You are on page 1of 2
E> “General Contractor, General Supplier, General Trading (Exportimport), General Service, Pr DINAMICA AYA MANDIR Inspection, Testing & Certification and Independent Survey PENETRANT TEST REPORT Page 1012 Report No. : 015/PT/Din4-P1/02/05/24, PT. PERTAMINA (PERSERO) JDrawing No BEG-DWGPTT-L31-SPL Rev. :02 {PILE PLAN (SPIRAL STEEL PIPE) Procedure No, oimnor.o7 ev. :00 Applicable CODE aws014 Carboon ste! Weising Process :SMAW. visible Solvent Removable rane’s Name/Type = SUPERDYE CHECK Penetrant:KO-°T Cleaner :kO-8T Developer :KO.0T Solvent Spray Drying after pe-ceaning, Spray Dwell Time: 15 Minute LUgnt Source: Day Temperature: 65°C -57 °C ovyng ster remove excess penetrant Developer Apps Minute Developer Tine: 1oMinute DD machining CO inding Dy As Welded me Of xaminaton ter Welding Ci Atertidrotest 2 Ater PwHT Di otters ase Metal C1 Edge rep tack Chipping 1 of Examination ” Weld Part T Repair Weld TD others Tickness Result Part Name Remarks (oom) Accepted | Rejected Join Pipa Tang Pencang Spiral Stel Pipe Nost Join Pipa Tang Pancang Spiral stel Pipe Not Join Pipa Tang Pancang Spiral Stel Pipe No.2 sein Pipa Tang Pancang, Spiral steel Pipe NoSt ketch Identity escontinltis sted above ) If necessary: examines by Jona inspector: [mies Party TERNALEM ES Pr Level General Contractor, General Supplier, General Trading (Export/Import), General Service, Inspection, Testing & Certification and independent Survey customer PF. PERTAMINA (PERSERO) Report No, 015/PT/DIM-PT/02/05/21 Project Name PILE PLAN (Spiral Steel Pipe) Page 2of 2 ‘ATTACHMENT Pile No 91 - Joint No 1 Pile No 91 - Joint No 3 Pile No 91 - Joint No 4 ame TERNALEMES i eet Pruett 07.05.2023,

You might also like