E> “General Contractor, General Supplier, General Trading (Exportimport), General Service,
Pr DINAMICA AYA MANDIR Inspection, Testing & Certification and Independent Survey
PENETRANT TEST REPORT Page 1012
Report No. : 015/PT/Din4-P1/02/05/24,
PT. PERTAMINA (PERSERO) JDrawing No BEG-DWGPTT-L31-SPL Rev. :02
{PILE PLAN (SPIRAL STEEL PIPE) Procedure No, oimnor.o7 ev. :00
Applicable CODE aws014
Carboon ste! Weising Process :SMAW.
visible Solvent Removable
rane’s Name/Type = SUPERDYE CHECK Penetrant:KO-°T Cleaner :kO-8T Developer :KO.0T
Solvent Spray Drying after pe-ceaning,
Spray Dwell Time: 15 Minute
LUgnt Source: Day Temperature: 65°C -57 °C
ovyng ster remove excess penetrant Developer Apps Minute Developer Tine: 1oMinute
DD machining CO inding Dy As Welded
me Of xaminaton ter Welding Ci Atertidrotest 2 Ater PwHT Di otters
ase Metal C1 Edge rep tack Chipping
1 of Examination
” Weld Part T Repair Weld TD others
Tickness Result
Part Name Remarks
(oom) Accepted | Rejected
Join Pipa Tang Pencang
Spiral Stel Pipe Nost
Join Pipa Tang Pancang
Spiral stel Pipe Not
Join Pipa Tang Pancang
Spiral Stel Pipe No.2
sein Pipa Tang Pancang,
Spiral steel Pipe NoSt
ketch Identity escontinltis sted above ) If necessary:
examines by Jona inspector: [mies Party
TERNALEM ES
Pr LevelGeneral Contractor, General Supplier, General Trading (Export/Import), General Service,
Inspection, Testing & Certification and independent Survey
customer PF. PERTAMINA (PERSERO) Report No, 015/PT/DIM-PT/02/05/21
Project Name PILE PLAN (Spiral Steel Pipe) Page 2of 2
‘ATTACHMENT
Pile No 91 - Joint No 1
Pile No 91 - Joint No 3
Pile No 91 - Joint No 4
ame TERNALEMES
i eet Pruett
07.05.2023,