You are on page 1of 2
s012002018 “TestOut Labsin Lab Report: 4.3.3 Connect Network Devices Your Score: 4 of 4 (100%) Elapsed Time: 2 minutes 2 seconds Y Connect the fiber network on Floor 1 Show Details, Y Connect the fiber network on Floor 2 Show Details V Plug the switch on Floor 2 into a Critical Load outlet Computers on Floor 2 are connected to the internet Explanation To determine the appropriate network components to use, examine the ports on the switch and the fiber patch pane. = Because the switch does not have a fiber port, the SFP module with the LC fiber connector must be used. The only cable that can be used to connect the switch and the server is the SC to LC fiber cable, = SC connectors have square connectors that are pushed in to connect aoe | = LC connectors have both connectors linked together. =a When connecting the fiber cable to the patch panel: © On Floor 1 = Connect SC Connector A to port 3 = Connect SC Connector B to port 4 © On Floor 2: = Connect SC Connector A to port 1 = Connect SC Connector B to port 2 Complete the following steps to finish the lab: On the Shelf, expand the Adapters category. Drag the SFP Transceiver (LC) to an open SFP port on the switch, On the Shelf, expand the Cables category. Drag the SC to LC fier cable to the SFP LC port on the switch In the Select Connector window, click the LC connector. In the Selected Component pane, drag the SC Connector (A) to port 3 on the fiber patch panel In the Selected Component pane, drag the SC Connector (B) to port 4 on the fiber patch panel 8. Switch to the Networking Closet on Floor 2. 9. On the Shelf, expand the Adapters category. 10. Drag the SFP Transceiver (LC) to an open SFP port on the switch. 11. On the Shelf, expand the Cables category 12. Drag the SC to LC fiber cable to the SFP LC port on the switch, 13. Inthe Select Connector window, click the LC connector. 14. In the Selected Component pane, drag the SC Connector (A) to port I on the fiber patch panel. 15. Inthe Selected Component pane, drag the SC Connector (B) to port 2 on the fiber patch panel hitpssednAestout comicient-v5-1-10-54/starlasim html 12 s012002018 “TestOut Labsin 16, Switch to the back view of the rack. 17. On the Shelf, drag the AC Power Cable to the AC port on the back of the switch, 18. In the Select Connector window, click AC Power Connector (Female). 19. In the Selected Component pane, drag the AC Power Connector (Male) to an open Bank 1 Critical Load outlet. 20, Switch to the front view of the rack to confirm the network switch has power, 21. In the navigation pane, click Floor 2. 2. Click any of the computers on Floor 2 23. In the notification area, click the network icon > Open Network and Sharing Center, 24. Confirm the computer has an Internet connection, 25. Click Done to finish the lab. hitpssednAestout comicient-v5-1-10-54/starlasim html 22

You might also like