4365 Tos

You might also like

You are on page 1of 6
Examination Seat No.:- 4365 © Pesign a one way slab simply supported slab for the requ iremen fs - Span= 3.5m Live Load = kN [69.19 Floor Finish = USKN/sq.m 250mm Mick MZ6, Fe 41S C2) Colevlation of effect ve depth 2 spon Step 4 Design constont Pa . d 0.00388 Fe 250 OAD fick bd 0.63 > Fe 15 0-199 gckbd? 0-48 d 0.0048 rem OO 0.133 f¢ckbs~ 0-46 4d 0-0040 Efrective depth % effective =pan calculation Step 2 € d= shorter spon Con Me Ces clean cover Ms mosification Qackor Cconstan) 3500 20x1.S 116.667 mm Overald. depth = (D> “Ye d+ diafy + Ce 2 6.667% 6+ 20 142.667 150 mae Step 3 Effective span (Le) a k> urd = ssO+NCG7? = S Py de dee. ssoo e230 = | ‘Scanned wih CamScanner of Soad a bending Load Calculations, Self Wagnb = LXBXB x conc. density Sone. density = 26 Coonstank = 1x140.18% 25 = BAS kN Im® bY Live Joad = AKN fcr ©) Floor Yinish 2 Lok Total dod = CSAS aes) WE = 9.28 KN/in? Wd = V20K 1S = PREBIT 15. 275 kN Bending momen’ calevlebions Me lodx ge é ‘3-815 x (2. e1g67)” a 22.6861 x 19° u Noam Equate Mes bay Mae Mu Limit 212686107 = 0.133 feck bd> 22686107 = 0-13 8x 35% looox a> 22646107 = 483087 Chau ary) FOOT CAAT TTT ‘Scanned with CemScanner GY calevtate the are of footing and upload soil W) Caleotete she dogth 8G Looking toy bending moment et Desi gn Constant Fe 200 0.533 o. fia fekba* Beste See lise gckbd* ec OSA \Bagekba~ Load= Boo KN Design doud= Pd 2 LEXP = \-Sx 3000 4500 407 og Pde 450 PE= 4450 Area of footing= PE _ 4950 aco Se a assuming ay footing, syot w= TEE A.06 AS Rence {ooking size = Ws 4.5m ( 4500mm) be k.om (¢ 4S00mm) \reo ‘Scanned wih CamScanner “anil pressure = Rd ee Lx® z Too 284 shear [|e BM method Bending moment » Yr 2000 M= 00° Closer value)® 2 > 224( aBonye = eetotttinm 443 Kim P4447 008/088 448000 Nm 4 42000000 Nem 443 x10 Noam a — =— =— —_ = — = — “> A= 2000 —_ a = ad — — = = — = = Mu Mo Sunil & a NN Ona 1Onsiaa) gek bs* ©-'38 x 30 x Ipod x d> ‘Scanned wih CemScanner ; 4 Ory coring of concrete is easential 2 Nome any foor | Coring © concreke . ® dgine scortabilihy a concrebe A choracterisies of gied Serkahip OR concrebe coring can be gestribed a Keeping the conerete most £ tare AUP £0 Atak te ny dration of cement con continu, He, Mere elaborately, it'con be desenbed ad the proces maintaining & Sabistactdry moisture content and a favor Fempertore in conereke dhting the, pericd immedickty folleng Plecement so arab hydration of cement continue, aH He denied properties are developed fa sufficed Seyree H mek ga cequiremaur af service. Curing does effeck the strength S. durability of fe conudke, SOK Jeods fo alert Hd chrergth of sirvdure. ae Coriny 15 egental so dud the dorgels and effeds men albove can be = metthod ond broykt tn to pvide Me bear enviconmadt gor coneree to qu strengit. Methods oR coring conerdke ares 1. Weber corny 2+ Membrons curi 3. Applicotion B A, tiscelloatoun, @ Workabilih 98 concrete Ct e tro corerdte con be ment by three charatherishas > 1. Compatibiti 2 Moy; Scanned wth CamSeanner Factors offectina, workeabilihy ag conerdbe. + Water | Cement Rabic 3 agree: size & slope. + Admin torey + Compal bili hy = doe exe with ulidi tte contrate con be compacked and air removed . = ORLY eye sith whith concrete can {oo into ge weinkectements ‘ Steditity - abi, Yor conerake to cembin sbh Tromengnvs daring Furetlny d+ vibration Searegation. +e Soma otha reqvirenids V EOS mined A tronaperted 2. Ynigoem Aaronglout 3. Consistency 4. Good fnishiny horace tates, £ Gc x sey Aconselidghon — Nok searegate doc pesy s 5 Gite Rave alality ' be compacted eoryy .

You might also like