Installation

Handling CAUTION: This unit must be lifted


with the outmost care. Avoid shock
A specific lifting method is load by lifting slowly and evenly. To
recommended as follows: prevent any damage, position the
1. 4 lifting points are built into the lifting bar so that the slings do not
unit. touch the unit.
2. Slings and spreader bar to be
provided by rigger and attached
to the 4 lifting points.
3. Minimum rated lifting capacity
(vertical) of each sling and
spreader bar shall be no less than
the tabulated unit shipping
weight. Refer to Figures 1 and 2

Figure 1 - Rigging the unit - CGWN - CCUN (205-211)

A B
C

CG-SVX06B-E4 15
Installation

Figure 2 - Rigging the unit - CGWN - CCUN (212-215)

A
C
B

A
C
B
D

16 CG-SVX06B-E4
Installation

Figure 3 - Rigging the unit - RTCA

CG-SVX06B-E4 17