Professional Documents
Culture Documents
1 RAB Masjid Safinatul Islam 2021
1 RAB Masjid Safinatul Islam 2021
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan dan Perataan : 23.00 m x 20.00 m = 460.00 m2 460.00 m2
2 Pemasangan Bowplank 23.00 m + 23.00 m + 20.00 m + 20.00 m = 86.00 m1 86.00 m1
Tulangan 2,564.30 kg
D 16 mm Berat = 1.579 kg/m
1.92 m x 2.00 = 3.84 m
0.17 m x 2.00 = 0.34 m
0.10 m x 2.00 = 0.20 m
= 4.38 m x 6.00 bh x 56.00 bh = 1,471.68 m1
0.52 m x 1.00 = 0.52 m
0.32 m x 2.00 = 0.64 m
0.10 m x 2.00 = 0.20 m
= 1.36 m x 2.00 bh x 56.00 bh = 152.32 m1
= 1,624.00 m1
Bekisting 132.16 m2
2.00 m x 0.25 m x 4.00 bh x 56.00 bh = 112.00 m2
0.60 m 0.15 m x 4.00 bh x 56.00 bh = 20.16 m2
= 132.16 m2
Tulangan 2,613.05 kg
D 16 mm Berat = 1.579 kg/m
1.99 m x 1.00 = 1.99 m
0.30 m x 1.00 = 0.30 m
= 2.29 m x 12.00 bh x 56.00 bh = 1,538.88 m1
1,538.88 m1 x 1.579 kg/m = 2,429.89 kg
8 mm Berat = 0.395 kg/m
0.32 m x 4.00 = 1.28 m
0.05 m x 2.00 = 0.10 m