You are on page 1of 23

All India Council for Technical Education

(An Autonomous Organization, Under Ministry of HRD, Govt. of India)


Nelson Mandela Marg,Vasant Kunj, New Delhi-110067 Website: https://www.aicte-india.org

APPROVAL PROCESS 2020-21


INSTITUTION DETAILS (Information Uploaded by Institute for Approval 2020-21)

INSTITUTION DETAILS: BASIC DETAILS


Current Application 1-7006598050 Application Type Extension-Expansion-Closure
Number

Current Status EOA Recommended by Council Sub Status NA

Permanent 1-5377191 Academic Year 2020-2021


Institution ID

Application 29/02/2020 Attend Scrutiny NA


Submitted Date Committee Date

Appeal Requested NA Reopened NA


Date Application Date

Overall Deficiency No

INSTITUTION DETAILS: MORE INFORMATION


Name of Institution BISHOP JEROME INSTITUTE Address of Fatima College Road, Kollam -
Institution 691001
State/ UT Kerala District Kollam
Town/ City/ Village Kollam AICTE Region South-West
PIN 691001 Women's Institution No
Institution Type Private-Self Financing Any Self- Financed Yes
Course
Percentage Grant 0 Are you an No
Received from Institution for PWD
Government Students
Minority Institution Yes Type of Minority Religious
Minority Name, if Christian Year of LOA 2010
Linguistic
ORGANIZATION
Name of the Parent Organization BISHOP JEROME FOUNDATION Type of the Organization Trust
(Trust/ Society/ Company) (Trust/ Society/ Company
Registered With Sub Registrar, Eravipuram, Registration Date 10/02/2010
Kollam
Registration Number 27/010/IV Organization Address Bishop'S House

State/UT Kerala District Kollam

Town / City / Village Tangasseri, PIN 691007

Organization Website

PRINCIPAL / DIRECTOR
PERSONAL DETAILS
Surname/Family name Dr First Name D.Roshan Kumar
Father's Name Damodaran N Mother's Name Vimala B
EDUCATIONAL DETAILS
Doctorate Degree Yes Master's Degree M TECH
Bachelor's Degree B Sc (Engg) Other Qualifications NA
International Certification (If 0 Field of Specialization Manufacturing
Any) Engineering
DETAILS RELATED TO PROFFESSION
Date of joining the Institution 01/06/2016 Appointment Type Regular
Exact Designation Principal
WORK EXPERIENCE DETAILS
Teaching Experience (Years) 35 Research Experience (Years) 3

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 1 of 23
Industry Experience (Years) 0
OTHER DETAILS
Research Projects Guided - UG 30 Research Projects Guided - 1
PG
Research Projects Guided - 1 Number of Books Published 0
PhD
Papers Published - National 6 Papers Published - 5
International

FACULTY NORMS AND PAY SCALE


Are all Approved teaching Faculty Members being paid as per present AICTE pay scale? Yes
Are all the teaching Faculty Members, as per AICTE/UGC Norms? Yes
List of Faculty Members and data uploaded on the institution's web portal. Yes

INFRASTRUCTURE DETAILS
LAND DETAILS
Location: Rural Land in Hilly Area: No
Total Area in Acres: 12.82 FSI: NA
Built Up Area (Sqm): NA Number of Pieces: 1
Land Piece Area 1 in 12.82 Land Piece Area 2 in NA
Acres: Acres:
Land Piece Area 3 in NA Max distance in farthest NA
Acres: land pieces (Km):
Land registered with: Sub Registrar, Eravipuram, Date of Registration: 18/02/2010
Kollam
Land use certificate SUB REGISTRAR, Land use certificate 07/03/2010
issued by: ERAVIPURAM, KOLLAM issued Date:
Ownership Details: Other Is the Land Mortgaged: No
Mortgaged Purpose: N
Land (North/South): North Latitude Degree: 8
Latitude Minute: 8 Latitude Second: 53
Longitude (East/West) East Longitude Degree: 76
Longitude Minute: 16 Longitude Second: 36

LAND DETAILS: MORE INFORMATION

Sr. Land Registration 12 Date of Registration: 18/02/2010


No. Number:
1 Area of Land in 12.82 Khasra Number: 01
Acre:
Plot Number/ 1 Land Situated At: Eravipuram
Survey Number:
Land Registered in Manager Ownership or Owener ship
the Name of: Government Lease:
Land use No Land Use Certificate Na
Certificate Issued Issuing Authority:

BUILDING DETAILS
Building Status: Available Total built up Area 21216
(ready) Sqm:
Activities in the building 0 Whether Access Yes
other than courses &Circulation Area and
approved by AICTE: Toilet Area are
maintained as per
National Building Code
(NBC) Norms?
Total Carpet Instructional 16472 Total Carpet 867
Area (ready) -Sqm: Administrative Area
(ready) -Sqm:
Access and Circulation 544 Total built up Area -Sqm 56936
Area (Sqm): Planned:
Total Carpet Amenities 3690
Area (ready) -Sqm:

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 2 of 23
BUILDING DETAILS: MORE INFORMATION

Data not entered by Institution


LABORATORY DETAILS

Sr. Programme: ARCHITECTURE AND Department: Architecture


No. PLANNING
1 Course: ARCHITECTURE Level: Under Graduate
Name of the Architecture Is it Research lab for PG No
Laboratory: Course(Y/N):
Major Equipments: Computer Building Name NA
Printer
Copier
Scaner
Lcd Projector
Audio System
Language Lab
Building Number NA
Sr. Programme: ENGINEERING AND Department: Civil Engineering
No. TECHNOLOGY
2 Course: CIVIL ENGINEERING Level: Under Graduate
Name of the Civil Is it Research lab for PG No
Laboratory: Course(Y/N):
Major Equipments: Computer Building Name NA
Printer
Copier
Scaner
Lcd Projector
Audio System
Language Lab
Building Number NA
Sr. Programme: ENGINEERING AND Department: Electrical Engineering
No. TECHNOLOGY
3 Course: ELECTRICAL ENGINEERING Level: Under Graduate
Name of the Electrical Is it Research lab for PG No
Laboratory: Course(Y/N):
Major Equipments: Computer Building Name NA
Cro
Power Supply
Lcd Projector
Audio System
Dc/Ac Generators
High Voltage -Equipments
Building Number NA
Sr. Programme: ENGINEERING AND Department: Electronics Engineering
No. TECHNOLOGY
4 Course: ELECTRONICS Level: Under Graduate
Name of the Electronics Is it Research lab for PG No
Laboratory: Course(Y/N):
Major Equipments: Computer Building Name NA
Lcd Projector
Audio System
Language Lab
Cro
Power Supply
Function -Generator
Mw Devices
Building Number NA
Sr. Programme: MANAGEMENT Department: Business Management
No.
5 Course: BUSINESS MANAGEMENT Level: Post Graduate
Name of the Management Is it Research lab for PG No
Laboratory: Course(Y/N):
Major Equipments: Computer Building Name NA
Printer
Copier
Scaner
Lcd Projector

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 3 of 23
Audio System
Language Lab
Building Number NA
Sr. Programme: ENGINEERING AND Department: Mechanical Engineering
No. TECHNOLOGY
6 Course: MECHANICAL ENGINEERING Level: Under Graduate
Name of the Mechanical Is it Research lab for PG No
Laboratory: Course(Y/N):
Major Equipments: Computer Building Name NA
Printer
Copier
Scaner
Lcd Projector
Audio System
Language Lab
Building Number NA

ADMINISTRATIVE AREA

Sr. Room ID/ Name: B1AF51 Room Type: Cabin for Head of Dept
No.
1 Area in Sqm: 15 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF29 Room Type: Principal Directors Office
No.
2 Area in Sqm: 47 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF37 Room Type: Cabin for Head of Dept
No.
3 Area in Sqm: 15 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF38 Room Type: Cabin for Head of Dept
No.
4 Area in Sqm: 15 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF39 Room Type: Cabin for Head of Dept
No.
5 Area in Sqm: 15 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF40 Room Type: Cabin for Head of Dept

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 4 of 23
No.
6 Area in Sqm: 15 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF41 Room Type: Cabin for Head of Dept
No.
7 Area in Sqm: 15 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF42 Room Type: Faculty Room
No.
8 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF43 Room Type: Faculty Room
No.
9 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF46 Room Type: Faculty Room
No.
10 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF47 Room Type: Faculty Room
No.
11 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF48 Room Type: Faculty Room
No.
12 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF49 Room Type: Faculty Room
No.

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 5 of 23
13 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF50 Room Type: Faculty Room
No.
14 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF51 Room Type: Faculty Room
No.
15 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF52 Room Type: Faculty Room
No.
16 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF53 Room Type: Faculty Room
No.
17 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF54 Room Type: Faculty Room
No.
18 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF55 Room Type: Faculty Room
No.
19 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF56 Room Type: Faculty Room
No.
20 Area in Sqm: 5 Building Name: Na

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 6 of 23
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF57 Room Type: Faculty Room
No.
21 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF58 Room Type: Faculty Room
No.
22 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF59 Room Type: Faculty Room
No.
23 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF60 Room Type: Faculty Room
No.
24 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF30 Room Type: Board Room
No.
25 Area in Sqm: 20 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF31 Room Type: Office All Inclusive
No.
26 Area in Sqm: 310 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF32 Room Type: Department Office
No.
27 Area in Sqm: 30 Building Name: Na
Building Number: NA Readiness of Flooring Ready

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 7 of 23
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF33 Room Type: Department Office
No.
28 Area in Sqm: 30 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF34 Room Type: Department Office
No.
29 Area in Sqm: 30 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF35 Room Type: Department Office
No.
30 Area in Sqm: 30 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF36 Room Type: Department Office
No.
31 Area in Sqm: 40 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF44 Room Type: Faculty Room
No.
32 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF45 Room Type: Faculty Room
No.
33 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF61 Room Type: Faculty Room
No.
34 Area in Sqm: 5 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 8 of 23
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF62 Room Type: Central Store
No.
35 Area in Sqm: 30 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF63 Room Type: Maintenance
No.
36 Area in Sqm: 10 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF64 Room Type: Security
No.
37 Area in Sqm: 10 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF65 Room Type: Housekeeping
No.
38 Area in Sqm: 10 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF66 Room Type: Pantry for Staff
No.
39 Area in Sqm: 10 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF67 Room Type: Exam Control Office
No.
40 Area in Sqm: 50 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1GF68 Room Type: Placement Office
No.
41 Area in Sqm: 55 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 9 of 23
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1MF50 Room Type: Cabin for Head of Dept
No.
42 Area in Sqm: 15 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1SF53 Room Type: Faculty Room
No.
43 Area in Sqm: 250 Building Name: Na
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures

AMENITIES AREA

Sr. Room ID/ Name: B1FF69 Room Type: Toilet


No.
1 Area in Sqm: 360 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF70 Room Type: Auditorium
No.
2 Area in Sqm: 1026 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Available Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF71 Room Type: Cafeteria
No.
3 Area in Sqm: 170 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF72 Room Type: Stationery Store
No.
4 Area in Sqm: 20 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF73 Room Type: First aid cum Sick Room
No.
5 Area in Sqm: 15 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 10 of 23
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF74 Room Type: Guest House
No.
6 Area in Sqm: 30 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF75 Room Type: Boys Common Room
No.
7 Area in Sqm: 120 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF76 Room Type: Girls Common Room
No.
8 Area in Sqm: 120 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: B1FF77 Room Type: Sports Club
No.
9 Area in Sqm: 200 Building Name: NA
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures
Sr. Room ID/ Name: BIFF78 Room Type: Others
No.
10 Area in Sqm: 150 Building Name: Admin. Block
Building Number: NA Readiness of Flooring Ready
Readiness of Wall Ready Readiness of Ready
and Painting Electrification and
Lighting
Air Conditioning Planned Readiness of Ready
furniture/fixtures

CIRCULATION AREA

Sr. Area Type Corridors Average Carpet Area: 856


No.
1 Flooring Yes Painting Done Ready
Electrification Ready Building Name: NA
and Lighting
Building NA
Number:
Sr. Area Type Other Areas (in Sq m) Average Carpet Area: 956
No.
2 Flooring Yes Painting Done Ready
Electrification Ready Building Name: NA
and Lighting
Building NA
Number:

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 11 of 23
Sr. Area Type Other Common Area (in Sq m) Average Carpet Area: 712
No.
3 Flooring Yes Painting Done Ready
Electrification Ready Building Name: NA
and Lighting
Building NA
Number:

INSTRUCTIONAL AREA

Sr. Programme ENGINEERING AND Level UNDER GRADUATE


No. TECHNOLOGY
1 Room Type Classroom Room ID/ Name 101ABC
Area of Room in 268 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
2 Room Type Classroom Room ID/ Name 101DEF
Area of Room in 268 Building Name academic block
Sqm
Building Number A3/2012 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
3 Room Type Tutorial Room Room ID/ Name 105
Area of Room in 67 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
4 Room Type Tutorial Room Room ID/ Name 201 A
Area of Room in 68 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
5 Room Type Classroom Room ID/ Name 201ABC
Area of Room in 350 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 12 of 23
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
6 Room Type Tutorial Room Room ID/ Name 201B
Area of Room in 68 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
7 Room Type Tutorial Room Room ID/ Name 201C
Area of Room in 68 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
8 Room Type Classroom Room ID/ Name 201EDF
Area of Room in 268 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
9 Room Type Computer Laboratory Room ID/ Name 202G
Area of Room in 75 Building Name management block
Sqm
Building Number a2/2012 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
10 Room Type Workshop Room ID/ Name 207
Area of Room in 286 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
11 Room Type Laboratory Room ID/ Name 2WABCD
Area of Room in 1600 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 13 of 23
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
12 Room Type Seminar Hall Room ID/ Name 301
Area of Room in 189 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
13 Room Type Seminar Hall Room ID/ Name 301B
Area of Room in 174 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
14 Room Type Seminar Hall Room ID/ Name 301C
Area of Room in 145 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
15 Room Type Seminar Hall Room ID/ Name 301D
Area of Room in 126 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
16 Room Type Laboratory Room ID/ Name 302
Area of Room in 969 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
17 Room Type Art Court Room ID/ Name 302 C
Area of Room in 122 Building Name architecture block
Sqm
Building Number A1 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 14 of 23
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
18 Room Type Multi-Purpose Hall Room ID/ Name 302A
Area of Room in 161 Building Name architecture block
Sqm
Building Number A1 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
19 Room Type Laboratory Room ID/ Name 302C
Area of Room in 969 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
20 Room Type Laboratory Room ID/ Name 302D
Area of Room in 969 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
21 Room Type Workshop Room ID/ Name 303
Area of Room in 286 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Not Available
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
22 Room Type Studio Room ID/ Name 303 F
Area of Room in 375 Building Name architecture block
Sqm
Building Number A1 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
23 Room Type Computer Laboratory Room ID/ Name 303A
Area of Room in 72 Building Name architecture block
Sqm
Building Number A1 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 15 of 23
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
24 Room Type Resource Centre Room ID/ Name 303B
Area of Room in 105 Building Name architecture block
Sqm
Building Number A1 Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
25 Room Type Classroom Room ID/ Name 304
Area of Room in 98 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
26 Room Type Classroom Room ID/ Name 305
Area of Room in 92 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
27 Room Type Laboratory Room ID/ Name 308
Area of Room in 969 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
28 Room Type Guest Room Room ID/ Name 400
Area of Room in 50 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
29 Room Type Tutorial Room Room ID/ Name 401 C
Area of Room in 94 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 16 of 23
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
30 Room Type Classroom Room ID/ Name 401A B
Area of Room in 214 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Available
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
31 Room Type Classroom Room ID/ Name 401AB
Area of Room in 140 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme MANAGEMENT Level POST GRADUATE
No.
32 Room Type Seminar Hall Room ID/ Name 402
Area of Room in 134 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Available
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
33 Room Type Drawing Hall Room ID/ Name 408
Area of Room in 135 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
34 Room Type Seminar Hall Room ID/ Name 501
Area of Room in 134 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
35 Room Type Classroom Room ID/ Name 501AB
Area of Room in 140 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 17 of 23
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
36 Room Type Classroom Room ID/ Name L1,2,3
Area of Room in 208 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
37 Room Type Laboratory Room ID/ Name LA 1
Area of Room in 600 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
38 Room Type Seminar Hall Room ID/ Name S ABCD
Area of Room in 1000 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
39 Room Type Studio / Material Museum Room ID/ Name S1,2,3
Area of Room in 680 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
40 Room Type Seminar Hall Room ID/ Name SH 1
Area of Room in 189 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
41 Room Type Tutorial Room Room ID/ Name T1,2,3
Area of Room in 135 Building Name NA
Sqm

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 18 of 23
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ENGINEERING AND Level UNDER GRADUATE
No. TECHNOLOGY
42 Room Type Additional Workshop Room ID/ Name W301
Area of Room in 800 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
43 Room Type Classroom Room ID/ Name WB 201
Area of Room in 67 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Sr. Programme ARCHITECTURE AND Level UNDER GRADUATE
No. PLANNING
44 Room Type Studio / Material Museum Room ID/ Name WB302
Area of Room in 270 Building Name NA
Sqm
Building Number NA Readiness of Flooring Ready
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures

INSTRUCTIONAL AREA – COMMON FACILITIES

Sr. Room Type: Language Laboratory Room ID/ Name: L LAB


No.
1 Area of Room in 400 Readiness of Flooring: Ready
Sqm:
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Planned
furniture/fixtures
Building Name NA Building Number: NA
Sr. Room Type: Computer Center Room ID/ Name: LAB
No.
2 Area of Room in 190 Readiness of Flooring: Ready
Sqm:
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Available
furniture/fixtures
Building Name NA Building Number: NA
Sr. Room Type: Library&Reading Room Room ID/ Name: LIB
No.
3 Area of Room in 410 Readiness of Flooring: Ready

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 19 of 23
Sqm:
Readiness of Ready Readiness of Ready
Wall and Electrification and
Painting Lighting
Readiness of Ready Air Conditioning Available
furniture/fixtures
Building Name NA Building Number: NA

HOSTEL FACILITIES

Sr. Whether Hostel Yes Girl's Hostel (Y/N): Yes


No. facility
Available(Y/N) ?
1 No. of Rooms: 20 Hostel Capacity: 80
Boy's Hostel: Y No. of Rooms for Boys? 25
Total Capacity: 100 Apply for Site Change No
Location Outside the Campus Hostel Facility Y

COMPUTATIONAL FACILITIES

PCs/Laptop exclusively 290 PCs/Laptop available in 20


available to students: Library:
PCs/Laptop available in 7 PCs/Laptop available to 22
Administrative Office: Faculty Members:
Number of PCs/Laptop in 20 Internet Bandwidth in 48
language lab: Mbps:
Number of Legal 45 Printers available to 29
Application software: student:
Number of A1 Size Color 1 Number of Legal System 10
Printers: software:
Number of Open Source 2 Number of Proprietary NA
Software

SOLAR PANEL INSTALLATION DETAILS


Total land available 48562.3 No. of buildings with roof 3
(Sqm): tops:
Land available for placing 1000 Annual electricity 225000
solar photovoltaic panels consumption No. of units
(Sqm): during 2018-19:
Total approximate roof- 1000 Average rate per unit 8
top area available for paid during 2018-19 (Rs. /
placing solar unit):
photovoltaic panel (Sqm):
Renewable Energy Type NA Remarks: NA
Whether a policy has Y Renewable Energy used
been adopted to use only at present (if any):
LED lamps:

OMBUDSMAN & ANTI-RAGGING


ANTI-RAGGING
S.No. Particulars Status
1. Constitution of Anti-Ragging Committee (will be set automatically after Yes
adding Anti-Ragging Committee details ):
2. Constitution of Anti-Ragging Squad (will be set automatically after adding Yes
Anti-Ragging Squad details)
3. Affidavit obtained from all Students: Yes
4. Affidavit obtained from parents of all the students: Yes
5. Affidavit obtained from students staying in Hostel: Yes
6. Affidavit obtained from parents of students staying in Hostel: Yes
7. Appointment of Counselors: Yes

ANTI-RAGGING COMMITTEE DETAILS

Sr. Committee Type: Anti-Ragging Committee Appointment Order BJI/ORD/055/2020


No. Reference Number:
1 Date of Appointment: 24/02/2020 Name of the Mr. Abhishek P
Committee Member:

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 20 of 23
Profession: Asst. Professor Associated With: College
Sr. Committee Type: Anti-Ragging Squad Appointment Order BJI/ORD/056/2020
No. Reference Number:
2 Date of Appointment: 24/02/2020 Name of the Praveen K C
Committee Member:
Profession: Asst. Professor Associated With: College

LIBRARY & FACILITIES

LIBRARY BOOKS

Sr. Programme MANAGEMENT Number of Tiles 1900


No.

1 Number of Volumes 3750 Number of Journals 9


published in India
Number of Journals 2 Number of eBook 0
published at Abroad Volumes-UG
Number of eBook 2673 Number of eBook 0
Volumes-PG Volumes-Diploma
Number of eBook 0 Number of eBook 292
Titles-UG Titles-PG
Number of eBook 0
Titles-Diploma
Sr. Programme ARCHITECTURE AND PLANNING Number of Tiles 1115
No.

2 Number of Volumes 5212 Number of Journals 13


published in India
Number of Journals 5 Number of eBook 150
published at Abroad Volumes-UG
Number of eBook 0 Number of eBook 0
Volumes-PG Volumes-Diploma
Number of eBook 32 Number of eBook 0
Titles-UG Titles-PG
Number of eBook 0
Titles-Diploma
Sr. Programme ENGINEERING AND Number of Tiles 5212
No. TECHNOLOGY

3 Number of Volumes 14512 Number of Journals 34


published in India
Number of Journals 14 Number of eBook 212
published at Abroad Volumes-UG
Number of eBook 0 Number of eBook 0
Volumes-PG Volumes-Diploma
Number of eBook 55 Number of eBook 0
Titles-UG Titles-PG
Number of eBook 0
Titles-Diploma

LIBRARY FACILITIES

Sr. Working hours from 08.00am - 05.30pm Reprographic Yes


No. to Facility
1 Current Annual 655552 Bar Code or RF Tab Yes
Budget Rs. Book handling
Reading Room 170 Library Networking yes
Seating Capacity
Name of E Journal PURCHASE ORDER Library Management Yes
Subscription Software
available
Number of 20 Total Library Area in 510
Multimedia PCs Sqm
OTHER FACILITIES I
Particulars Status Particulars Status Particulars Status

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 21 of 23
Potable Water Yes Backup Electric Supply Yes CCTV Security Yes
Supply
Barrier free Yes Institution Web Site Yes Insurance for Yes
Environment Students

General Insurance Yes All Weather Approach Yes Fire and Safety Yes
(Motorized Road) Certificate

Post & Yes Projectors in Classrooms Yes Medical & Yes


Banking/ATM Counselling

Staff Quarters Yes Public Announcement System Yes Group Insurance Yes
for Employees
Electrical Grid Yes Telecom & FAX Yes Safety Provisions Yes
Power Supply
Connection
Rain Water Yes ERP Software Yes Transport Facility Yes
Harvesting

First Aid Yes Sewage Disposal System Yes Appointment of Yes


Student
Counselor

Sports Facilities Yes Innovation Cell/Club Yes Participation in Yes


the National
Innovation
Ranking
Establishment of Yes Vehicle Parking Yes Establishment of Yes
Committee For Anti Ragging
SC/ST Committee
Implementation of Yes Auditorium Yes Implementation Yes
examination of teacher
reforms training policy
Institution- Yes Media Cell No At least 5 MoUs Yes
Industry Cell with Industries
Intellectual Yes Implementation of Startup Yes Internal Quality Yes
Property of Right Policy Assurance Cell
Cell
Implementing Yes Applied for Yes Group Accident Yes
Food Safety and Membership of National Digital Policy to be
Standard Library provided by
Act,2006in the Employees
Institution
Participation in No Establishment of Online Yes General Notice Yes
the Grievance Rederssal Board and
National Mechanism Departmental
Institutional Notice Board
Ranking
Framework (NIRF)
Provision to watch Yes Implementation of Yes Establishment of Yes
MOOCS Courses the schemes announced by Internal
through Government of India Complaint
Swayam Committee (ICC)
Committee
Offering of Skill Yes Implementation of mandatory Yes Installation of Yes
Development internship policy for Students Grid Connected
Courses Approved Solar
by the Council Rooftops/Power
Systems
Compliance of the Yes Implementation of Unnat Bharat Yes Digital Payment Yes
National Academic Abhiyan/ Saansad Adarsh Gram for all Financial
Depository (NAD) Yojana (SAGY) Transactions
as per MHRD as per MHRD
Directives Directives

Whether the Yes Fabrication Facility Laboratory No In the Yes


Institution has (FABLAB) Tinkering classrooms
implemented Laboratory/ Innovation available, at least
Safety and Laboratory ONE shall be a

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 22 of 23
Security measures smart Classroom
in the Campus? per Department
Whether your Yes Efforts to encourage Final Year Yes
Institution has students to appear for GATE
introduced online Examination
Aadhar linked
Biometric
attendance for
regular faculty
members?

OTHER FACILITIES II
Sr. No. Particulars Status
Copies of AICTE Approvals (LOA and EOA of subsequent years) obtained since Inception Yes
1.
of Institution till date shall be placed in the Website of the Institution
Display Board within the premises as well as in the Website of the Institution Indicating the Yes
2.
Feedback Facility of Students and Faculty Members Available in the AICTE Web Portal
Establishment of Grievance Redressal Committee in the Institution and Appointment of Yes
3.
OMBUDSMAN by the University
Display of Course(s) and "Approved Intake" in the Institution at the entrance of the Yes
4. Institution. Course(s) taken through duly recognized MOOCs shall be used as
Supplementary Course(s)
Availability of quality sanitary napkins through sanitary napkin vending machines and Yes
5.
ensuring safe and environment friendly disposal of used sanitary napkin
Display of information submitted to AICTE (including the accreditation status and Board of Yes
6.
Governors) along with mandatory disclosures in the Web site of the Institution

OTHER FACILITIES III


Sr. No. Particulars Status
1. Whether mandatory disclosure is uploaded in Institution's website? Yes
Whether the Institution following ICAI (Institute of Chartered Accountants of India)
2. Yes
Accounting Formats?
Fees to be charged, Reservation policy, Admission policy and Document retention policy
3. Yes
are duly approved by State Govt?
Fees to be charged, Reservation policy, Admission policy and Document retention policy
4. Yes
are duly approved by Affiliating University?
Fees to be charged, Reservation policy, Admission policy and Document retention policy
5. Yes
are uploaded in Institution's Website?
6. Courses/Approved Intake displayed at the entrance of the Institution? Yes
7. Is the Cafeteria shared among other institution? No
8. Is Library and Reading Room shared among other institution? No
9. Is the Computer Centre shared among other institution? No
10. Whether Institution is operating from Permanent Site/Temporary Site? Permanent Site

INCOME & EXPENDITURE DETAILS


INCOME
0 Income from State 0
Income from Central Govt:
Government:
81468083 Income from Donations: 400000
Income from Student Fees:
Income from UGC: 0 Income from Other Bodies: 0
Total Income: 81868083
EXPENDITURE
Salary Teaching Staff: 43428966 Salary Non-Teaching Staff: 4922435
Library: 241128 Equipment: 726931
Building Maintenance: 1127157 Other Expenditure: 44253667
Total Expenditure: 94700284

Date of Signature(dd/mm/yyyy) Seal of Institution Name & Signature of Director/Principal

1-7006598050 Page 23 of 23

You might also like