Master...........................................................................................20-12
Maintaining Units of Measurement in Mat. Master ..........................................................................................20-13
Activating Product Quantity Management........................................................................................................20-14
Product Quantity Management: Summary ........................................................................................................20-15
Data Concept in Product Quantity Management Exercises...............................................................................20-16
Data Concept in Product Quantity Management Solutions...............................................................................20-19
Product Units - Stock Transfer................................................................................................................................21-1
Product Units of Measure: Unit Objectives ........................................................................................................21-2
Product Units of Measure: Overview Diagram...................................................................................................21-3
Product Units of Measure: Business Scenario ....................................................................................................21-4
Quantity Conversion with Product Unit..............................................................................................................21-5
Quantity Conversion in Inventory Management .................................................................................................21-6
Stock Transfer – Cases........................................................................................................................................21-7
Stock Transfer with Product Unit........................................................................................................................21-8
Summary .............................................................................................................................................................21-9
Summary (1) ...........................................................................................................................................................22-1
Summary (2) .......................................................................................................................................................22-2
Recommended Follow-up Activities...................................................................................................................22-3
Appendix.................................................................................................................................................................23-1
Frequently-used Menu Paths...............................................................................................................................23-2
LO955 Batch Management
LO955
Batch Management
© SAP AG 1999
© SAP AG
R/3 System
Release 4.6C
September 2000
50040836
Copyright
© SAP AG 1999
Trademarks:
Some software products marketed by SAP AG and its distributors contain proprietary software
components of other software vendors.
Microsoft®, WINDOWS®, NT®, EXCEL®, Word® and SQL Server® are registered trademarks of
Microsoft Corporation.
IBM®, DB2®, OS/2®, DB2/6000®, Parallel Sysplex®, MVS/ESA®, RS/6000®, AIX®, S/390®,
AS/400®, OS/390®, and OS/400® are registered trademarks of IBM Corporation.
ORACLE® is a registered trademark of ORACLE Corporation, California, USA.
INFORMIX®-OnLine for SAP and Informix® Dynamic ServerTM are registered trademarks of
Informix Software Incorporated.
UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of The Open Group.
HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web
Consortium, Laboratory for Computer Science NE43-358, Massachusetts Institute of Technology, 545
Technology Square, Cambridge, MA 02139.
JAVA® is a registered trademark of Sun Microsystems, Inc. , 901 San Antonio Road, Palo Alto, CA
94303 USA.
JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology
invented and implemented by Netscape.
SAP, SAP Logo, mySAP.com, mySAP.com Marketplace, mySAP.com Workplace, mySAP.com
Business Scenarios, mySAP.com Application Hosting, WebFlow, R/2, R/3, RIVA, ABAP™, SAP
Business Workflow, SAP EarlyWatch, SAP ArchiveLink, BAPI, SAPPHIRE, Management Cockpit,
SEM, are trademarks or registered trademarks of SAP AG in Germany and in several other countries all
over the world. All other products mentioned are trademarks or registered trademarks of their respective
companies.
Design: SAP Communications Media
Materials Management
Level 2 Level 3
LO510 3 days
Inventory Management
LO515 3 days
LO550 5 days
Invoice Verification
Cross-Functional
LO520 3 days Customizing in MM
Purchasing Details and LO521 2 days
Optimization Pricing in Purchasing
LO020 5 days
LO525 2 days
Processes in Consumption-Based
Procurement Planning and
LO955 3 days
Forecasting
Batch Management
LO540 2 days
Procurement of
External Services
LO925 2 days
Cross-Application
Business Processes in
SD and MM
LO640 3 days
Foreign Trade LO235 2 days
KANBAN
LO715 2 days
QM in Procurement
© SAP AG 1999
Prerequisites
© SAP AG 1999
Target Group
Audience:
Members of the project team
Project team
Administrators
Members of user departments that are involved in Batch
Management
Duration:3 days
© SAP AG 1999
Contents:
Course Goals
Course Objectives
Course Content
Course Overview Diagram
Main Business Scenario
© SAP AG 1999
Course Goals
© SAP AG 1999
Master Data
Customizing
© SAP AG 1999
Preface
© SAP AG 1999
Appendix
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Contents:
Business background
Integration of Batch Management within the R/3 System
Batch Management in Logistics
© SAP AG 1999
Introduction: Unit Objectives
© SAP AG 1999
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
SD FI
MM CO
PP AM
LO
QM
R/3 PS
PM WF
HR IS
© SAP AG 1999
Batch management is a new module in the R/3 System in Release 3.0 and is a cross-application
development in Logistics. It is linked to Logistics applications, where it can be used irrespective of the
industry sector or branch of industry.
In the R/3 System, it is therefore structured under the identification code "LO", standing for "Logistics
General".
Its use does not restrict existing functionality in any way.
Batch
management
Classification
Procurement Production SD
A A A
A A
B B
© SAP AG 1999
Batch Management incorporates the entire logistics process, from procurement to sales.
The new functionality works with all existing batch records.
It is closely linked with classification, but can also be used without classification.
You can only search for batches via the batch determination function if the batches are classified.
© SAP AG 1999
Contents:
Batch Definition in the R/3 System
The Term “Batch” in the SAP R/3 System
Master Data Structure
Material Master Record and Batch Master Record
Assignment of Batch Number
Batch Creation
© SAP AG 1999
Master Data: Unit Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
Charges
Batches
© SAP AG 1999
Materials planning
Product: epoxy resin
Mat-no. Mat-no.
308-188 307-160
Quality: 1 / 50 l bar Quality: 2 / 50 l bar
Batch A1 Batch A1
Mat-no. Mat-no.
308-188 307-160
Mat. no.
309-140 Mat. no.
Batch Mat.
1 no. 309-140
309-140 Batch 3
Batch 2
© SAP AG 1999
The definition of the term batch also influences the definition of the term material.
The following structure is recommended:
All criteria making a batch reproducible are criteria of the batch material, and not of the batch itself.
The batch record should contain only data that is unique to precisely this batch.
This specification identifies the batch as a non-reproducible unit.
The advantage of organizing master data in this way is that it enables you to plan the different models of
a product individually. In the SAP R/3 System, materials are planned at material level and not at batch
level.
© SAP AG 1999
In the SAP R/3 System, batch master records always depend on material master records. We post
batches FOR a material.
You must first create a material master record, stipulating in it that the material is to be handled in
batches. This means that you have to enter a batch number every time there is a goods movement.
The indicator for batch requirement is contained in the following views of the material master record:
Sales and distribution, General plant data, Purchasing, Work scheduling, Storage 1, and Warehouse
management. Even if the indicator appears in several views, it is the same indicator. If it is set in one of
the views, it is displayed as being set in all the other views.
If a material changes from a material that is not subject to batch requirement to one that is subject to
batch requirement, you have to post out all the stocks from the previous fiscal year, the current period,
and the previous period. You can then set the indicator for batch requirement and post the stock back
into the system in batches.
The same applies when you cancel the batch requirement. In this case you also have to reorganize the
batch master records. You can then reset the indicator for batch requirement to blank and post the stock
back into the system.
You can create a batch master record directly when maintaining master data. Alternatively, you can
specify the batch number upon the first goods movement for a batch. The system then creates the batch
master record in the background.
Batch numbers can be assigned internally or externally. You can define alternative number ranges.
Internal
Standard: External
© SAP AG 1999
Customer function calls make it easier to customize the SAP R/3 System. This function module is
delivered empty and can be filled by customers with their own programs without having to modify the
source code. There are user exits for internal and external batch number assignment.
Once you have run the following function modules for batch number assignment, the system will assign
batch numbers automatically without any further action on your part.
EXIT_SAPLV01Z_001. You can use this exit to define your own number range object and/or interval.
You can create dependencies for particular variables (for example, for a plant or material). The batch
numbers can be numerical only.
EXIT_SAPLV01Z_002. You can use this exit to change the number the system determines, or you
can use it to determine a number of your own, containing variables or templates. These numbers can
be alphanumeric.
You can use the following function modules to control the manual entry of batch numbers:
EXIT_SAPLV01Z_003. You can use this exit to replace the proposed number range object
BATCH_CLT and/or external interval 02 with a number range object and/or external interval of your
own.You can create dependencies for particular variables (for example, for a plant or material).
EXIT_SAPLV01Z_004. You can use this exit to define your own checking rules without being
restricted to a number range. If , for example, users assign batch numbers according to a particular
template, this exit ensures that the structure for batch number assignment is maintained.
Automatic/ Automatic or
No manual with Manual without No new
manual check against check creation
creation external
number range
New order
Automatic
batch numbers?
Release order
© SAP AG 1999
© SAP AG 1999
Solutions
Objectives
Business Scenario
Warning or Caution
There is a template for all the master data you create in the
exercises below. You can copy it if you wish. You can use
this, but put your own group number at the end of each
master record you create, and use your own data.
Create a new material master record. Copy all of material master record Y-500.
Use the following values:
Material: Y-500-##
Replace ## with your group number, for example 01.
Industry: Pharmaceuticals
Material type: Semi-finished product
Views Values
Views All
Contents:
Batch Unique per Material Number and Plant
Batch Unique per Material Number
Batch Unique per Client and Material Number
Customizing
Procedure Following a Change in the Batch Level
© SAP AG 1999
Batch Levels: Unit Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
If the batch level is set to Plant/Material in your system, the following applies:
The batch number can be reassigned for a material with a different specification in each plant.
However, you can transfer a stock from one plant to another between batches with the same number,
even though the batches do not necessarily have the same specification. In such cases, the batch quantity
transferred assumes the specification of the destination batch.
If you want the batch specification to be unique across all plants, you can only achieve this through
organizational measures. The system does not support this. In this case, you are recommended to switch
to a higher batch level.
Batch A1 Batch A1
© SAP AG 1999
If the batch level is set to Material in your system, the following applies:
A batch has the same specification for all plants at which a material is stored.
The same batch number can be reassigned with a different specification for each material.
Batch A1
A1 Batch A2
© SAP AG 1999
S T AR T
Batch level
Batch unique at
ONE-WAY plant level
Batch level
Batch unique
at material level
Batch level
Batch unique at
client level
© SAP AG 1999
You can select the area of validity of batches in Customizing. You have three batch levels to choose
from. In the standard SAP R/3 System, the default setting is the plant level.
You can switch to a higher level at any time. Switching back to a lower (more specific) level is so far
allowed only from client level to material level. You cannot go back to material/plant level. This is due
to the organization of the batch data which has to be converted whenever you switch batch level. Batch
status management is also affected by this change and has to be subsequently maintained.
Batch A1 B1 B2 B3 C3 C4
© SAP AG 1999
If a batch number has hitherto been unique in a plant but is now only to be unique for a material, this
change will have to be accompanied by a change in the batch numbers.
Hitherto, the same batch number could be assigned for a material number in each plant. The batches did
not have to be identical since they were entirely independent of each other.
In the example, we assume that they have completely different specifications.
Now you have to check whether identical batch numbers exist for the material in both plants. If this is
the case, you will have to prepare a reorganization.
An auxiliary program is automatically offered in Customizing as soon as a change in the batch level has
taken place. It determines all batches that occur in several plants.
It also allows you to carry out a test run and provides you with a log. This analysis must precede actual
batch reorganization. Only after a successful data update can batch management be used at the new
level.
The batch number is unique for each material at the new batch level. A further distinction according to
plant is no longer made.
© SAP AG 1999
Contents:
Integration
Batch Classification
Characteristic Inheritance
Batch Classification and Characteristic Inheritance
Maintenance of Master Data
Customizing: Tips and Tricks
© SAP AG 1999
Batch Specification: Unit Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
Batch determination
Certificates of analysis
Reporting
© SAP AG 1999
Batch management
Batch Class
Specification Characteristics
Classification system
© SAP AG 1999
You can use the classification system in conjunction with batch management.
The classification system and batch management are closely linked.
The specification for a batch master record is based on a batch's classification.
The attributes (that is, the specifications) are stored as characteristic values.
For batch management to function correctly, you must prepare the classification data to include the
corresponding batch specifications.
You have to classify batches in order to use the batch determination function.
The characteristics for materials managed in batches provide information for any kind of evaluations on
particular attributes of batches, whether in connection with quality issues, production issues, or
complaints.
Class type
"batches”
Class 1
Class 2
Class 3
Class 4
Material
Batch
Characteristics:
A, B, C
© SAP AG 1999
All classes used for batch classification are assigned to class type 022/023.
They are required for batch determination.
The material and its batches must be classified via the same class. This ensures that the same
characteristics are used for the material and the batch. Characteristics can pass on their values by
inheritance.
Material
Epoxy resin X Batch
Epoxy resin X1
12000
11000
10000 10000
9000 9000
8000 8000
7000 7000
CHARACTERISTIC 6000
5000
Viscosity
© SAP AG 1999
If a batch inherits characteristics, the characteristic value of the batch can be no higher than the inherited
value range.
In the example shown, batch X1 inherits the requirements for its characteristic value from material X.
The characteristic value of batch X1 cannot have a value interval greater than that of material X.
A more limited interval will also be accepted if it is a partial quantity of the interval of
material X.
A discreet value must be within the predefined interval.
Classification allows lists of numerical or alphanumerical values, not just numeric value intervals.
Class 3
Epoxy resin
Characteristics
Viscosity at 25°
Color
Epoxy resin
Volatile fraction
Material
Epoxy resin X Batch
Epoxy resin X1
© SAP AG 1999
Since the characteristics are the same for the material and its batches, the characteristic values can be
passed on from the material to its batches by inheritance.
Characteristic inheritance acts like a check mechanism. If ranges of values or fixed values are defined
for a characteristic of a class, they can be regarded as the sole values allowed for all objects assigned to
this class. This requires an indicator to be either set or not set in the characteristic master record. It
allows or disallows “additional values” that are not within the limits of the sets of values.
Classification system
Viscosity 5000-12000
Color 0-5
Epoxy resin 23-25
Volatile proportions 0.00-0.50
Create the characteristics.
Class X
Create the class.
Class type “batch” Choose the class type
for batches.
Characteristics
Viscosity at 25°
Class X Color Assign the characteristics
Epoxy resin to the class.
Volatile fraction
© SAP AG 1999
Since the specifications of a material and its batches are stored as classification data, you must prepare
the classification system accordingly.
First, you define the attributes that the material and its batches are to have.
You create them in the classification system as characteristics.
Now, you create the classes that you want to use for the material and its batches. You can create a
selection of different classes for this purpose. You can subsequently assign only one class to the material
and to the batch. You are not therefore preparing multiple classification.
The assignment you make must be to class type 022 or 023 since they have been provided in the
standard SAP R/3 System specially for batches. The class type applicable depends on the batch level
chosen.
If you have specified plant level as the area of validity in Customizing, class type 022 is defined in the
standard SAP R/3 System. The class type is otherwise 023. The system specifies the correct class type
automatically.
In the final step, the characteristics are assigned to batches. The value intervals can be further restricted
in the process.
Materials Management
Class type 'batch'
Class X
Classify your material using
Material the batch class.
Epoxy resin Y
Viscosity 5000-8000
Color 0-5
Epoxy resin 23-25
Volatile proportions 0.00-0.50
Post a batch for this material.
Batch
Epoxy resin Y1
Viscosity 7250 Choose allowed characteristic
Color 1-3 values for your batch.
Epoxy resin 23-25
Volatile fraction 0.30
© SAP AG 1999
You create both the material master record and the batch master record in Materials Management. To
use the entire functionality offered by batch management, you must first classify the material.
You assign the batch class in the “Classification” view of the material master record.
You can restrict all sets of values specified for batch characteristics.
If you create a batch for the material, the material's classification data is copied automatically. The sets
of values specified for the characteristics are proposed as default values.
The system checks whether the characteristic values entered are within the limits allowed if the
characteristics have been defined accordingly. The “Additional values allowed” indicator must not be set
in this case.
Standard characteristics
MCHA
Reference
Data field characteristic
© SAP AG 1999
The standard R/3 System already contains certain characteristics. They are shown here as “standard
characteristics”. They are characteristics that have a key position for batch selection. You should
therefore include them both in the respective batch classes and in the selection classes in batch
determination if the respective business application is used. This improves selection run performance.
You should always use the characteristic 'deletion flag'.
The standard characteristics listed are reference characteristics.
A reference characteristic is linked to a data field via table MCHA/MCH1. The content of this data field
is stored directly in the classification system as a characteristic value. The information is updated
redundantly; that is, it is not only referenced.
If the content of the data field changes, the change is also made in the characteristic value.
In addition, 'free' standard characteristics are offered in the system.
Though a 'free characteristic' is defined independently of existing data fields, it is also supplied with the
standard R/3 System. One example is the characteristic 'remaining shelf life'.
As of 4.0, you can use Customer Function Calls to automatically adopt the master data from a source
batch when you create a batch. You can also copy and change the characteristic valuations of free
characteristics in this way.
© SAP AG 1999
There is a template for all the master data that you will create
in the exercises below. You can copy it if you wish.
However, you must put your own group number at the end of
each master record you create, and use your own data only.
1-2-2 Maintain the sales price. Go to the SD: Sales Org. Data 1 view. In this view,
choose the Conditions pushbutton. Enter a price of $3.50 per kilo. Go to the
Sales Org. Data 1 view. Use plant 1100 as the delivering plant.
Save your material.
On the New items screen, enter material Y-500-## and the quantity you want to post to
stock.
• Enter the batch number of your choice.
• The way the system is currently configured, it displays the classification view when you
choose the Goods receipt without reference to purchase order function.
• Enter discrete values for the characteristics. Remember that you want to search in Batch
Determination after making this specification.
Note: To enter more goods receipt items, return to the entry screen via the icon with the green
arrow.
• Repeat this transaction for some batches.
1-1 Create characteristics and a class for a material that is handled in batches
1-1-1 Create characteristics
Logistics → Central Functions → Batch Management → Environment →
Classification System → Master Data → Characteristics
or
Logistics → Central Functions →
Classification System → Master Data → Characteristics
Choose the icon for creating characteristics with a template or choose
Characteristic → Copy from…
Create new characteristics, using as a template the characteristics specified.
Special requirements:
• Do not allow any interval values for the characteristic M2-## (pH level).
• The Interval values allowed field is not set in the basic data for the characteristic.
Note: You can allow interval values only if the characteristic has several values; that is, if you
can specify several values in the batch’s characteristic value assignment.
• For the characteristic M3-## (purity of color), allow values that are not included in the list of
values for this characteristic.
• In the value range for the characteristic, select the Additional values field.
• Define M5-## (label) as a required entry. Enter the values yes and no as possible characteristic
values for M5-## and select yes as a default value.
• In the basic data for the characteristic, set the Entry required field.
• In the value range for the characteristic, choose Yes in the column for the proposed value.
1-2-2 Maintain the sales price and use the supplying plant 1100.
Initial screen
Field name Values
Movement type 501
Plant 1100
Storage location 0001
At item level:
Field name Values
Material Y-500-##
Quantity Any
Batch number Any, internal or external
Characteristic value assignment Any or within the allowed
values
Repeat this transaction for some batches: Enter other items for your material Y-500-##
in the document and assign more batch numbers and characteristic values before you
save the document.
Contents:
Business Background
Integration
Functionality
Example
Tips & Tricks
© SAP AG 1999
Batch Status Management: Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
© SAP AG 1999
Material 308-
308-188
Batch A1
Status = Restricted
Batch status
management
© SAP AG 1999
The batch status is a central tool for identifying use of the batch as Restricted or Unrestricted. It is valid
at the batch level set in Customizing.
You change the batch status in the batch master record. This results in an automatic transfer posting with
regard to the individual stocks.
Goods movement
Change in
batch master record
Batch status “restricted” Restricted-
use stock
© SAP AG 1999
In Inventory Management, two stock types directly depend on the batch status:
A batch can only be included in 'unrestricted-use stock' if it has the status 'unrestricted'.
A batch can only be included in 'restricted-use stock' if it has the status 'restricted'.
You can make a direct transfer posting between stocks only by changing the indicator in the batch
master record.
All other stocks do not indicate the status of the batch. Postings are made irrespective of the status
indicator in the batch master record.
These stocks are changed when the usual goods movements are made in Inventory Management.
Returns Reserved
Stock transfer (plant) GR blocked stock
Stock transfer (SLoc) Production order
t
On-order stock
en
Stock transp. order
G
oo
em
Consgt. ord.
ds
ov
m
m
ov
ds
Blocked Quality
em
oo
en
stock
G
inspection
t
Change in batch status in batch
master record
© SAP AG 1999
A batch stock cannot be transferred directly from unrestricted-use stock to restricted stock.
If you change the status indicator when maintaining a batch master record, the system makes an internal
transfer posting for the batch stock. A change document is created in respect of the master record change
and a material document is created for the transfer posting.
Direct transfers are possible between all other stocks. If a quantity of batch material is withdrawn from
them, it depends on the batch status whether it can be posted to unrestricted or restricted stock.
Unrestricted-
Unrestricted-use Restricted-
Restricted-use Quality
stock stock inspection
Material 308-188
Batch A1
Status: UNRESTR.
UNRESTR. 100 kg 0 kg 0 kg
80 kg 20kg
Status change
0 kg 100 kg 0 kg
© SAP AG 1999
Selection
class Y Strategy
record
© SAP AG 1999
If you use batch status management, you should also use the batch status as a selection criterion for
batch determination.
As already mentioned in the chapter on batch specification, the standard SAP R/3 System comes with
reference characteristics.
The reference characteristic LOBM_ZUSTD stores the batch status in the classification system.
You should therefore assign it...
... to the respective batch class as a characteristic.
... to the respective strategy record as a selection criterion.
In batch determination, this combination ensures that only batches with the required status are selected.
This prevents long run times.
For example, the system picks out only unrestricted-use batches for a delivery.
This functionality is effective only in conjunction with batch determination, not when you select a batch
manually.
Reference characteristic
The reference characteristic is
“status” automatically assigned the
value of a field.
Unrestr. Restr. You can store additional
information in user-defined
characteristics as required.
You create user-defined
User-defined characteristic characteristics in the
blocking reasons classification system.
Like reference characteristics,
Damaged Spoiled you assign user-defined
characteristics to the batch
class and to the strategy
record.
Incorrect Inspection
certificates required
© SAP AG 1999
In addition to the standard characteristics, you can define as characteristics all attributes that you
consider important and useful for subsequent batch selection.
For example, a useful addition to the standard characteristic “status” would be the characteristic
“blocking reasons” or also “possible use”.
© SAP AG 1999
You want to see the effect of the change in batch status. The stock
overview displays these changes. You can save the batch status as
a characteristic and use it in Batch Determination.
1-1 Change the batch master record and set the status to “restricted”
1-1-1 Check the stocks of Y-500-##.
Copy the transaction (stock overview) to your favorites.
1-1-2 Change the status of one of your batches to “restricted”.
Copy this transaction (Change batch) to your favorites.
Use the values below:
Material: Y-500-##
Batch: (enter the batch number of your choice)
1-2-2 Display the stock overview for material Y-500-## again. Make sure that
Display version 14 is set on the initial screen.
The No lines with zero stock indicator can be copied as selected.
1-1 Change the batch master record and set the status to “restricted”
1-1-1 Check the stocks of Y-500-##.
Logistics → Materials management → Inventory Management →
Environment → Stock overview
or
Logistics → Central Functions → Batch Management → Tools → Stock →
Stock overview
Copy this transaction to your favorites.
Contents:
Effects of the Batch Definition on the Availability Check
Availability Check and Status Management
© SAP AG 1999
Availability Check: Unit Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
Selection criteria:
} Batches of material 308-188
Status: UNRESTRICTED
Available stock > 0
C2 Unrestr. C2
C2 150 kg
Restr.
C3
C4 Unrestr. C4 0 kg C2
C5 Restr.
C6 Restr. C6 50 kg
C6
© SAP AG 1999
© SAP AG 1999
Contents:
Batch Determination in the Logistics Process
The Principle of Batch Determination
Batch Determination in the Case of Goods Movements
Batch Determination in Production
Batch Determination in Sales
Batch Determination in Warehouse Management
Batch Determination: Master Data in the Applications
Link Between Customizing and the Applications
Settings in Customizing
Condition Technique in Batch Determination
© SAP AG 1999
Batch Determination: Unit Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
© SAP AG 1999
A A A
A A
B B
In Logistics, there are different points at which you can assign a batch to a material. You manually enter
the batch number numerically or alphanumerically.
Batch numbers are assigned to materials with batch requirement at goods receipt (external procurement
or in-house production).
If you want to use a particular batch in the Logistics process, you first have to find the batch with the
required specification in stock. Batch determination works automatically.
In Production, batch determination is used to specify suitable components for the finished product right
at the production order stage.
Sales needs to find the batch that fits the customer's requirements most closely. This can be done at two
points: in the sales order and in the delivery.
In the case of goods movements, you need to find the correct batch for goods issues such as for a
consumption posting for an order or for a transfer posting.
In warehouse management, you can initiate batch determination according to the LIFO or FIFO principle
(but also according to other criteria) in the transfer order.
© SAP AG 1999
Batches require you to enter specifications. You classify the batch record using a class of batch class
type 022 or 023, depending on the setting for the batch level in Customizing. You store the batch's
specifications as characteristic values. Both discrete values and defined intervals are possible.
For business transactions where batch determination is to be used, you have to enter strategy records.
The structure of the search strategy depends on the settings made in Customizing. Linked to these
strategy records are the target values for which you search with regard to a particular business
transaction. If you have a number of different requirements, you will have to create the corresponding
number of records. Like the batch record, you also classify the strategy record using a class of class type
022 or 023, storing the required selection criteria as characteristic values for this selection class.
If you now want to find a suitable batch for a business transaction, the system accesses the relevant
strategy record. Its characteristic values are proposed. You can change them for the current business
transaction. The system searches for batches that have the required characteristic values. If required,
auxiliary functions such as a strategy analysis and log printout are offered. They provide user support by
helping you to make suitable changes to your entries and thus to continue the search.
Search strategy
W/house
• Movement type
• Material
• Plant
Characteristics
Bch status: UNR.
Rem.
Rem. shelf life:
10 days
Goods issue
Material X
Batch 456c
W/house
Characteristics
Batch status:
status: UNR.
Exp.
Exp. Date:
Date:
01.02.1997
© SAP AG 1999
Batch determination can be fully used for stock transfers and goods issues.
In the standard setting, batch determination runs online.
Production
Warehouse A
B Warehouse management
Process/
production
order
Batch
determination Search strategy
Material X • Component X
Batch
456b
Material X
Batch 456a BOM for
Characteristics
• Density 5.7 finished
• Expiration date Characteristics product Y-351
Characteristics Density 5.7 •...
01.02.97 • Density 5.7 Rem.shelf life •Component X
• Expiration date 10 days
01.02.97
© SAP AG 1999
In production, suitable batches can be selected in the production order for the individual components.
Batch splitting is possible.
Here, batch determination can work in two different ways:
The selection criteria for the component are contained in the BOM (bill of material) and are fixed values
for batch determination. They are stored as characteristic values of the individual BOM items.
Only if no BOM item is classified does the system check whether a classified strategy record exists. As
with batch determination in the other applications, the selection criteria are then taken from the strategy
record.
If the batches have not yet been determined in the production order,
you have to search for them at the time of the goods issue posting for the production order using batch
determination in Inventory Management.
This allows the use of batch determination even if a component is backflushed.
If the batches have not yet been determined in Sales, they must be found in the transfer order at the
latest, using batch determination in Warehouse Management.
For Release 4.0, you can also define search procedures that allow batch determination for repetitive
manufacturing, kanban, or pull lists.
Warehouse Management
System
Delivery
Batch determination
A
Search strategy
Sales A
W/house
Material X
Batch 456c
Sales order
© SAP AG 1999
Characteristics
A
• Density 5.7
B
• Expiration date
01.02.05
Sales order
Delivery note
If you want to use batch determination in Sales for a business transaction, you must first create a strategy
record. This record contains fields typical of the corresponding business transaction. You classify it
using a selection class in order to store the required specification for the business transaction as a
characteristic value.
In batch determination, the classification of the batch records is compared with that of the strategy
record. If they match, the search was successful. If not, you must change your entries and run the batch
determination procedure again. The characteristic values are default values that you can change or
exclude if required.
Transfer
order
A
Search strategy
Material X B
• Warehouse no. 002
Batch 456c
• Movement type 261
Characteristics
Characteristics
Batch status: Unr.
Unr. W/house
Batch status: Unr.
Unr.
Rem.
Rem . shelf life:
life:
Exp.
Exp. Date:
Date: 01.02.05
10 days
W/house
© SAP AG 1999
In Warehouse Management, batch determination is used for goods issues and stock transfers. The
standard function uses status and shelf life to determine the batch for stock transfer.
For example, you want to post replenishment of a material to be handled in batches to its fixed storage
bin in the picking location. For the transfer posting, the system searches for those batches with the status
“unrestricted-use” and the shortest shelf life.
You want the batches to be sorted by shelf life expiration date.
By sorting according to date field, goods movements can be made on the basis of the LIFO and FIFO
principle.
Here, batch determination runs in the background. The order in which batches are to be listed is
controlled by the sort rule.
You can change it in the selection record, where you can also vary the selection criteria.
IM System
PP System
Create
batch Production
order
Goods receipt Goods issue Mat. X C 123 10
Mat. Y C 456 20
Transfer
order
SD System
Material X
Material X Batch 123 Delivery
Batch 123
From: 902
To: 100 Mat. Bch Qty
X 456 100
Evaluation
WM System
Material X
Batch 123
© SAP AG 1999
When goods are issued in Inventory Management, the system uses particular batches, which are then
staged via picking strategies in Warehouse Management.
Due to the overlapping systems (PP and SD), the system either transfers to the WM System the batches
to be picked via the production order or the delivery (in this case the system searches for the batches
defined), or the WM System determines the batches.
For external or internal inbound deliveries, the system posts a goods receipt for purchase orders or a
production order in Invnetory Management. If you post material that has batch management
requirement, the system creates a new batch. At the same time, classification is carried out for the new
batch.
The batch number is recorded in the quant that is updated as a result of the goods receipt. Alongside the
material number, plant, stock category, and special stock, the batch number forms the material
identification and thereby acts as a criterion for splitting stock in the Warehouse Management System.
The batch is included in all processes in the Warehouse Management System. If the stock that has been
posted is placed in storage, it is posted with reference to the batch. All relevant business transactions and
evaluations take the batch into account.
Business
When? transaction
Selection class
What?
Sort rule
Default quantity rule
Number of batch splits
How?
Strategy records
PP/PP-PI MM WM SD
© SAP AG 1999
Batch determination depends on the strategy records of the respective application. For different
purposes, you have to create different strategy records in the system.
The strategy record that applies to the business transaction is established by the system.
The strategy record determines what is looked for. The selection class specifies which characteristics the
batch is to have.
The strategy record determines how the result of the search run is to be displayed.
The sort rule specifies the sequence in which the batches found are listed.
The default quantity rule determines the quantity in which the batches sought have to be available. You
may want an issue quantity to come only from a single batch or to be made only in whole pallets. A
USER EXIT allows you to match the default quantity to your company's requirements.
The 'number of batch splits' determines the maximum number of batches that may be proposed after a
search run.
PP/PP-PI MM WM SD
Sales organization
11 Warehouse no.
Distribution channel
Order type 22 Warehouse no. Division
Movement type
Plant Movement type 22 Sales document type
Search procedures
© SAP AG 1999
Search procedures are stored in Customizing for each application in which you can run batch
determination. They are the link to the rules used to find the valid strategy record for the respective
business transaction.
You can define the search procedures differently for different business transactions in the application. As
soon as the batch determination procedure is running, the system accesses the corresponding entry of the
application, using it to locate the relevant entries in Customizing.
PP/PP-PI MM Search WM SD
procedures
Strategy types
Access
sequences
Condition tables
© SAP AG 1999
Dependent on the search procedure is a series of Customizing entries for each application in which batch
determination is possible.
The system finds the search procedure (of the application) that is valid on this occasion. It contains the
group of strategy types that are to be read.
As a reference for the strategy records, the strategy types contain control parameters according to which
the batch determination procedure is to run. They are linked to an access sequence.
The access sequence defines the order in which the system searches for existing strategy records. The
access sequence consists of condition tables.
The condition tables describe groups of fields that have been used as a model to create strategy records.
If the table contains many fields, the strategy record is valid for a very special combination of data. If it
contains few fields, the strategy record has a more general validity.
In the access sequence, the condition tables should be grouped from 'Specific' to 'General'.
Strategy
type Strategy 44 Strategy type
Search procedure ...and combine in a
type Strategy procedure.
type
© SAP AG 1999
In Customizing, you must choose fields from the business transactions 'sales order', 'delivery', 'transfer
order', 'goods movement', and 'production/process order' and enter them in condition tables.
They will be used later to form the link between business transaction, strategy record, and batch found.
You then arrange the tables in access sequences.
This is the order in which you want the system to search for existing strategy records.
If the search is not successful using the fields in the first table, the system continues with the next table
in the access sequence. It is advisable to focus the scope of the search at first, in other words, to start
with a table with several entries ('Customer', 'Plant', and 'Material' in our example) and to end with a
more general search (made here only via the material number).
For each strategy type, you choose one access sequence. You may assign the strategy type once only.
However, an access sequence may be used by several strategy types.
The details for batch determination are defined in the strategy type. These include, for example, whether
batch splitting is to be allowed or how the default quantity is calculated. The strategy type entries are
passed on as default values for the strategy records in the application.
Final accessing of the batches for a defined purpose and from defined points of view is stored in the
search procedure. You can link different access sequences together by combining more than one strategy
type.
© SAP AG 1999
The selection class contains the characteristics for which you want to find batches in the
system.
Create a new selection class 023SE_## with the characteristics M1-## (viscosity) and M2-##
(pH level).
In the sort rule, you sort the batches found according to a given characteristic for batch
determination - in ascending or descending order.
Create a new sort rule 040SO_## to sort the batches found for the characteristic M1-##
(viscosity).
You want to find batches of trading goods with a particular pH level and viscosity for a stock
transfer or goods issue.
The system shows all available, existing batches for this material.
To display a comparison of the selection values from the strategy
record with the batch’s actual characteristic values, choose
Classification.
This shows you why a batch was found or why it was not
displayed.
Case 1: You want to find batches of trading goods with a particular pH value and
viscosity in a sales order. The batch numbers are transferred to all follow-on
documents.
(Note: Batch splitting is not possible here.)
Case 2: You want to find batches of trading goods with a particular pH value and
viscosity in a delivery for a sales order. The Batch number field must not be filled in
the sales order.
You want to manufacture a material T-HT2## and have to have the system search for a
suitable batch for the component Y-500-##.
3-3-3 Create process order and carry out batch determination for components
Open a process order for material T-HT2##. Use the data for which you have
just created a strategy record. Enter a total quantity of 100 000 pieces and the
current date as the start date. The system accepts the master recipe with the
modified BOM. Call up the material overview.
Select your components that are subject to batch management and choose
Material → Batch management → Carry out determination
The system displays the selection screen for batch determination with all the
required information, including all the batches that match your selection
criteria.
To see how the system found the strategy record used, choose Strategy analysis.
For more information, you can double-click it.
To overwrite the target values of the selection characteristics, choose Selection
criteria.
Material T-HT2##
Plant 1100
Order type PI01
Total qty 100,000 pcs
Start date Today
The system accepts the master recipe with the modified BOM. Go to the
material overview.
Select your components that are subject to batch management and choose
Material → Batch management → Carry out determination
Choose Strategy analysis and Selection criteria.
Choose
Batch Determination → Without selection criteria.
Choose Change and enter a smaller interval or a single value.
The search result changes.
Choose
Batch Determination → Without selection criteria.
Contents:
Functionality
Condition Technique in Pricing for Batches
Presentation in the Billing Document
Partial Stocks and Their Combinations
Structure of Valuation for a Single Batch
© SAP AG 1999
Price Determination: Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
Condition
Customer Material Batch
type
Material Batch
Access sequence Material
© SAP AG 1999
© SAP AG 1999
The delivery allows batch splitting. You can store different prices for the different batches. This requires
that the invoice document shows batch prices. You can change the display in the system through the
Customizing settings described. You can choose between a total price at item level or all individual
batch prices per item.
© SAP AG 1999
As well as managing batches in Inventory Management, you can valuate partial stocks separately within
the plant level.
You can valuate them according to set valuation categories or you can decide individually for each
batch.
The last procedure is known as valuation for a single batch. You not only have to set the indicator for
batch requirement, but also have to set the “valuation category” field to “X” at plant level on the
accounting screen for the material.
This means that stock valuation can be defined differently for each batch.
Valuation
Valuation area 0001
Plant 0001 Material 1
Valuation cat. X
Material 1 Quantity 10
Plant
MAP 5.20
© SAP AG 1999
For materials subject to the valuation for a single batch procedure, the stocks and stock values are
managed on a cumulative basis at valuation area level. You have to use moving average price control for
materials at valuation level because the moving average price is managed for the whole valuation area.
In addition, the system creates a valuation record for each batch used. This contains specific valuation
data.
© SAP AG 1999
Contents:
Business Background
Integration
Shelf Life Expiration Date Check in Goods Receipt
Central Fields in the Purchase Order
Calculation of the Shelf Life Expiration Date
Shelf Life Expiration Date Check in Batch
Determination
© SAP AG 1999
Shelf Life Expiration Date: Unit Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
Batch
Batch Where-used List
Status Management Batch Batch
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
The time you specify in the material master can be defined in days or in other time periods, controlled
via the period indicator.
The function module exit EXIT_SAPLMHD1_001 in SAP enhancement SAPLMHD1 is used to
calculate and check the shelf life expiration date (SLED).
You can use this exit to modify the data for calculating and checking the SLED.
Purchase order
Header
Vendor
Batch
Expiration
Expiration
date date
© SAP AG 1999
In the order document, you can earmark the target batch to which the posting is to be made upon goods
receipt. This requires you to have already created the target batch number. Likewise, you can earmark
the vendor batch in the purchase order. This is the batch number under which the vendor manages his
goods. In the purchase order, you can specify a minimum value for the shelf life expiration date.
If the target batch already exists in the system, your master record will contain information on the
vendor, his batch number, and the shelf life expiration date specified. The data is entered in the batch
record upon the first goods receipt posting or is entered manually.
A check is made against this data upon other goods receipt postings.
You can also post the goods receipt to new batches. Your master record is then created when the posting
is made.
© SAP AG 1999
If both the total shelf life and the minimum remaining shelf life are maintained, the system executes two
functions in succession. It:
Calculates the shelf life expiration date of the goods received.
Checks the shelf life expiration date that has been calculated.
The system calculates the shelf life expiration date the first time a batch is received:
It is calculated from the date of production plus the total shelf life. You specify the date of production
when making the goods receipt posting. If the total shelf life has not been stored in the material master
record, you must enter the shelf life expiration date at this point.
The difference between the shelf life expiration date and the posting date is the remaining shelf life of
the goods received. It must not be less than the minimum remaining shelf life from the material master
record. If it were less, the system would respond with a warning or an error message, depending on the
setting in Customizing.
Upon the next goods receipt for the same batch, the system compares the shelf life expiration date of the
goods received with the shelf life expiration date that has been calculated.
You can overwrite the existing entry in the batch master record if a warning message has been set in
Customizing for this case.
© SAP AG 1999
In batch determination, you can make a selection using the batch's shelf life expiration date.
This requires you to include standard characteristic LOBM_RLZ for the remaining shelf life in the
selection criteria as well as standard characteristic LOBM_LFDAT for the delivery date.
You enter the required remaining shelf life in the strategy record. Depending on the business transaction,
this can be the required batch specification for production or the requirements of the customer to whom
the delivery is to be made.
For example, the material is to be available in production or to have reached the customer by the
required delivery date.
The system uses these two characteristic values to calculate a minimum required shelf life expiration
date of the batch sought if standard characteristic LOBM_LFDAT has been maintained accordingly.
The SAP R/3 System comes with the standard characteristics. For the shelf life expiration date to be
calculated dynamically, object dependencies must be defined and linked to characteristic
LOBM_LFDAT.
© SAP AG 1999
For materials with a limited shelf life that are handled in batches,
the system should calculate and check the shelf life expiration date
at goods receipt.
You want to verify...
... how the system calculates the shelf life expiration date of the
delivered batch
... whether the remaining shelf life meets the requirements
You can also post the goods receipt via the transaction
MB01.
1-3 Verify shelf life expiration date in the batch master record
Call up the batch master record from your favorites or via the menu.
As you see, the system automatically filled the expiration date field. Try to track how
the system calculated the date.
Hints:
• You can also try out the same procedure without entering
a total shelf life in the system.
• You can add the standard characteristic for the expiration
date to the class C## of your material (search for the
characteristic LOBM* via F4 help).
Then display the classification for several batches of
material Y-500-##. All batches have transferred the
expiration date (current value) in the batch classification
to the relevant characteristic (there may not be a current
value if the expiration date was not checked at goods
receipt).
1-2 Post goods receipt for purchase order with entry of shelf life expiration date/production
date
1-2-1 First of all, create the purchase order. You can then copy it.
Using transaction ME21 or ME21N, copy the reference purchase order
4100000955 (Logistics → Materials Management → Purchasing →
Purchase Order → Create → Vendor/Supplying Plant Known).
You can also create a new purchase order.
1-3 Verify shelf life expiration date in the batch master record
Logistics → Materials Management →
Material Master → Batch → Display.
Contents:
Business Background
Batch Tracking over Several Manufacturing Levels
The Pick-up List
Batch Where-used List for Trading Goods
© SAP AG 1999
Batch Where-used List: Objectives
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
Batch
Batch Where-used List
Status Management Batch Batch
© SAP AG 1999
© SAP AG 1999
© SAP AG 1999
Top
down Customer A Customer B Customer C
F1 F2
S1 S2
R1 R2
F = finished product
Purchase S = semi-fin. product Bottom
order R = raw material
up
Vendor
© SAP AG 1999
Using Inventory Management functionality, the batch where-used list shows a batch's progress through
the company. From the initial posting through to deletion from inventory, each batch has its own
document journal. In addition, the system logs links between batches across all manufacturing levels
through to the sales order and batch splits.
The progress of a batch is recorded only if an inventory posting has been made. Together with the
material document, the system records the numbers of the reference documents such as the production
order and sales order.
The display variants top down and bottom up describe the perspective on the batch's lifecycle.
You can also edit the batch where-used list graphically.
Display options
1. Tree structure: Hierarchical format
2. ALV list: You can enhance this list with additional modifications or fields (for example, if you want to
reorganize columns, calculate totals, or add batch master data).
• For more information, refer to the step Set Up Customer Exit for Batch Where-used List in the
Implementation Guide (IMG) for Batch Management.
• The function module EXIT_SAPLCHVW_001 in the SAP enhancement SAPLCHVW is provided for
the batch where-used list. You use this exit to fill the fields you have added to the ALV list of the
batch where-used list (for example, fields with batch master data such as the shelf life expiration date).
Pick-
Pick-up list Customer A Customer B
Billing
document Sales order Sales order
Sales order
T1
T1
Scheduling
agreement
Delivery note
T1
Plant 02
Purchase
order
T = Trading Goods
Vendor
© SAP AG 1999
The “pick-up list” makes it easier to access the batch where-used list from an SD document: it selects the
flagged documents for the material, reads the batches used therein, and then branches to the batch where-
used list.
In the case of a trading good to be handled in batches, there is no detailed list of possible manufacturing
levels.
The result is a document journal that likewise shows the delivery note and sales order.
© SAP AG 1999
Contents:
© SAP AG 1999
Batch Specification: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Material 308-188
to be handled in batches
A1
A4
B3
A2 C4
© SAP AG 1999
A1
Batch
308-188
QM insp. result
A1
Classification
Viscosity 750 CP Viscosity 750 CP
Covering 85%
power Covering power 85%
© SAP AG 1999
Batch class
X A
Y B
Material specification
© SAP AG 1999
To transfer the inspection results from quality management to the batch specification automatically, you
have to set up the data as follows:
You have to define as a numeric value the general characteristic that you want to transfer to the
inspection results. In addition, the values specified for this characteristic must be within a single interval.
You must always create a master inspection characteristic with reference to the general characteristic in
QM. This ensures that the interval limits of the general characteristic are transferred if a quality
inspection is made using a material specification.
A material specification is created for the material in the QM system, where a master inspection
characteristic is assigned to each general characteristic. This link clearly determines which master
inspection characteristic transfers its result to which general characteristic.
If master inspection characteristics have already been created in the system with reference to general
characteristics of the material, they are included in the material specification.
QM inspection data
Material view QM
Details on
Inspection with specification
Inspection type
Insp. lot
...
© SAP AG 1999
If you want the material specification of a material to be considered in the quality inspection, you must
maintain the indicator Inspect with specification in the QM view of the material master record.
You can set this indicator for each inspection type.
© SAP AG 1999
The inspection results are recorded in the quality inspection and the individual inspection characteristics
then closed. This is followed by the usage decision on the material inspected.
With the usage decision, the values are transferred from the master inspection characteristic to the
general characteristic assigned.
The mean value of the inspection characteristic concerned is written to the general characteristic
automatically if the inspection characteristic has the status closed. The inspection is otherwise regarded
as terminated (discontinued) and the value can be transferred only manually from the inspection
characteristic to the general characteristic.
QM data
Material Characteristic value
308-188 assignment
Insp. type
Batch A1
A 96
Production B 1750
1234
Goods receipt Usage decision
Insp. lot X 96
Batch 1234
Y 1750
A1
© SAP AG 1999
© SAP AG 1999
1-1 Preparations
Change the Quality Management view in the material master of material Y-500-##,
plant 1100 and define an inspection procedure for the material:
Enter inspection type 05 (=inspection for ‘other’ goods receipt) and activate this
inspection type by selecting the Active Field. Choose Enter.
Search for the inspection lots for your material Y-500-##. The system will find one
inspection lot exactly and display it in the frame on the left-hand side.
Double-click line 9999 Check with material specification for work center in the left
frame.
Select the item and click Edit – Characteristic – Choose [or the magnifying glass icon
< ]: xQuer = 921.
Edit - Lock [or choose the lock icon &],
(By-pass any dialog boxes by choosing Accept). Save.
Double-click the line with inspection number 5000…in the left frame.
In the UD code field, use F4 help to enter an acceptance without further action and
save the usage decision.
Select the Inspection Lot Stock tab and post the quantity concerned (500 KG) to the
appropriate stock type: Enter 500 in the line To unrestricted and save again.
1
This is the value measured for the characteristic covering power in quality inspection.
(C) SAP AG LO955 12-14
2-4 Check the batch classification:
Double-click the relevant batch line and call up the classification data: The value 92%
is entered as the characteristic value for covering power.
1-1 Preparations
Pay attention to the instructions for inspection type 05 in the exercise text.
Save the changes in the material master.
2
Only characteristics that have been defined numerically can be linked. In QM, you can enter a result for
numerical characteristics only.
(C) SAP AG LO955 12-17
2-1 Goods receipt for purchase order with creation of inspection lot
At item level:
Field name Values
Material Y-500-##
Quantity 500 KG
Batch number Any, internal or external
Characteristic value assignment Any or within the allowed
values
No characteristic value
assignment for the
characteristic covering power.
Due to the configuration of QM in the material master (inspection type 05), the system
creates an inspection lot when you save an ‘other’ goods receipt.
3
This is the value measured for the characteristic covering power in quality inspection.
(C) SAP AG LO955 12-18
2-3 Enter the usage decision:
Logistics → Central Functions → Batch Management → Environment → Quality
Inspection → Inspection Lot → Usage Decision → Record
or
Logistics → Central Functions → Batch Management → Tools → Stock → Stock
overview
Contents:
Process Flow
Inspection During Production: Master Data
Inspection During Production: Master Recipe
Inspection During Production: Material Master
Inspection During Production: Material Specification
Master Recipe and Material Specification
Checks in the Production Process
Creation of Partial Lots
Relationship Between Partial Lots and Batches
Batch Number Assignment
© SAP AG 1999
Appendix: Batch Creation: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Open
Receipt in warehouse 9
9 11 process order
Header
Confirmations 88 22 Copy
Operations Master recipe with
QM data
Phases
Production process 77 Resource
Process assignment
Quality insp. and instructions
batch assignment Material 33 Availability check
components
..
.
Material withdrawal 6
6 44 Order release
Insp. lot is created
Create control recipe
55 -> PI sheet
© SAP AG 1999
In PP-PI, you can open a process order based on a master recipe in different ways:
manually using a material
without using a material
from one or more planned orders created in material requirements planning.
The data from the master recipe (in which QM data is also maintained) is copied to the order.
The system checks the availability of the material components.
Depending on how your system is configured in Customizing, an inspection lot is created upon release
of the order.
You can also create the inspection lot manually.
A control recipe is created from the order. The control recipe is sent manually and the person
responsible processes the resulting PI sheet on the process control system.
Materials are withdrawn from stock on the basis of the requirements in the PI sheet.
Quality inspections are made in the production process based on defined inspection points in the recipe.
This results in partial lots to which batch numbers are assigned.
Quantities of materials produced are confirmed and posted to stock.
PP-PI MM
Master recipe
1234
Material specification QM
Master insp.
insp. character X General characteristic A
Master insp.
insp. character Y General characteristic B
© SAP AG 1999
The inspection requirements for operations and phases are defined in the master recipe. You plan how
and what you want to inspect. You can define QM data at header level and operation level.
The QM view and the QM inspection data must be maintained in the material master record of the
material to be produced. The inspection type Inspect during production must be activated in the material
master record.
Inspection results are transferred only to those general characteristics that are linked to a master
inspection characteristic via the material specification.
The inspection lot is created either manually or automatically upon release of the process order.
Master recipe
Operation/phase
Header
QM data Inspection grid
- Time-related
- Quantity-related Char.
Inspection - Unrestricted Sampling procedure
points
Indicator for last with inspection
partial lot assignment points and insp.
frequency
© SAP AG 1999
There are a number of different settings you have to make in the master recipe.
QM data is maintained in the master recipe header. Here, you set the inspection points indicator.
At operation or phase level, you can define in the inspection grid whether you want the inspection
intervals to be:
time-related
quantity-related
unrestricted.
The sampling procedure determines the inspection frequency.
In the last operation or phase, you can set the indicator Last partial lot assignment so that the order is
confirmed as a partial lot only after all the operations have been executed.
For the inspection characteristic in the operation or phase, you enter which sampling procedure is to be
used.
QM inspection data
Material view QM
Inspection type details:
Inspect in production
Insp. lot
© SAP AG 1999
In the material master record of the material to be produced, there are a number of different settings that
you have to make in the QM view.
Choose the inspection type Inspection during production in the QM inspection data.
Set the following indicators in the inspection type details:
Inspect with specification determines that values are copied from QM to the batch classification.
Inspect with plan causes a plan (recipe in this case), in which the inspection is defined, to be considered.
Characteristic inspection indicates that an inspection is made for characteristics stored in the recipe.
Material specification
© SAP AG 1999
General characteristics are linked to master inspection characteristics in the QM master record Material
specification.
The general characteristics are stored in the material master record. Here, you define values allowed for
the material. The general characteristics that are passed on to the batches by inheritance are primarily
important for batch determination.
You create master inspection characteristics in QM and assign them to operations and phases in the
master recipe. Quality inspection results are stored in them as characteristic values.
The aim of linking master inspection characteristics and class characteristics is to transfer the result
values from the quality inspection to the batches automatically.
You assign values to the batch class characteristics during in-production quality inspection.
?
20 Operation 10 Master insp. charac. 3 Master insp. charac. 5
Covering
Density ... ...
power
30 Operation 10 Master insp. charac. 4
pH ...
© SAP AG 1999
You can create master inspection characteristics in QM. You can then include them in the recipe and, if
required, change the interval values.
If the inspection is made using the material specification only, you must maintain the operation data in
Customizing for inspection types.
You can use master inspection characteristics in the master recipe and the material specification at the
same time.
The list of inspection characteristics in the recipe can differ from that in the material specification.
Since the recipe can apply to several materials, it is possible for the interval values here to differ from
those in the material specification.
Master recipe
Insp.
Insp. lot Specification
If you use the master recipe and the material specification together, the total characteristics from the
recipe and the specification form the list of master inspection characteristics for the inspection lot.
If the characteristics' value intervals differ, the system copies the requirements from the material
specification to the inspection lot. The data in the master recipe is suppressed.
Mat no.
1 Viscosity 303-188
Batch A1
2 Temperature Covering
3 Density power
4 pH value
5
Covering
power
© SAP AG 1999
In the in-process inspection, the inspection characteristics are used in operations and phases in the master
recipe. In this recipe, you can either create inspection characteristics or refer to existing master
inspection characteristics.
By means of a link, the results of the quality inspection can be automatically transferred from the
inspection characteristics to the corresponding general characteristics of the quantity produced.
Values are transferred only between characteristics linked by a material specification.
Operation
Operation 10
10 Operation 20
Operation Operation 30
Charge
Charge React
20 React Discharge
1 1 3 3 4 4
2 2 5 5
Inspection
10 ' 20 ' 20 '
point
Partial lot 1
Partial lot 2
© SAP AG 1999
This graphic representation shows the connection between inspection points and partial lots.
If you decided on inspection points in the master recipe, you always record the results in in-production
quality control with reference to them. In contrast to inspection without inspection points, you can record
inspection results for the inspection characteristics of the same operation several times in succession.
For each process order, you can create an inspection lot, splitting it into partial lots if required.
If you do not confirm any (partial) quantities in production or if you do not use inspection points, the
inspection results are recorded for the entire inspection lot.
However, if production is in quantities, the system offers you the option of creating a new partial lot or
of adopting the preceding one at each inspection point.
Your decision should depend on whether different inspection results for the quantities produced require
assignment to separate partial lots.
In the case of a material to be handled in batches, different partial lots later allow separate inventory
management since a batch can be created from each partial lot.
Batch 1 Batch 2
© SAP AG 1999
If several partial lots are created in a production run, a separate batch number can be assigned to each
partial lot. Reference is made to this number upon goods receipt from Production.
In addition, when recording inspection results with inspection points, you can group partial lots for a
batch.
The inspection results of the individual partial lots are of key importance here. If values differ between
the partial lots, it may be advisable to manage the stocks later in separate batches.
Process order/
Goods receipt
prod. order Partial lot 1
60000780
A1 Batch
A1
Insp. lot
1234
Goods receipt
Partial lot 2
A2 Batch
A2
© SAP AG 1999
You can specify the batch number in one of two places for the subsequent goods receipt:
at header level of the process order/production order created if the entire order is confirmed as a single
quantity.
for individual partial lots created for the inspection lot and confirmed as (partial) quantities. A batch
number can be assigned for each partial lot or several partial lots can be grouped under the same batch
number.
© SAP AG 1999
Contents:
Mass-processing of batches
Batch Information Cockpit: Introduction
Batch Information Cockpit: Screen Layout
Batch Information Cockpit: Navigation Area
Batch Information Cockpit: Selection Area
User Settings
© SAP AG 1999
Optimized Batch Processing: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Navigation: Processing:
Selection
result
Details
Batch master record:
Change/Display
Worklist
© SAP AG 1999
© SAP AG 1999
Selection
result
or processing:
Batch master record
Stock
Batch usage
© SAP AG 1999
Selection
You can choose the selection setting you wish to work with.
You define user-group-specific selection settings in Customizing for Batch Management.
© SAP AG 1999
List
Reset selection criteria
Selection result: stock
5 stocks found
Material
Y-351
Plant
Batch
Material type
Industry
Batch worklist Division
Standard folder (16 batches) Valuation category
Mat. planner
© SAP AG 1999
Start settings
User group assignment
User group selection SAP 1
Navigation area
Active Sequence Display List
Selection result: batches 1
Selection result: stock 2
Batch worklist 3
Current settings
Material format Deactivate confirmation prompt
Material number when copying to worklist
Material no. (matl description) when deleting from worklist
Material no. (matl description)
Material descr. Database selection
Maximum no. of batches 100
© SAP AG 1999
© SAP AG 1999
Every day you work with batches that have certain properties and
have to monitor and occasionally change stock and batch data. To
make your job easier, you wish to create worklists of batches that
are to be processed. You can then work on these batches later, at
your convenience.
1-2-4 Select all batches of the materials Y-500-XX and 350-100 in plant 1100.
Switch to the list display in the Selection Result: Stock area.
1-2-5 Display the unrestricted stocks in the Selection Result: Stock area.
Sort the selected batches by the status Unrestricted.
Add up the quantities of unrestricted stock. What is the total stock figure?
____________________________________
1-2-6 In the Selection Result area, select batch C4 of material 350-100 and obtain
information on the usage of this batch.
1-2-7 Make an entirely new selection for batches of material Y-500-XX in plant 1100
whose shelf life is due to expire in the next 100 days. Make sure that the
remaining shelf life is shown as the exact number of days in each case. Which
symbol is used to identify batches whose shelf life will expire within the next
100 days in the Selection Result area?
________________________________________
1-2-8 Change the status of critical batches to restricted.
1-2-2 In the Selection Result area in the left-hand part of the navigation area,
select the two materials lauryl alcohol and lemon juice. To do so, hold
down the control key while selecting the two materials with the left-hand
mouse button. Then click on the Selection in folder button and choose
the relevant folder (standard folder or new folder of your own). You can
also select further materials or batches in the selection area and move
them to the public folder.
1-2-3 New call of the Batch Information Cockpit transaction. What are the
contents of the public and private folders?
The private folder should contain the batches of the two materials copied there
in exercise 1-2-2. The public folder contains batches copied into it by both
yourself and other course participants.
1-2-5 Select the Unrestricted-use column and click the Sort in ascending order
icon.
Select the Unrestricted-use column and click the Total icon. What is the
total stock figure? 10,901 kg
1-2-6 In the Selection Result area, select batch C4 of material 350-100. If the
batch master record is displayed in the right-hand frame, navigate to the
batch where-used list via Details – Where used.
1-2-7 Make a completely new selection by clicking the Selection button at the
top of the right-hand frame.
Tab Field name Values
Material Material Y-500-XX
Plant 1100
Shelf life Remaining shelf 100
life
Format of Exact number of
remaining shelf days
life
Execute selection button.
Batches whose shelf life is due to expire within the next 100 days are identified
by a yellow color signal. A red color signal appears next to batches whose shelf
lives have expired. Batches whose shelf life exceeds the 100 days specified as
selection criterion are identified by a green signal.
Contents:
Batch-specific Units of Measure: Differences
Using Active Ingredients
Physical Quantity and Active Ingredient Quantity
Calculating the Quantity
Prices for Active Ingredients
Planned and Actual Active Ingredient Proportions
Using Batch-Specific Units of Measure
Batch-Specific Calculation of the Product Quantity
© SAP AG 1999
Batch-Specific Units of Measure: Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Batch-
Batch-specific units of measure
Product units
Active
ingredients
© SAP AG 1999
The batch-specific material unit is an alternative unit of measure of a material, for which you can define
the conversion ratio into the base unit of measure on a batch-specific basis.
While the conversion ratio for the other alternative units of measure is fixed in the material master, for
batch-specific material units, you have to define:
The planned conversion ratio in the material master
The actual conversion ratio into the base unit of measure in the batch master
You use batch-specific units of measure when the ratio for conversion from the unit of measure into the
base unit of measure can differ from batch to batch.
These alternative units of measure include:
Proportion unit – this is the unit of measure in which you can enter proportions of the base unit of a
material. The total or physical quantity can consist of several proportions.
Product unit – this unit of measure describes the total quantity of a material as an alternative to the
base unit of measure. For example, one piece of a particular batch weighs 10 kilograms in total or is a
pipe of 1250 millimeters in length.
© SAP AG 1999
Active ingredients or concentrates are encountered above all in the production of basic materials in the
following industries:
Chemicals
Pharmaceuticals
Cosmetics
Foodstuffs
Full Full
quantity: quantity:
500l 500l
92%a.i.
w 45
Withdra
liters of
alcohol!
© SAP AG 1999
If active ingredients are not suitable for storage on their own, they are stored together with carrier
materials. A combination of a carrier material and an active ingredient is called a physical quantity or a
weighed quantity. The terms mixed quantity and telquel quantity are also common.
The situation is similar if materials contain impurities of varying degrees.
The amount of active ingredient in a material is its active ingredient quantity.
The potency (of active ingredient) varies within a material to a certain degree.
A material can contain more than one different active ingredient.
Full quantity:
500l
50 90% a.i.
Full quantity:
500l
92% a.i.
45 : X = 90 : 100
© SAP AG 1999
A certain amount of active ingredient is usually required, whether it is needed to manufacture a product
or to deliver goods to a customer.
Only the physical quantity (or the mixture) can be weighed, measured, or removed.
You can calculate how much physical quantity corresponds to an active ingredient quantity using a
simple rule of three.
45 g fat
85%a.i. Contains
100
I.U.
© SAP AG 1999
The price of products containing active ingredients is normally based on the active ingredient potency.
Thus, insulin and penicillin are sold in units that reflect their potency.
The covering property of a color is an important factor in determining its grade. The dilution of an acidic
solution with a valueless carrier substance gives you the percentage of active ingredient in the acidic
solution.
For example, a skimmed milk product is cheaper than a product made with full-fat milk.
Act. values
June
Planned values
May
Order
91% 92%
90%
© SAP AG 1999
The actual active ingredient proportion in a mixture can only be known when the mixture actually exists.
Until this point, however, a certain active ingredient proportion for a product is required. This planned
value is replaced by the actual value as soon as it is known.
This is what a customer may assume about an acid concentrate for a product when ordering, for
example. He or she uses the available price list as a guide. However, the concentrate in question is
represented only by a planned value. The actual value will only be known for sure when the concentrate
is actually delivered.
© SAP AG 1999
© SAP AG 1999
The product unit describes the total quantity of a material as an alternative to the base unit of measure.
For example, one particular piece of a material weighs 305 kilograms in total or is a coil weighing 610
kilograms.
The actual conversion factor of a batch is not usually known until goods are received.
Until the conversion factor is known, the system uses the planned values for the material, which are
defined in the material master record. This planned value is replaced by the actual value as soon as it is
known.
© SAP AG 1999
Contents:
Batch Management as Prerequisite
Batch-specific UoMs as an Attribute of a Batch
Integration of Batch-specific Units of Measure
Batch-specific Units of Measure in Logistics
© SAP AG 1999
Integration: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
1 pc = 100 KG 1 pc = 150 KG
29 g/kg 31 g/kg
X Y
A B Batch Batch
Batch Batch
© SAP AG 1999
The active ingredient proportion of a material can fluctuate. The proportional variance is usually higher
in the case of raw materials than in that of finished products.
The conversion factor between the alternative unit of measure and the base unit of measure can also
fluctuate.
Stocks of a material with varying active ingredient proportions or conversion factors between the
alternative unit and the base unit of measure have to be managed separately. You can manage these
stocks separately in terms of both quantity and value.
This goal is easily achieved through the use of Batch Management.
For this reason, active ingredient proportions can only be reproduced in the R/3 system for materials that
are subject to a batch management requirement. The use of Batch Management is an essential
prerequisite for the use of Active Ingredient Management and Product Quantity Management.
Batch-specific
Contains 2.5
unit 1 PC
milligrams platinum
equals
/KG
110 KG
A
Batch
© SAP AG 1999
The specification contains the description of the batch. It may also contain measured values and quality
characteristics, plus details concerning the usability of the batch and whether it is locked. Important date
specifications may also be included, such as the expiration date and the last goods receipt date, and so
on.
The active ingredient proportion is one of the criteria that should be used to differentiate between
batches of the same material. For this reason it is integrated into the batch specification.
Likewise, the conversion factor between alternative units of measure and base units of measure in a
batch forms a characteristic, which can be valuated differently from batch to batch.
Batch management
Classification
© SAP AG 1999
In the R/3 System, batch-specific units of measure (active ingredient management and product units) are
handled in Batch Management.
The active ingredient potency of a batch is stored in the batch's specification along with the batch-
specific ratio between the alternative unit of measure and the base unit of measure.
Batch Management uses those features found in the classification system. The characteristic values in
the batch classification form the specification.
To use batch-specific units of measure, you must have Batch Management set up, the class system must
be in use, and the material concerned must be able to be handled in batches.
Batch-
Batch-specific UoM
Batch management
Procurement Production SD
A
A A
Process/
Purch. order Sales order
production
W/house order W/house
© SAP AG 1999
The use of batch-specific units of measure is a function in Logistics that covers more than one
application. The active ingredient potency of a batch or the conversion factor between the batch's two
units of measure is managed throughout the logistics chain.
Differentiated prices for the alternative unit of measure can also be taken into account when valuating
the inventory and determining the sales price.
© SAP AG 1999
Contents:
The Central Unit of Measure for Active Ingredients
Relationship Between Units of Measure
Maintenance of Units of Measurement in Customizing
Percentage and User-defined Calculation
Linking of Master Data I
Linking of Master Data II
Active Ingredient Content in the Specification
Active Ingredient Characteristic: Special Features
Classification Maintenance in the Material Master
Maintenance of Units of Measure in the Material Master
Activating Active Ingredient Management in Customizing
© SAP AG 1999
Data Concept: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Proportion unit
BOM
Sales
Inventory
mgmt
C B
Purchasing A B
B
© SAP AG 1999
The proportion unit can be seen as a core element which is found throughout the applications and is used
to reproduce the active ingredient potency of a material.
The conversion between the proportion unit and the base unit of measure is continuously maintained in
the background and can be displayed by each of the respective applications.
The physical quantity is measured in base units of measure, whereas the active ingredient is measured in
proportion units.
In Logistics you may thus enter the active ingredient quantity instead of the physical quantity.
Proportion unit
Ratio
Grams of act.
ingr. GAI
Grams of active
ingredient per =
liter
Base unit of measure
G/L
Liter
L
© SAP AG 1999
The base unit of measure is the leading unit of measure for a material containing active ingredients. The
postings are carried out in this unit. If an entry is made in a proportion unit, the system converts this to
the base unit of measure before posting.
The proportion unit relates to the active ingredient. If several active ingredients have to be represented
for a material, different proportion units must also be defined in order to be able to clearly differentiate
between the ingredients.
You define a conversion ratio in order to convert quantities between the proportion unit and the base unit
of measure. This ratio constitutes a separate unit of measurement.
In this example, the active ingredient is measured in grams. GAI has been defined as the proportion unit,
i.e. for the specific purpose of "measuring an active ingredient".
The grams of active ingredient relate to one liter of the physical quantity.
This ratio is recorded in the unit of measurement G/L.
GC Grams of concentrate
Units of meas. Nondimensional
GCL Grams of concentrate/liter
Should be treated
as...
© SAP AG 1999
All units of measurement to be used in Active Ingredient Management must have previously been
defined in Customizing.
Units of measurement to be used as proportion units may not be assigned to a dimension.
In Customizing for Active Ingredient Management, a unit of measurement is assigned the role of the
proportion unit. Active ingredients are measured in it.
Some of the most common units of measurement for active ingredients are supplied with the standard
system. However, a self-chosen definition for an active ingredient proportion can be entered as a unit of
measurement at any time and designated an allowed proportion unit. To facilitate conversion into a
standard unit of measure, the self-defined unit of measurement is assigned a reference.
Characteristic
units of
measure
measure the active
ingredient
proportion in
relation to the base
unit of measure
© SAP AG 1999
If the active ingredient proportion for a batch is known, the active ingredient quantity can be calculated
from the base quantity. The relationship between the potency of the active ingredient and the base
quantity is stored in Customizing, and allocated to a characteristic unit of measurement.
If the relationship is measured by percentage, the conversion is specified by definition.
If the relationship is user-defined, any formula can be stored that describes the relationship between
proportion unit and base unit of measure.
Characteristic
act. ingr. cont.
A
A
Batch 1
Batch 2 A
Batch 3
Batch class
Specification
passed on
Material
© SAP AG 1999
Material master
Batch class
GAI <=> L
© SAP AG 1999
Active ingredient characteristics are assigned the special view 'S' within the batch class.
Characteristics with this view are recognized during material master maintenance. The information for
conversion beween active ingredient and physical quantity is adopted in the material master.
Material master
Density
Batch Density 1.1g/ccm
0.1 - 5 g/ccm
Covering power
Covering 80 %
power
50 - 100 %
© SAP AG 1999
In Batch Management in the R/3 System, the material passes on its specification to the batch. Depending
on the system settings, either it is mandatory for the batch values to lie within the limits defined in the
material master or these values are merely taken as defaults from that source.
Since the active ingredient content is part of the specification of the material and its individual batches,
the same logic applies. The active ingredient contents of the individual batches are checked against the
data in the material master.
© SAP AG 1999
The characteristic description specifies the active ingredient to which the data relates. In this way, a
unique assignment is created. For this reason, you should define one characteristic for each active
ingredient.
The relationship between active ingredient content and physical quantity must be specified as a unit of
measurement when you create the characteristic.
The characteristic must be numeric and have a single value.
View:
Classification
Shelf life expiration date
Material
Class type: Batches
Act. ingr. content
Class for 'fruit Citrus aroma
juices' 0.2 - 0.4 G/L
Flavors
- Orange
- Lemon
© SAP AG 1999
The active ingredient characteristic is assigned to the batch class and a value is assigned to it in the
material master.
As in the case of other batch characteristics, you can specify either an interval or a discrete value.
The entry in the material master is the planned value that is either mandatory or optional depending on
how the classification data has been maintained.
View:
Proportion/product unit of measure
Material
GK <=> L
X Prop. unit <=> Y Base UoM
30 GC <=> 100 Liter
© SAP AG 1999
After the classification view has been maintained, any active ingredient characteristics are known to the
system.
You must complete the information in the Proportion/Product Unit view: The system expects a planned
value for the active ingredient proportion.
The planned value specifies the assumed mixing ratio between active ingredient and physical quantity in
the characteristic unit of measurement.
If the actual active ingredient content of a batch is not known for a certain transaction, the system uses
the planned value from the material master.
The planned value for the conversion between active ingredient and physical quantity is transferred to
the units of measure table automatically.
Activate
Material
active ingredient mgmt?
Yes
© SAP AG 1999
You can make several Customizing settings for Active Ingredient Management in the system before the
component is activated.
After the component is activated, the active ingredient data is ready to be maintained in the material
master.
© SAP AG 1999
Create a separate unit of measurement for your active ingredient that is to serve as a
proportion unit. Remember that this unit must be nondimensional. If you define your
own entry, enter a key ending with your group number (for example, A##). The entry
must not be longer than three characters. The entry of an ISO code on the Details
screen for the unit of measurement is not mandatory.
1-2 Create a unit of measurement (for the characteristic or the ratio of active ingredient to
base unit of measure)
Create another unit of measurement for the ratio between physical quantity and active
ingredient quantity. Do not use percentage ratios. Enter a key ending with your group
number (for example, V##). The entry must not be longer than three characters. The
entry of an ISO code on the Details screen for the unit of measurement is not
mandatory.
Assign the unit of measurement from 1-1 [A##] the role of the proportion unit. Enter
the unit of measurement in the table of proportion units and choose a suitable reference
unit.
Define the ratio between physical quantity and active ingredient quantity for the unit of
measurement from 1-2 [V##]. To do this, use the proportion unit defined in 1-1, and an
appropriate base unit of measure of your choice (see note below).
Check the data sheet to see which materials have been prepared for your group. Choose
AI-1202-0##. Change the material.
1-1-1 Complete the classification data. Assign values to your active ingredient
characteristic.
1-1-2 Enter data in the Proportion/Product Unit view. To use the proportion unit,
you must first:
• Assign a planned value to the ratio active ingredient/physical quantity.
• Choose a proportion unit
1-1-3 Check the conversion ratio in the unit of measure table in the material master.
1-2 Create a unit of measurement (for the characteristic or the ratio of active ingredient to
base unit of measure)
Customizing (Tools → AcceleratedSAP → Customizing → Edit Project. Goto → SAP
Reference IMG)
Global Settings → Check units of measurement
Pushbutton Units of measurement (nondimensional)
Unit of measurement - Create
Make a new entry for the unit of measure A##. It should be capable of being used as a
proportion unit. Also enter A## as the reference unit of measure. However, you can
also enter kilogram4.
4
In this way, you could measure a characteristic in percent and specify in the material master that the
A## proportion is thus to be measured in relation to kilograms. Step 1-4 would not then apply.
1-1-1 In the Classification view, assign values to the active ingredient characteristic.
1-1-2 In the Basic Data view, under Additional data, choose the Proportion/Product
Unit view. Enter A in the Units meas. use field. Enter the required data.
1-1-3 In the Proportion/Product Unit view, click the tab page button and choose
Units of measure.
Contents:
Standard Price per Active Ingredient
Valuation of Single Batches Based on Act. Ingredients
Valuation Based on Several Active Ingredients
Sales Price Based on Active Ingredients
© SAP AG 1999
Active Ingredient Prices: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Proportion unit
Valuation
area
Material
© SAP AG 1999
You can store a valuation price for an active ingredient in a valuation record.
The price is always a standard price. It is calculated by combining the material number of the material
containing the active ingredient, the valuation area, and the proportion unit in which the active ingredient
is measured.
The name of the active ingredient cannot be entered. This means that if you want to carry out evaluations
in a material based on several active ingredients, you must use different proportion units.
$0.50 per
A
GAI (gram
Batch 2
of active
ingred.)
Physical quantity: 100 L
© SAP AG 1999
Valuation for a single batch is a prerequisite if you wish to calculate a valuation price based on the active
ingredient.
The active ingredient price is taken from the corresponding valuation record. It is a standard price and
does not change. Price fluctuations between batches can occur if they have different potencies of active
ingredient.
The active ingredient characteristic for a batch is assigned values using the active ingredient proportion.
This yields the active ingredient quantity contained in the batch stock.
If you multiply the quantity with the active ingredient price, you get the value of the batch stock.
You get the standard price per base unit of measure for each batch in relation to the physical quantity.
View:
Material Proportion/product unit of measure
Σ
Act. ingr. value, citrus aroma
Total value of
Active ingr. value: fruit batch
juice concentrate
© SAP AG 1999
For each active ingredient that is to be assigned an active ingredient price, the Valuated proportion
indicator must be set in the material master record.
You can flag several active ingredients in a material as Valuated proportion. The sum of all the
individual active ingredient values then constitute the total batch value.
This value in relation to the batch stock in the base unit of measure yields the standard price for the
batch.
© SAP AG 1999
The condition record can be defined on the basis of the proportion unit. This means that you can base the
sales price either on the physical quantity or the active ingredient quantity.
The sales price based on the active ingredient quantity is calculated as follows:
The actual active ingredient quantity is calculated for each split item in the delivery.
The active ingredient quantities are added together.
The sales price is taken for the cumulated active ingredients.
The sales price can be composed of the individual prices of several different active ingredients.
© SAP AG 1999
You need a valuation record for material AI-1202-0## that is based on the active
ingredient proportion. You know that the valuation for a single batch function is active
for this material. Check this if you are not sure.
Do this for material AI-1202-0## and the proportion unit you have created. The plant is
specified on the data sheet.
Enter a measured standard price for your active ingredient. Note how the system
recalculates the standard price for the material.
Display the material in base units of measure and in proportion units (A##). Hint:
Select Extras/Units Allowed to change the unit of measure.
For the finished material AI-1000-0##, you need a sales price that is based on the
active ingredient proportion.
Create a price condition for the finished material. The price condition is based on the
active ingredient component. To do this, choose the active ingredient unit as a
condition unit. The sales organization and the distribution channel are contained on the
data screen.
2-2 Post an ‘other’ goods receipt of 1000 L to a new batch for material AI-1000-0##. For
the active ingredient characteristic, enter a value that is different from the planned
value of the active ingredient.
2-3 Create a standard order of 100 liters of AI-1000-0##. The required organizational
levels and the customer number are specified on the data screen.
2-3-1 Go to the price conditions for the item. On what is the sales price based? On
what sold quantity is the sales price based?
2-3-2 For your sales order item, enter the batch number created in 2-2.
2-3-3 Go again to the price conditions for the item. On what sold quantity is the sales
price now based?
Complete the Proportion/Product Unit view under Additional data. Activate the
Valuated proportion field.
Change material
Logistics → Central Functions → Batch Management → Environment → Material
Master → Material → Change → Immediately
or
Logistics → Materials Management →
Material Master → Material → Change → Immediately
Contents:
Planned and Actual Values in the Master Data
From Planned Value to Actual Value
Inventory Correction Factor
© SAP AG 1999
Actual and Planned Values: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
P la n n e d v a lu e s
Bill of material
Sales order
Goods
Goods movement
movement
Invoice
verification
?
= A c tu a l v a lu e s
© SAP AG 1999
We begin the logistics chain by procuring a component through an ordering transaction. We order a
certain quantity of active ingredient. The goods receipt for the order is always carried out in physical
quantities. Up to this point, only the planned active ingredient was known. It is only at this point that we
can enter the actual value for the batch and trigger any corrections needed to the quantity of goods
received. Thus invoice verification operates with actual values.
The active ingredient quantity can be entered in all documents with the exception of the production order
(process order). If the target quantity is entered in active ingredient quantities, a corresponding open
document item is processed in active ingredient quantities.
As soon as the batches have been determined, the job-order costing uses the actual value in its
calculations. The results of the calculation may change if there is an active ingredient price in the stock
valuation of the components.
A batch must have been entered by the goods movement stage at the latest. The system can then replace
the planned value with the actual value.
View:
Proportion/
product A
unit Batch
Material
Actual value
Char. Plan value Leading proport.
0.28 G/L
Citrus 0.3 G/L
aroma
Fruit juice
10 %
concentrate
© SAP AG 1999
The planned value for an active ingredient proportion is specified in the material master record. The
system works with this value as long as the batch has not yet been selected for a business transaction.
The actual value is only assigned to a batch that actually exists. It is part of the batch's specification and
is used to valuate the active ingredient characteristic.
If an active ingredient is taken into account for planning purposes, the 'leading proportion' indicator must
be set in the material master record.
There can only be one leading active ingredient.
Pc Material:
May
Plan val. 0.1 liters act. ing. per liter
Quantity 100 liters
t
Batch:
Act. Val. 0.2 liters act. ing. per liter
Quantity 100 liters
Correction
factor
Current stock/reqmt 2
overview
New available quantity: 200 liters
Overview of availability
© SAP AG 1999
The planned value for an active ingredient proportion can differ slightly from the average actual value of
all the batches of a material. In this way, less or more quantity is actually available than identified in the
stock overview.
The available amount can be corrected for planning purposes using the inventory correction factor. The
effect it has may be seen in the “current stock/requirement” and “total availability” list displays.
The inventory correction factor works in the following way: the warehouse stock is corrected
temporarily for planning purposes before it is included in the calculation of available quantity.
The inventory correction factor does not have any influence on the total stock and does not trigger an
inventory posting. The stock overview remains unchanged.
© SAP AG 1999
1-1 The material AI-1201-0## contains an active ingredient, which is measured in the
proportion unit KI1. It is your job to purchase the material.
1-1-1 Create a new purchase order for vendor 100, purchasing organization IDES
Germany, purchasing group Zuse, K, company code SAP Germany. Order the
material AI-1201-0##.
Order 40 units of the active ingredient for next week. Enter the purchase order
price of your choice.
1-1-2 On the item detail screen, choose Delivery. Remember that the quantity of
active ingredient that is actually delivered may slightly differ from the quantity
ordered. You should therefore maintain the tolerances accordingly.
1-4 The active ingredient of material AI-1201-0## has its own valuation price.
Display the valuation record for this active ingredient. Make a note of the standard
price of the active ingredient and the material.
Display the Financial Accounting screen for material AI-1201-0## at batch level and
make a note of the moving average price, the standard price, and the stock. Which price
control does the valuation type have (= batch)?
1-6 The goods receipt for material AI-1201-0## may be found in quality inspection.
1-6-1 Call up results recording for the incoming inspection lot. You should have just
measured the active ingredient content. Enter a value that is within the
tolerances. Make sure that you enter a value that does not correspond with the
planned value from the material master. Close the characteristic.
1-6-2 Record the usage decision. Choose the inspection lot. The whole goods receipt
is to be posted to unrestricted stock. The batch is released.
1-8 Quality inspection has found that the active ingredient content does not correspond
with the planned value. An adjustment posting for the goods receipt is thus required.
1-8-1 Trigger a posting that is based on the goods entry inspection lot for the
purchase order.
1-8-2 Check the purchase order history once again. What do you find?
Display the Financial Accounting screen for material AI-1202-0## at batch level and
compare the values with the results obtained in 1-5.
1-2 Call up the material list and enter the material AI-1201-0# as a third component. You
need 10 KG. The component is kept in stock and is processed in operation 10 in the
production process.
1-3 Determine the costs for the process order and display the itemization. Make a note of
the costs displayed.
1-4 Call the material list and carry out batch determination for material AI-1201-0##.
Choose a batch. It is advisable to choose a batch containing an active ingredient
proportion that differs from the planned value for the active ingredient.
1-5 Determine the costs for the process order once again and display the itemization.
Compare the costs with those costs that were first determined. What do you find, and
how do you explain the result?
You produce the finished product and enter the active ingredient
proportion at the goods receipt stage. The proportion differs
slightly from the planned value. You want to include this
information in your schedule and therefore you must correct the
basis for your planning.
1-1 You produce the finished product AI-1000-0##. It is managed in the base unit of
measure liter.
1-1-1 Set the active ingredient characteristic as the leading proportion for material AI-
1000-0##. Find out the planned value.
Planned value: _____________________________________________
1-1-2 Without using a production order, post an ‘other’ goods receipt with movement
type 521 to any new batch (or several new batches). The planned active
ingredient proportion has not quite been attained. Assign characteristic values
to the batch(es) accordingly.
1-2-1 Call the current stock/requirements list for the finished product.
Switch on the display of the available quantity in proportion units.
Make a note of the available quantity.
In the base unit of measure
In the proportion unit
Available quantity in base unit of measure: _________________
Available quantity in proportion unit: ________________
1-2-2 Create a second session. Here, you carry out an inventory correction for the
finished product.
Carry out the inventory correction in processing mode. Output a list that also
contains the batches.
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________
1-2-4 Call up the stock overview and check that the warehouse stocks are displayed
correctly in every unit of measure that has been defined.
1-1 The material AI-1201-0## contains an active ingredient, which is measured in the
proportion unit KI1. It is your job to purchase the material.
1-1-1 Create purchase order
Logistics → Materials Management → Purchasing → Purchase Order →
Create.→ Vendor/Supplying Plant Known
1-1-2 On the item detail screen, choose Delivery. Maintain the tolerances for
overdelivery as a percentage, or choose the Unlimited indicator.
The system displays the price per base unit of measure. This price is based on the
assumption that the base unit of measure contains the same active ingredient proportion
as specified in the planned value.
1-6 The goods receipt for material AI-1201-0## may be found in quality inspection.
1-6-1 Enter inspection result:
Logistics → Central Functions → Batch Management → Environment →
Quality Inspection → Worklist → Results Recording
Search for the inspection lots for your material AI-1202-0##. The system will
find one inspection lot and display it in the frame on the left-hand side.
Double-click line 9999 Check with material specification for work center in the
left frame.
Field name Values
Material AI-1201-0##
Operation 10 9999
On the entry screen:
Select the item and click Edit - Choose
[or the magnifying glass icon < ]: xQuer = differs from the planned value.
Edit - Lock [or choose the lock icon &],
(by-pass any dialog boxes by choosing Accept). Save.
The result from QM has been transferred. The batch has a value that differs from the
planned value for the active ingredient characteristic.
1-9 Display the accounting view of the material AI-1201-0## at batch level
Logistics → Central Functions → Batch Management → Environment → Material
Master → Material → Create
or
1-1 Production for a finished material and batch valuation at goods receipt
1-1-1 Leading proportion of an active ingredient in material
Logistics → Central Functions → Batch Management → Environment →
Material Master → Material → Change → Immediately
or
Logistics → Materials Management →
Material Master → Material → Change → Immediately
Field name or data type Values
Material AI-1000-0##
View Basic data
Additions → Proportion/Product Unit view
Set the active ingredient characteristic AIC020## as the leading proportion.
The planned value is 0.10000 LSL (LSL = LW1 per liter)
1-1-2 ‘Other’ goods receipt without reference to production order
Logistics → Materials Management → Inventory Management.→ Goods
Movement → Goods Receipt → Other
Field name or data type Values
Movement type 521
Plant 1100
Storage location 0001
Material AI-1000-0##
Quantity 100 liters
Batch number Any
Active ingredient proportion Not 0.1000 LSL
for example, 0.3000 LSL or
0.02 LSL
Contents:
The Central Unit of Measure for Product Quantities
Relationship Between Units of Measure
Maintenance of Units of Measurement in Customizing
User-defined Calculation
Linking of Master Data
Material Master Maintenance
The Product Quantity in the Specification
Classification Maintenance in the Material Master
Maintaining Units of Measurement in the Mat. Master
Activating Product Quantity Management
© SAP AG 1999
Product Quantity Management: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Product unit
BOM
Sales
Inventory
mgmt
Purchasing C B
B
A B
© SAP AG 1999
The product unit runs like a thread through the applications and is used to replicate the alternative unit of
measure of a material in a batch.
The conversion ratio between the product unit and the base unit of measure is continuously available and
can be displayed by each of the relevant applications.
Unlike in Active Ingredient Management, when you make a specification in the product unit, the entire
stock - not just some of the materials in the batch - is assigned with the batch-specific conversion factor
and can be displayed in alternative units of measure.
In Logistics you may thus enter the alternative product unit instead of the base unit of measure.
Product unit
Ratio
Piece PC
Weight per piece
=
KPP
Base unit of measure
Kilogram
KG
© SAP AG 1999
The base unit of measure is the leading unit of measure for a material. If an entry is made in the product
unit, the system converts this to the base unit of measure before posting.
The product unit relates to the entire stock of a batch. If there are several alternative units of measure
which may have different ratios to the base unit depending on the specific batch in question, different
product units must be used to represent the alternatives.
The conversion formula for conversions between the product unit and the base unit of measure is stored
in the form of a ratio. This ratio constitutes a separate unit of measurement.
In this example, the material is displayed in pieces as well as in the base unit of measure KG. PC has
been defined as the product unit.
Conversion from the base unit of measure KG is carried out on a batch-specific basis.
This ratio is recorded in the unit of measurement KPP (kilogram per piece).
PC Pieces/steel beams
Units of meas. Nondimensional
KPP Weight per piece (steel beam)
Should be
treated as...
PC Pieces/steel beams
© SAP AG 1999
All units of measurement to be used in product quantity management must have previously been defined
in Customizing.
Units of measurement to be used as product units should not be assigned to a dimension.
The role of the product unit is assigned to a unit of measurement in Customizing for Product Quantity
Management. Stocks of the material can be shown in this unit.
Quantity conversions are carried out on a batch-specific basis from the base unit of measure KG.
Some of the most common units of measurement for the product unit are supplied with the standard
system. However, a self-chosen definition for an alternative unit of measure can be entered as the unit of
measurement and designated an allowed product unit at any time.
To facilitate conversion into a standard unit of measure, the self-defined unit of measurement is assigned
a reference.
Calculation Calculation
Define base quantity from Define product quantity from
product quantity base quantity
KPP PPK
KG/PC PC/KG
Define the conversion factor in such a way that the result is > 1.
© SAP AG 1999
Example
The quantity in the product unit PC is converted to the quantity in the base unit of measure KG on a
batch-specific basis.
This ratio is recorded in the unit of measurement KPP (kilo per pc) or PPK (pc per kilo).
To ensure that the characteristic value (measured in KPP or PPK) delivers plausible results for the
product unit, there are two ways of defining the unit of measure for this characteristic: On the basis of
the product unit or on the basis of the base unit of measure.
Define the unit of measure in such a way that the characteristic value will generally be greater than 1.
Characteristic
weight per pc
A
A
Batch 1
Batch 2 A
Batch 3
Batch class
Specification
passed on
Material
© SAP AG 1999
The ratio between the product unit and the base unit of measure is stored in a batch characteristic and
thus becomes part of the specification.
The material transfers the information to its batches.
Material master
Batch class
KG <=> PC
© SAP AG 1999
Product unit characteristics are assigned the special view 'S' within the batch class.
Characteristics with this view are recognized during material master maintenance. The information for
conversion beween product unit and base unit of measure is adopted in the material master.
Material master
Origin USA,
Batch Origin USA
Switzerland
Weight
Weight per pc
120 KPP
120 - 125 KPP
Test certificate
Test 3.1B
certificate
3.1A 3.1B
© SAP AG 1999
In Batch Management in the R/3 System, the material passes on its specification to the batch. Depending
on the system settings, either it is mandatory for the batch values to lie within the limits defined in the
material master or these values are merely taken as defaults from that source.
Since the product quantity characteristic is part of the specification of the material and its individual
batches, the same logic applies. The exact product quantities in the individual batches are checked
against the data in the material master.
View:
Classification Origin
USA Switzerland
Material
Class type: Batches
Weight per pc
Class for ‘steel
120 - 125 KPP
beams’
Test certificate
- 3.1A
- 3.1B
- 3.1C
© SAP AG 1999
The product unit characteristic is allocated to the batch class and a value is assigned to it in the material
master.
You have to enter a discrete value for the planned conversion factor. The relevant characteristic for
conversion must be defined as a single value, with no interval values.
The planned value in the material master should be a mean value within the expected batch conversion
factors.
View:
Proportion/product unit of measure
GK <=> L
X ProductUn <=> Y Base UoM
1 PC <=> 120 KG
© SAP AG 1999
After the classification view has been maintained, any product quantity characteristics are known to the
system.
You must complete the information in the Proportion/Product Unit view: The system expects a planned
value for the conversion to the base unit of measure.
The planned value specifies the assumed conversion ratio between the product quantity and the base unit
of measure in the characteristic unit of measurement.
If the concrete product quantity of a batch is not known for a certain transaction, the system uses the
planned value from the material master.
The planned value for the conversion between product quantiy and base unit of measure is transferred to
the units of measure table automatically.
Activate
product qty
Material
management?
Yes
© SAP AG 1999
You can make several Customizing settings for Product Quantity Management in the system before the
component is activated.
After the component is activated, the product quantity data is ready to be maintained in the material
master.
© SAP AG 1999
1-1 Create unit of measurement (for the characteristic describing the ratio of the product
quantity to the base unit)
Create your own unit of measurement. It should then be used to carry out conversions
between the physical quantity and the product unit of measure. You will use this unit to
measure the ratio kilogram/piece. The new unit of measurement should be nondimensional.
Enter a key ending with your group number (for example, U##). The new entry should be
defined with 3 decimals and be rounded to three decimal places. The entry of an ISO code on
the Details screen for the unit of measurement is not mandatory.
Verify whether the unit of measure piece can be used as a product unit.
5
For example, if 1 PC = 100 KG, then the quotient is best defined with KG/ST. Since KG is the base unit of
measure, you choose Define calculation of base quantity from product quantity.
(C) SAP AG LO955 20-17
1-6 Create a new material. You can use the copying facility.
The reference material is Y-351.
Create a new finished product PM-1000-0## for plant 1100. Adopt the views
Basic Data 1, Classification, Purchasing and Accounting 1 from the reference material.
Make the following changes:
• The short text is "2 meter steel beam".
• Delete the assignment to a batch class.
Edit the views you have chosen and then save.
1-9 Display the material document. Call up the item details. To display the relation
between piece and kilogram in the batch, choose Goto → More functions → Quantity
conversion.
1-1 Create unit of measurement (for the characteristic describing the ratio of the product
quantity to the base unit)
Customizing (Tools → AcceleratedSAP → Customizing → Edit Project. Goto → SAP
Reference IMG)
Global Settings → Check units of measurement
Pushbutton Units of measure (nondimensional)
Unit of measurement - Create
Views Values
Views Basic data 1
Classification
Purchasing
Accounting 1
1-7-1 In the Classification view, assign the class PM## and assign values for the
active ingredient characteristic (for example, 18 to 22 U##).
1-7-2 In the Basic Data view, under Additional data, choose the Proportion/Product
Unit view. Enter B in the Units meas. use field. Enter the required data.
1-7-3 In the Proportion/Product Unit view, click the tab page button and choose
Units of measure.
The conversion is carried out at the planned value of 1 piece/20 KG.
The conversion ratio shows that the batch contains 100 pc steel beams, with an average
weight of 19 KG/PC.
Enter kilogram (= base unit of measure) in the first field for units, and PC (=product
unit) in the second.
Choose ENTER to get the system to generate the additional column for displaying the
available quantity in the product unit.
Contents:
Quantity Conversion with Product Unit
Quantity Conversion in Inventory Management
Stock Transfer – Cases
Stock Transfer with Product Unit
© SAP AG 1999
Product Units of Measure: Unit Objectives
© SAP AG 1999
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Status 3.0
• The conversion factor between alternative unit of measure
and base unit of measure is defined at material level.
• All batches of the material have this conversion factor.
as of 4.0
• The conversion factors that are defined for all batches of the
material are planned values.
• The conversion factors of the individual batches are defined
when the batch is created and cannot subsequently be
changed They represent the exact value or an average value.
All goods movements are carried out with this conversion
factor.
© SAP AG 1999
Goal:
You should ensure that a material does not have to be created for every dimension. Products that differ
only in dimension and in a few other characteristics should be grouped under one material number. This
reduces the data volume and makes maintenance easier.
In Release 3.0, the conversion factor between the alternative unit of measure and the base unit of
measure is defined at material level.
In the standard system from 4.0 onwards, you can manage products with different conversion factors as
batches under one material number.
Stockkeeping unit: KG
Batch unit: PC
Batch properties:
- Fusion number
- Origin
- Certificate
- Length (!) 6000 mm
Fixed batch
conversion factor
© SAP AG 1999
Scenario:
The conversion factor is specified for a batch.
All pieces are roughly the same weight. All goods movements are carried out with the conversion
factor for this batch.
New batch
© SAP AG 1999
Stock transfers between batches with different conversion factors in one or more product units are
fundamentally possible (T160M).
The transferred quantity is checked for errors after the decimal point with the conversion factor of the
receiving batch.
Example: Numbers of pieces are defined as whole numbers. Weight per piece,
issuing batch 300 kg Weight per piece, receiving batch 330 kg
Stock transfer of 300 kg = 0.91 pc Error after decimal point Stock transfer of
330 kg = 1.0 pc OK
© SAP AG 1999
Appendix:
If you change the conversion factor for a batch, you cannot subsequently post a reversal for this batch,
as it would result in inconsistencies.
© SAP AG 1999
Availability Check
Introduction for Batches ? Batch
XXXX
+ YYY
Batch Levels Batch
Price Determination = ZZZZ
© SAP AG 1999
Summary (2)
Integration of Batch-
Summary
specific Units of Measure
© SAP AG 1999
Contents:
Menu Paths
© SAP AG 1999
Frequently-used Menu Paths
Master Data
Activity Menu Path
Material master record Logistics → Materials Management → Material
Master → Material → Create|Change|Display
or
Logistics → Central Functions
→ Batch Management → Environment
→ Material Master → Material
→ Create|Change|Display
Batch master record Logistics → Central Functions
→ Batch Management → Batch
→ Create|Change|Display
or
Logistics → Materials Management → Material
Master → Batch → Create|Change|Display
Valuation record for active Logistics → Central Functions
ingredient management → Batch Management → Batch-specific Units of
Measure → Standard Price
→ Create|Change|Display
Inventory Management
Activity Menu Path
Goods receipt | Transfer Logistics → Materials Management → Inventory
posting | Goods issue Management → Goods Movement → Goods
Receipt|Transfer Posting|Goods Issue
Current Logistics → Materials Management → Inventory
stock/requirements list Management → Environment → Stock →
Stock/Requirements List
Material documents Logistics → Materials Management → Inventory
Management → Material Document →
Change|Display
Quality Inspection
Activity Menu Path
Maintain material Logistics → Central Functions
specification → Batch Management → Environment
→ Quality Planning for Material → Inspection
Planning → Material Specification → Edit|Display
or
Logistics → Quality Management
→ Quality Planning → Inspection Planning →
Material Specification → Edit|Display
Maintain master inspection Logistics → Central Functions → Batch
characteristic Management → Environment → Quality Planning
for Material → Basic Data → Inspection
Characteristic → Create|Change|Display
SD
Activity Menu Path
Sales order Logistics → Sales and Distribution → Sales →
Order → Create|Change|Display
Create delivery Logistics → Sales and Distribution → Sales →
Order → Subsequent functions → Outbound
Delivery
Production
Activity Menu Path
Production order Logistics → Production → Production Control →
Order → Create|Change|Display
Customizing
Activity Menu Path