LNG
NomorSPK. 24/SPK-ANG/A/2020
TanagalSPK —; 13.0ctober 2020
‘Alamat Pemesan 8 Penagiban :
DT LAIU NIAGA GEMILANG.
ukan Sentra Naga BIOK
‘Green Lake City, Dur Kosambl
SURAT PERINTAH KERJA (SPK)
Nomor Referensi
[Nomor FP): 042/FP1/HNKM/LNG/IK/2020,
Nama Vendor
sam Mansur
“Kel. Levwinanggong RYJRW 017006
Kecamatan Lemahabang, Crebon
Jakarta 11730) UP. 2fisam Mansur
Telp +62 838-6606-1855
Fax
Email
No KETERANGAN PEKERIAAN SATUAN HARGA SATUAN JUMLAH
|JASA PEKERJAAN PENGECATAN PROYEK SPBU SHELL HANKAM
7 |Pengecstan Building interior 23795 m2 | Ro 38,000 | Rp 428318)
2 [Pengecatan Buldng 1 Eksterior 383.77 m2 | Rp 20,000 | Rp 3,675,380)
3 [PengecatanPlint Dining interior Bulging T ‘801_m2 | Rp 35,000 | Rp 280,210)
‘4 _[Pengecatan Pint Dnding Eksterior Suilding T 70.10 m2 [Ro 37,000 | Rp 373,808
'5[Pengecatan Building ? interior 306.55-m2_| Rp 38,000 | Ro, 3 517.828]
16 [Pengecatan Building Eksterior 32522 m2_—| Rp 20,000 | Rp 2,504,480
7” [Pengecatan Plint Dinding interior Building? 956 m2 | Rp 35,000 [Rp 334513
8 _[Pengecatan Pint Dinding Etsterior Sullding ? 7073-m2 | Rp 37,000 | Rp 399,195,
3 [Pengecatan Rumah Drum 100 Is | ®p 200,000-[ Re 200,000)
710 |Pengecaran Rumah APAR. 1.00 [Rp 100,000-[ 100,000]
11 [Pengecatan Sallara 29.00 unit | Ro 250,000 | Ro 77250,000|
22 [Pengecatan Bak Kontrol Canopy 3.00 unit [ RD 50,000 | Rp 150,000]
1 [Pengecata Pulau Pompa 3.00 unit | Rb 700,000 | Rp 00,000
1 [Pengacatan Payment Booth 3.00-unit [RD 500,000 | Rp 4500,009|
15 [Pengecatan Water Facilty 1.00 unit | Re. 500,000 | Re 500,000
16 [Pengecatan Tang Benders 3.00 unit | RD '300,000,[ Rp 900,000
17_[Pengecatan Gril Drainase ingress Egress 32a7m | Rp '50,000 | Ro 7508 500|
18 [Pengecatan Grating 7Ox70x7 30.00 unit [ RP 50,000 | Ro 300,000
39 [Pengecatan Tutup Ol Catcher 31.00-unit—[ RP 200,000-| Rp 200,000
20_[Pengecatan Tutup Septic Tanj 31.00-unit | Rp 150,000 | Ro 150,000.
21 [Pengecatan Frame Vent Stack 1.00-unit [RP 50,000 | Rp 50,000]
22 [Pengecatan Bollard Vent Stack 1100-unit | Rp. 350,000 | Ro 350,000,
23 [Pengocatan Bak Kontrol Elektra dan iT 2.00-unit | RP 50,000 | Rp 100,000,
24 [Pengecatan Bak Kontrol Grounding 32.00 unit | Rp 30,000 | Rp 120,000
25 [Pengecatan Bak Kontrol Bonding di Decharge Point .00-unit | RP 20,000 | Re 10,000]
26 [Pengecatan Rumah Pompa 31.00-unit | Rp 7100,000-[ Ro 700,000
27 [Pengecatan Siku Ege Bas m [Ap 20,000 [Ro 049,000]
728 |Pengecatan Zebra Cross 100 lot | Rp 7,000,000 [Ro 000,000
729 [Pengecatan Diable Sign 4100_lot | Rp '150,000,[ Rp 150,000,
30 [Pengecatan Marka Jalan di Area Discharge Point 1100 lot | Ro 500,000-[ Rp 500,000)
‘SUBTOTAL fy 35ABE ORS
‘DISKON| RP 0456,005
‘GRAND ToTAt| Rp 25,000,000.
‘Term of Payment FOP] ‘Dakumen Pendukung Tagihan
‘Pembayaran Sebvesar ip 25.000,000 dibayarkan 7 Hari | —1__|Kwitansi Asi bermeterai
1 | Kerja Setelah Pekerjzan Selesa Serta dokumen 2 |Ast Berita Acara dan sera terima Pekerjaan yang ditandatangani oleh keduabelah pihak
pendukung tagihanditerima dengan LENGKAP dan sina ohare Pa
bai “4 [Copy Surat Perintah Kerja (SPR) yang sudah dtanda tangent
Pembayaran dtujukan Ke:
2 Pembayaran ‘Bank A/C BCA 3000617488
‘tas Nama [Hlsam Mansur
ee
Page 1 of 2