M D L K J I H G F E C B A: Foundation Plan Place: Daniel Taboh
M D L K J I H G F E C B A: Foundation Plan Place: Daniel Taboh
19.95
1.60 3.20 3.55 .25 1.05 1.30 1.60 1.05 1.30 .45 1.90 .75 1.15 .80
S 110*110 S 110*110
S 110*110
S 110*110
8 8
B(20x35)
.15
S 110*110
.65
.50
B(20x35) P 20*30 B(20x35) P 20*30
P 20*30 P 20*30 P 20*30
7 7
P 30
B(20x35)
B(20x35)
2.25
B(20x35)
B(20x35)
B(20x35)
2.95
P 20*30
S 110*110
S 110*110
.70
B(20x35) B(20x35)
.20
A A
.20
P 30 P 30
P 20*30 P 20*30 P 20*30
P 20*30
1.85
S 110*110 S 110*110 S 110*110
B(20x35)
B(20x35)
S 110*110 S 110*110
11.00
11.00
6 6
S 110*110
P 20*30 B(20x35)
P 20*30 B(20x35) P 20*30
5 5
.20
.20
P 20*30 P 20*30
.25
.25
P 20*30
4 4
B(20x35)
2.00
B(20x35)
B(20x35)
S 110*110 S 110*110
B(20x35)
3 3
P 20*30
B(20x35)
P 20*30
P 20*30
B(20x35)
B(20x35)
B(20x35)
2.05
2.05
S 110*110
P 20*30 P 20*30 P 20*30
2 2
B(20x35) B(20x35)
.80
.80
P 20*30 B(20x35) B(20x35) B(20x35) P 20*30
1 1
S 110*110 P 20*30 P 20*30
S 110*110 S 110*110
S 110*110
S 110*110 S 110*110 S 110*110
D 1.60 3.20 3.55 .25 1.05 1.30 1.60 1.05 1.30 .45 2.70 1.15
A B C DE F G H I JK L M
FOUNDATION PLAN PHASE Indice A N°
PROJECT DESIGNING
OWNER Mr DANIEL TABOH FIRM Scale 1/100
PLACE: PB Date SEPTEMBER 2020