DEVELOPMENT
The HVAC Duct Construction Manuals as published
by The Sheet Metal and Air Conditioning Contrac:
tors National Association Inc. (SMACNA) are the
main practical standard for Contractors and Engi-
neers for duct construction.
Recently developed proprietary systems, such as
the Transverse Duct Connector System for con
structing rectangular sections of ductwork have not
been covered by the existing manuals. The wide
spread acceptance of the TDC system by contrac:
tors (over 400 systems sold to date) make this
addendum to the existing manuals a necessity.
TDC iS NOT T-24
Some have confused the relationship of the
SMACNA T-24 transverse joint with the TDC sys-
tem. They are not the same profile and the ratings
published for the T-24 joint were not intended to
represent ratings of the TOC joint. SMACNA has
not rated the TDC system. It is considered proprie-
tary and is subject to SMACNA policy on proprie-
tary items, Manufacturers and independent testing
laboratory authorities are to evaluate proprietory
systems using analyses and tests as described in
Section VII of the 1985 Duct Construction
Standards.
The TDC addendum construction tables therefore
display the results of extensive duct testing that fol-
lowed the procedures for Section Vil, combined
with the results of the computer generated equa~
tions based on the actual test findings. Further test-
ing confirmed the accuracy of these results
We thank the technical staff of SMACNA, especially
Mr. John Stratton for his interpretation and analysis
of the Duct Construction Manual.
FUNCTIONAL CRITERIA
The criteria used by SMACNA in its test program
and in development of new duct tables is as
follows:
Maximum joint deflection 0.25”
Maximum sheet deflection on duct
over 24” wide 0.75”
Maximum sheet deflection on duct
19” through 24” wide 0.625”
Maximum sheet deflection on duct
13” through 18” wide 0.500”
Maximum sheet deflection on duct
up to 12” wide 0.375"
Maximum tensile strength of
material 24,000 PSI
Other measurements needed for the computer gen-
erated calculations were: Joint separation, Duct
Corner displacement at the joint and Duct Corner
displacement halfway between the joints.
All measurements were repeated for the various
static pressures, duct sizes and gauges, and were
witnessed and certified by a Pittsburgh Testing Lab-
oratory representative. Test results are available
upon request.
LIMITATIONS
The addendum construction tables are based on
The Lockformer TDC System as constructed
according to the methods shown in the TDC
‘Assembly Instruction Brochure only.
USE OF THE TABLES
Four different types of TDC Duct Construction
Tables follow:
1, 4’ TDC with Autolok Stiffener, Zeebar or equiva-
lent reinforcement.
2. 5’ TDC with Autolok Stiffener, Zeabar or equiva-
lent reinforcement.
3. 4’ TDC with tie rod reinforcement.
4. 8’ TDC with tie rod reinforcement.
The recommended construction method for each
type of intermediate and joint reinforcement is delin-
eated in the TOC Assembly Instruction Brochure
Autolok and Zeebar reinforcements were evaluated
for each duct side separately. When required on
four sides at 4” W.G. and up, the corners must be
tied. When required on two sides, they must be tied
with rods or angles at the ends for 4”, 6” and 10”
pressure classes:
The duct sheet gauges shown are in accordance
with galvanized steel industry standards.
Tests done at 8” and 10” W.G. have not been
included in these tables. Contact The Lockformer
Company for these results and construction
recommendations.
The following charts have been constructed in
accordance with results obtained from tests per-
formed as prescribed by SMACNA in section Vil of
the HVAC DUCT CONSTRUCTION STANDARDS
FIRST EDITION 1985. These charts are not
intended to refiect construction standards in con-
sideration of any other analysis or type of proprie-
tary duct construction system other than TDC.
The Lockformer Company has done extensive test-
ing to insure the validity of data contained in the fol
lowing tables. However, it is the responsibility of
the Contractor or Engineer to determine that proper
materials, manufacturing procedures and assembly
procedures are used to meet the requirements for a
given job. Accordingly, Lockformer shall not be lia~
ble for any damages either incidental or consequen-
tial arising out of the use of this information{ ft 4&-FOOT TEC (Finished length 44”) i
ae!
2 wa. /RECTANGULAR DUCT CONSTRUCTION
: :
stance | with Autolok or Zeebar Stiffeners
POS. OR REG.
ae 16GA 18GA 206A 226A 24GA 26 GA
7” TO 8” R KR x
| 3° TG 10” I
11" TO 12” _ |
a3" To 14" | : |
[se
jis’ Tors | _
ree To “Pry
| 19” To 20” | oy as |
21” TO 22” =
EF 23” TO 24” {
25" TO 26” ~ - _
27” TO 28” |
29” TO 30” te ||
31” TO 36”
37” TO 42”
43” TO 48”
49” TO 54”
55” TO 60” Tec
61” To 72” TDC TDC TDC
85” TO 96” ~ pee Pe ee
“Plus tie rods at 48” maximum spacing along joints and intermediates. Locate rod{s} at even dimensions of duct
width, on center, or (for multiple rods) spaced evenly across width of duct,a be oe
4
4
a
a
a
a
a
a
i
i
j
i
|
E 4 ip [____&-FOOT TBE (Finished length 44”)
| & we. RECTANGULAR DUCT CONS STRUCTION |
svanc_| with Autolok or Zeebar Sciffeners
POS, OR NEG. |
eel 16 GA 18 GA 20 GA 22 GA 24 GA 26 GA
7” TO 8” K R ft
9” TO 10”
11" TO 12”
13" TO 14”
15” TO 16"
17” TO 18”
19” TO 20”
21” TO 22”
23” TO 24”
25" TO 26”
27" TO 28”
29” TO 30”
31” TO 36”
37” TO 42”
43” TO 48”
49” TO 54”
55” TO 60”
61" TO 72” TDC TOC TDC
rstoe | ps ts | Ts
85” TO 96” pe qe. =
o7 aiue = Se Se
"Plus tie rods at 48” maximum spacing along joints and intermediates. Locate rodis} at even dimensions of duc:
width, on center, or (for multiple rods) spaced evenly across width of ciwe. / RECTANGULAR DUCT CONSTRUCTION
smanc_| with Autolok or Zeebar Stiffeners
POS. OR NEG.
I 4. FOOT TDC ( (Finished length 44") —
pa
; 7 —
uel 16GA 18GA
SIZE
| 7 T0 8"
9” TO 10” i '
| 114” To 12” {
13” To 14"
15” TO 16”
17" TO 18”
|_ 19” To 20"
21” TO 22”
23” TO 24” |
25” TO 26”
27” TO 28”
29” TO 30”
31” TO 36”
37” To 42”
43" To 48”
49” To 54”
55” TO 60”
61” To 72”
TDC #
73” To 84”
85” TO 96” —e
97” & UP
“Plus tie rods at 48” maximum spacing along joints and intermediates. Locate rodis) at even dimensions of duct
width, on center, or (for multiple rods) spaced evenly across width of duct.lp / 4-FOOT TBC (Finished length 44”)
\ rc
w wa. |RECTANGULAR DUCT CONSTRUCTION
swanc_| with Autolok or Zeebar Stiffeners
POS. OR NEG. |
pucT
SIZE
22GA 24GA 26 GA
7" TO 8”
9” TO 10”
11" To 12”
13” To 14”
|__15" To 16”
17” To 18”
19” TO 20” |
21” To 22”
23” TO 24”
25" TO 26” | |
27” TO 28”
29” TO 30”
op ee ll
31” TO 36”
=
ent
37” TO 42”
43” To 48”
49” To 54”
55” TO 60”
61" TO 72” 25 —t87
73” TO 84”
ToC *| TDC *
85” TO 96”
ee a |
=
J
8
4
3
5
TDC _*
97” & UP are
.
“Plus tie rods at 48” maximum spacing along joints and intermediates. Locate rod{s) at even dimensions of duct
width, on center, or (for multiple rods) spaced evenly across width of duct.ty | 4-FOOT TDC (Finished length 44”)
we. | RECTANGULAR DUCT CONSTRUCTION
staric with Autelok or Zeabar Stiffeners
POSITIVE
|
puch 16 GA 18 GA 20 GA | 22 GA 24 GA 26 GA
SIZE
ee uN
| 9” To 10”
11" TO 12” |
13° To 14" |
15” TO 16” |
17" T0 18" |
19” To 20”
21” TO 22”
23” TO 24”
25" TO 26”
27" To 28”
29" TO 30”
31” TO 36”
37” To 42"
43” TO 48” |
49” TO 54”
55” TO 60”
| 61” To 72"
73" To 84”
85” TO 96”
97” & UP || See
“Plus tie rods at 48” maximum spacing along joints and intermediates. Locate rod(s) at even dimensions of duct
width, on center, or (for multiple rods) spaced evenly across width of duct. Construction for negative pressure is
not given. Duct sizes tested at 4” W.G. negative pressure were satisfactory. Refer to SMACNA industrial duct con-
struction standards for actual construction methods.i! 4-FOOT TDC (Finished length 44”) _
POSITIVE
we, RECTANGULAR DUCT CONSTRUCTION
sraric with Autolek or Zeebar Stiffeners
puct
18GA 20 22GA 24GA
ee 16 GA 8 GA
26 GA
[pte | A K K A K
9” TO 10”
|} 41" To 12”
13” TO 14” | {
15" TO 16”
17” To 18”
19” TO 20”
21" TO 22”
23" TO 24”
25” TO 26”
27" To 28”
29” TO 30”
31” TO 36”
37" To 42"
43” To 48”
49" To 54”
55” TO 60”
61" TO 72”
73" TO 84”
85” TO 96”
97” & UP 1
LL 1S ss
“Plus tie rods at 48” maximum spacing along joints and intermediates. Locate rod{s) at even dimensions of duct
width, on center, or (for multiple rods) spaced evenly across width of duct. Construction for negative pressure is
not given. Duct sizes tested at 4” W.G. negative pressure were satisfactory. Refer to SMACNA industrial duct con-
struction standards for actual construction methods of 6” W.G. negative pressure duct,
9WAI" RECTANGULAR DUCT CONSTRUCTION
with Tie Rod Reinforcement.
STATIC
4-FOOT TDC (Finished length 44”)
POS. OR NEG.
JTR - Joint Tie Rod
CTR - Center Tie Rod
pucT
SIZE
16 GA
18 GA
20GA
22GA
24GA
26 GA
7" 70 8”
AK
K
t
9” TO 10”
11" TO 12”
15" TO 16”
17” To 18”
49" TO 20”
21” TO 22”
23" TO 24”
25" TO 26”
27” To 28”
29" TO 30”
|__|
| 31” To 36”
37" TO 42”
| 43” To 48”
49” TO 54”
| 55” TO 60”
Toc
61” TO 72”
Toc
Toc
Toc
73” TO 84”
CTR
CTR
cTR
| 85” TO 96”
CTR/JTR
CTR/JTR
CTRATR
97" & UP.
CTR/JTR
CTR/JTR
Tie rods at 48” maximum spacing along joints and intermeciates. Locate rod(s) at even dimensions of duct width,
on center, or (for multiple rods} spaced evenly across width of duct.Ht
BE (Finished length 44")
we,|R RECTANGULAR DUCT CONSTRUCTION.
rane with Tie Rod Reinforcement —_
POS. OR NEG. JTR - Joint Tie Rod CTR - Center Tie Rod
1 f T
Duct
ae 16GA 18 GA 20 GA 22GA
24GA
K
7” TO
K
26GA
kK
9” TO 10”
11" TO 12"
13” To 14”
15" TO 16”
17” To 18”
19" To 20’
21” TO 22”
23” TO 24”
25” TO 26"
27” TO 28”
29” TO'30"
31” TO 36”
37” TO 42”
43” TO 48”
TDC
49” TO 54”
cTR |
55” TO 60”
cTR
61” TO 72” Toc ToC Toc Toc
CTR/JTR
73" TO 84” cTR cTR cTR cTR
85" TO 96" | CTRMTR | CTRTR | CTR/JTR | CTR/JTR
97” & UP CTR/JTR | CTR/JTR | CTR/JTR | CTRTR
—
<<]
Tie rods at 48” maximum spacing along joints and intermediates. Locate rod(s) at even dimensions of duct width,
‘on center, or (for multiple rods) spaced evenly across width of duct,4 -FOOT TOC “TDG (Finished 2d length 44 44") anne
|) wo, RECTANGULAR DUCT CONSTRUCTION
| sane | _With Tie Rod Reinforcement —__
\POS. OR NEG. JTR - Joint Tie Rod CTR - Center Tie Rod
aaa 16 GA 18 GA 20GA 22 GA 24GA 26Ga |
™To8 | B RK # K K
| stow | | | P| a | i
| 11" To 12” : _ | ; | |
13" To 14a" | ft | 1 |
| 18" To 16” ol : jt! _|
17" To 18” |
| 19" To 20” fp ; | — |
2a TO 22" i L | i | | _ 1
23” To 24” | !
25” TO 21 | oa | ;
|_27" 10 28" Ty | i= Toc
| 29" 0 30” : | “cTR
svtose | | | a toc | cm
37 To42” | | cr cTR
a3" To 40” | i oe ctr ct
49" To 64” [re Toc err cra ctr
s6"T0.60” | TDC ctr cm “CTR cTR CTR/JTR
61" T0 72” cre cTR cra | ctayta | cTrista a
| 73” TO 8a” cTR cTR ctrytr | ctawta | >< | |
gs" to 96" | crrtR | cTRTR | cTRWTR | CTR/JTR
97” & UP crawTr | crasta | cTRTR ><
Tie rods at 48” maximum spacing along joints and intermediates. Locate rod(s) at even dimensions of duct width,
on center, or (for multiple rods} spaced evenly across width of duct
44-FOOT TBC (Finished length 44”)
RECTANGULAR DUCT CONSTRUCTION
grant with Tie Rod Reinforcement —_
a POS. OR NEG. JTR - Joint Tie Rod CTR - Center Tie Rod
: puer —] sean | wea | 20cm | 22aa | 2sca | acca
| eee ae vx rN R A A A
1H] 9” TO 10” |
11” TO 12” - a
| 13” TO 14” | |
EZ | 15” TO 16"
17” TO 18” | |
| 19” To 20” : |
| 21" To: 22”
J 23” 10 2a" | | | |
2] | 25” To er | Lo ae 7
27” TO 28” i TOC
a "29" To 30" a | 7 | cTA
: 31” To 36” : | Toe cTR
fil 37” T0 42" ; | ce | cmp cr |
a | 43” 10 48" | toe cTR cTR cm |
as" to 5a” | TDC | ye | ctr cTR cTR |
‘ig 55” TO 60” CTR cTR CTR cTR =| CTR/JTR {
61” To 72” cTR cTR CTR/JTR | CTR/JTR
a 73” TO 84” cTR cm CTR/JTR “CTRIUTR " a
85” TO 96” CTR/JTR | CTR/JTR CTR/ITR - = |
M [oraur | omor | era [>< ia
‘8 Tie rods at 48” maximum spacing along joints and intermediates. Locate rod{s) at even dimensions of duct width
- on center, or (for multiple rods) spaced evenly across width of duct.Al / a 4-FOOT TDC (Finished length 4a) :
a TAT
d we. /RECTANGULAR DUCT CONSTRUCTION |
Aer with Tie Rod Reinforcement —_
POSITIVE JTR - Joint Rod CTR - Center Tie Rod
er 16GA 18 GA 20GA 22 GA 24GA 26 GA
me [FPR LRT RR
L _ [|
| sro 10 ; |
11" 70 12"
13” TO 14” i : _ if
15” TO 16” | | | 7 |
ToT | Tore TT te ia
S 19” TO 20” | ; : 7 7 : 7
21” TO 22" : _ |
23" TO 2a" : | | |
25” TO 26” | | |
27” TO 28” | | TDC
- 29” TO 30” " Toc cTR “|
31” TO 36” TDC cTR cTR
a7 TO 42” : cTR CTR CTR
43” TO 48” TDC Toc cTR | cTR —< |
49" TO bar : CTR CTR CTR cTR :
: 55” TO 60” TDC cTR CTR cTR CTR
61” To 72” cTR cTR etayste | ctRuTR | crRTR we
73” TO 84” CTR/JTR CTR/JTR CTR/JTR [ CTR/JTR
85" TO 96" CTR/JTR CTR/JTR CTR/JTR CTR/JTR |
97” & UP crasTR erate | 10> we.| RECTANGULAR DUCT CONSTRUCTION
erarig.| with Tie Rod Reinforcement
97" & UP CTRTR | CTR/JTR
A
POSITIVE JTR - Joint Tie Rod CTR - Center Tie Rod
all 16GA 18 GA 20GA 22GA 246A 26 GA
. 7” To 8” x x i
i 9” TO 10"
) 41" To 12" |
Reto |
rs] 15” To 16" | 7 i]
. 17” TO 18” |
il 19” TO 20” |
21” To 22”
EE 23” To 24” | toc |
a 25” 70 26" | [ | cTa |
. | 27" To 28" | | cTR
a 29” TO 30” | cTR -
i 31” To 36” Toc cTR -
El 37” TO 42” | Toe ctr cm |
43” To 48” Toc ctr ctr CTR/JTR
Murrow | we [em | em | oman | emore
fl 55” TO 60” cTR CTR CTR/JTR | CTR/JTR | CTR/JTR
61” 10 72” | cTRWTR | CTR/JTR | CTR/JTR |
z 73” 10 84” | cTRWTR | CTR/JTR | CTRJUTR —
85” To 96" | CTRIJTR | CTR/JTR | CTR/JTR <_<
i ie
4)
Tie rods at 48” maximum spacing along joints and intermediates. Locate rodis) at even dimensions of duct width,
‘on center, or (for multiple rods) spaced evenly across width of duct. Construction for negative pressure is not given.
Duct sizes tested at 4” W.G. negative pressure were satisfactory, Refer to SMACNA industrial duct construction
standards for actual construction methods of 6” W.G. negative pressure duct,
21Aa a aS iat
AUTOLOK
ER
TYPICAL CO
To install the TOC corner, tok hrst key
of comer under lane
‘Snap the second leg of TOC comer into
place on the Cuct hinge using Vise Grp
#9 Toggle Action Clsmps as shown
These comers may also be installed by
setting the duct up on its end so the
anges are flat against a floor, and then
lapping the comers into piers with &
hammer. The floor supports the flanges,
Preventing damage by this procedure.
(This Preparation is required on only one
‘8nd of each duct to be joinad)
Place a single tength of gasket along inner
‘edge of TOG flange along ail four sides of
‘one of the duct sections to be joined, Turn
gasket at corners as shown, The ends of
ihe tip of gasket must overlap by 4” at a
point about 8” away frain any bolt hole.
canmnae aor |
Place on prapared end, and ave bald end
ff Duct Sections together. align the borPOEMBLY SF
PpsEMBLY SEQUENCE
2
a? ‘snap together assembly, Once assembled, the
HAND CRIMPER,
2ostrion THis
Soe os
= POR 1a Ga. ony
Placa hand crimper jawis oVer'flange as shown,
Push movable arm until it hits stop.
INSIDE,
CORNER
Apply Sealant over the corner and lock joint as
shown. If a small Gap occurs at the end of the
Lock Joint besice the TDC fiange, adjust the
left and right TOC Notcher heads laterally so
the comer.notches they make are the same
size as the depth of the lock (as set on
Roliformer). This readjustment should eliminate
any such gaps and possible laakage,
MAXIMUM SPACE BETWEEN CLIPS
" W.G. OR Less
MORE THAN 3"ws.
The clamping TOC Clips are installed
with 6 wi
full coverage TOC Clip too!
L as shown. For recommended Clip spac-
ing, see Chart on back cover, box 4
—
When using TDC in conjunction with
siip-on four bolt Connectors, it may be
‘esirable to increase tension on TOC Clip.
To tighten the grip of the TDC Clip to the
flange by overbending the long leg of the
lip, use the forming end of the tool as
shown at fat
CAUTION: Use of a hammer for installa
| tion will damage Clip and may cause
leakage,
NOTE: 12” x 1%" x 10 Ga. splice strip.
Snap a 12” x 1%" x 10 Ga. splice strip into the
TDC flange from the back, centering the strip.
over the splice,Duet Reinforcement Options:
if the TDC ADDENDUM TO-THE 1985 SMAGHA HVAC
DUCT CONSTRUCTION STANDARDS requires duct rein
forcement, reinforcement OPTIONS 1-7 should be used
For alternate methods, refer to SMACNA HVAC DUCT
CONSTRUCTION STANDARDS, FIRST EDITION, 1985.
NOTES:
‘A 56" long duct section is used as an exampie for these
(OPTIONS.
Where the “AUTOLOK" fastening process is referred to in
the following text, itis also acceptable to use any other
SMACNA approved fastening process.
OPTION HEADINGS:
CTR ~ Center Tie Rod
STR = Joint Tie Rod
48 ~ 1 Autolok or Zesbar Stiftener
28, Multiple Autolok or Zeebar Stiffeners
For tie rod OPTIONS, use 1%” min. diameter tie rod for duct
6" wide or less; Use 36” diameter rod for duct wider than
3
Hollow Conduit may also be used in pince of threaded rod
(soe back cover, Dox 3).
Rod spacing must be no more than 48" apart. One tis rod
for duct 96” wide or less,
Multiple tie rods on duct over 96" wide (see back cover,
boxes 1 and 2).
Center Tie Rod ~ Ori through top and bottom
at the exact center of duct section. Set inside tut
and washers on rod to match depth of duct. Insert
tie rod through open end of duct into drilled hol
Fasten outside nuts and washers down tight.
1s
Single Zeebar - Autolok one Zeebar on top and
bottom panel of duct section, contored between.
TDC flanges.
2s
Multiple Zeebars - Autolok 2 Zeebars on top
bottom panel of duct section. Set each Zeebar
section length away trom TOC flange.
nd
%4 ofWENT OPTIONS
a CTR/JTR
Lo
Muttipe Tie Rods ~ Drill through top and bottom
Panel, 1” from TOG flange on exact centerline of
duct width. Then follow instructions given on page
30, box 1
25s
,
4
i
]
j
i
i
>
Is CTR /JTR
Tie Rod/Zeebar ~ Autolok one Zeebar on top and
bottom panel of duct section, centered betwen TOC
flanges. Then follow instructions given in box at left.
1S WITH TIE RODS 4” SP AND UP
Needed) "ee TOC ADDENDUM TO 1965 SMACNA
FAYAC BUcT CONSTRUCTION STANDARDS to
J cere nan se oct od
Make,2 Zeebars 3” longer than duct width and
Bunch holes 1” from each end. Autolok one Zeebar
‘on top and bottom panel of duct section, centered
between TOC flanges; leave 114” hanging out beyond
edges of panel
‘After assembling panels, insert tie rods through end
i holes in Zeobar and fasten with nuts and washers.
7
1S WITH ZEEBAR 4" SP AND UP
Zeebar Four Sides (if side reinforcement is needed)
= Make 2 Zeebars 3” wider than duct width and 2
Zeobars 3” higher than duct height.
Autolok a long Zeebar on top panel of duct section,
cantarad between TDC flanges; leave 144" hanging
‘out beyond edges of panel. Then Autolok one short
Zeebar on side panel so its flat face will mate to
tong Zeebar and 1¥2" will hang out beyond edges of
panel, Repeat this procedure for remaining panels.
After assembling panels, tie in comers with nut and
bolt, or other SMACNA-approved fastening method.MULTIPLE TIE RODS
Multiple Tie Rds ~ Orit through wp and
bottom panal, 1” from TDG flanges, on vor
fect centers across duct width. Then dei!
through top and bottom panel, centered
between TOC flanges, on correct centers
‘across duct width,
CONDUIT TI
ROD
8/8-16 x I" HEX: HEAD BOLT
(Set in seatant)
Drill 7/6 dia, hole into
duct wall
3/8 -16 NUT
(Spot weld or
‘rimp into conduit)
W2* THINWALL
3 ‘conDUIT
ct le
max,
(GEKFORMER
The Lockformer Company
711 Ogden Ave,
Lisle, Illinois 60532
Phone (708) 964-8000
FAX (708) 964-5685
RECOMMENDED CLIP spacing
5489 Sixth Street, sw.
edar Rapids, lowa 52404
Phone: (319) 364-9187 Q
Telex: 484409
FAX (319) 364-3436
Subsidiary Chena Bictt