Inputs n= 0.

013 Invert Level for M1= 100 m

Srno Pipeline Distance Population Avg water consumption Per capita sewage Qavg M
m lpcd lpcd m3/day

1 M1-M2 800 800 400 360 288 3.860396


2 M2-M4 400 1400 400 360 504 3.7010258
3 M3-M4 300 400 400 360 144 4.0221553
4 M4-M5 700 2300 400 360 828 3.5378065

The above sheet should iteratively solve Vfull and Va until Va is equal to 0.7. For each iteration, F9 should be pressed.
Earth Cover= 1 Thickness of pipe= 0.05

Qpeak Qdesign Vdesign Area Dia Dcommercial Vfull Qfull Qd/Qfull Va/Vfull
m3/day m3/day m3/day m2 mm mm m/s m3/s
From Graph
1111.7940504 2252.3881 0.7 0.0372419 217.7563 225 0.7 2404.73 0.936649037 1.02
1865.3170007 3781.034 0.7 0.0625171 282.1334 310 0.73 4760.466 0.794257049 0.98
579.19036201 1172.78072 0.7 0.0193912 157.1294 225 0.96 3297.916 0.355612725 0.73
2929.3037643 5941.40753 0.7 0.0982376 353.6664 380 0.7 6859.121 0.86620533 1.01
Va Va check Slope Fall Upstream Invert levels Downstream Invert Levels
m/s m/m m m m

0.714 OK 0.003843 3.07439308350991 98.725 95.6506069164901


0.7154 OK 0.002726 1.09042933394335 95.5656069164901 94.4751775825467
0.7008 OK 0.007228 2.16838826461434 98.725 96.5566117353857
0.707 OK 0.001911 1.33747036944863 94.3201775825468 92.9827072130981