You are on page 1of 28
RYAGH METRO PROIECT- PACKAGE 1 Document No: M-8cW-00000-G500 FOR 401038 a SUB-CONTRACTOR TEST RECORD wel js, BACS HANDLI UNI a TQUPWENT IDENTIRCATION Praccio:2sa72 [Post Nome: RIVADHMETRO PROJECT [Loston UNDER PLPTFOR Poon: VRB Construction Work Package Tupi Desrpon [a DUN OT TEST RECORD NUMBER in BcW2G1000-G500-THP-OT0507 7ASSET IDENTIFICATION NUMBER [2GTARIEOF ‘SYSTEM NUMBER ferAsiWACaEO TESTING DESCRIPTION ZGI-AHU-04 found OL a "APPROVALS Testing By (Prine Name MEER FALOOADU: Testing By Signature Ze one 26]o9] 2020 Responsible Feld Engineer (Print Name aed Aix tain’ ‘Responible Fld Engineer (Signature) = Date: 2 oGF/20% nmoupsa.csonno me (©2016 Sa ato Bec! Company and Amada General Contactors and Cosoeed Conta? Copany WAL reproduce his maton by pemsion of Pa! Duet, A igh ose ages SHOHNTROMORT- MCSE! AIR HANDLING UNIT DX Sa ona TYPE & CONDENSING ma sigs UNITS re Co BACS ‘tewe STARTUP TEST REPORT —“S¥EDATE: 05-Dec-2019 sneemnctanene PAGE: 10f6 __| EQUIPMENT IDENTIFICATION Project Nome [RWADH METRO PROJECT locaton: 261 oom VRS Bd [Asset identification Number Anv-04 Wi ACCL-OF4 [Equipment Description AER HANDLING UNIT TEST RECORD NUMBER 'M-BLL-000000-GS00-TRP-»00 SYSTEM NUMBER 2G)-AS-WvAC — 03-0 AWU Start-Up check ust ess | ran | NA |. Pre Start-Up Inspection: ‘A. General 1._The ground etance ceca forthe euler wounding have ben ceded 7. The feeder iaton ets ad been performed and approved dr intalaton pais Detoe procoeding ive gn, MCC or MCP testing an cormisorng shoud be competed and approved porto testing {Torque tet shouldbe conpleted nd approved ring he salation have before pocredg@ The motors compres nsuaton Tet OU be Complete AT repos sou be roVaeaY the vendor ports energization, By vendor 1._ Engage for authori evn reparative operon te lowng QAR QI ofolojo|o oJolojolo 3. nipec field sembly of components ad insaltion of entra station air handling uns [including piping, ductwork and electrical connections, a a Qa Vendor o amples the tarp helt report under secon FOB Tandther om ehek | — pe Ty] list under section 10.3.3 2 After the instalation is completed iv alirespec, the folowing points should be covered before the system i switched on for operation 2.4 Condensing Unit (Outdoor Unit) 1. Make sure all electrical fasteners/connections are tight and secure. cm o a 2 Male sure cut breakers /fused disconnect switches are properly installed awloyo 5. Make sure all contol are set according to retructions (low & high pressure sich, pump down pressure switch, fan cycling switch, etc) am@ia a 4. Make sureal ves are open compressor suction and discharge sence valves, gud he valve, etc.) a| a oO 5._ Make sure expansion valve bulb i strapped propery at correct location aio a 6. Make sure thermortat installed property o,oTe 7. Follow all the instructions from the warning tags and stickers alo o Energie compressor crankcase heater for minimum of 12 hour prov tothe system sart-up ‘To energize crankcase heater only, set thermostat to OFF position and close electrical disconnect | [A~ | [] o switch ofthe outdoor uni. '9._ Inspect condenser coil and other components for any physical damage. a o o 10, Make sure condenser fans are free to turn without webbing and their mountings are a properly tightened. Go o 1. Make sure all refrigerant service vale cape ae installed - cores ST TEMPLATE: M8 020006500 FOR PROCeOURE mu. c00000 s.r. cona (©2016 oud arabonBeciel Conpony and Nrvaban Gaver) Canvaios and Consdlited Contactors Company WL Use asclsueor reproduction of ths infomation oly by permison ofthe Project Director, lights reserved. WOINEROMORCT-EOK! AIR HANDLING UNIT DX an oan TYPE & CONDENSING UNITS REV.Nos 001 STARTUP TEST REPORT —'SUEDATE. os one2019 PAGE: 2016 3 z ‘AMU Start-Up Check Uist 12, Make sure all piping, piping insulation and piping supports are properly installed 13, Connect the manifold gauge to suction and discharge ine service valves. 114, Prepare instruments required for checking voltage, Amps, fon RPM ete RNS ojojo|o) ‘jojo|o} € 25, Start the unit and observe compressor discharge and suction pressures 2.2 ANU Unit (Indoor Unit) Fiter-related Checks: 1. Check to make sure the fitercartidge count scored, Ifter count short, the exact ‘number received shouldbe noted onthe fright bill at ie of deliver 2._ Make sure that fiters have been installed propery in thelr places. 3. Check tobe sure thatthe fiters called Tor are use, Talure to use the itere that your Zamil ar handler has been designed for can cause fan motor overload and/or cause the coils to become ity and restrict ae flow. Oo}; 0 jojo og; 0 joa 4. Filter access panels or doors should always be closed fly to stop air by-pass around iter cartridges. Fan-related Checks (Applicable both for AHU & Condensing Fans): 5. Fan isolation shipping lockdown places shouldbe removed, 6. 1fload points are not on same plane ater supports are removed readjust wolators until a [etelulelo ‘Compressor Model/Type > P24bKC ETE 7 5)22 Gompressor Unit SeriaiNo: Geas3e6D lig be [as (4) |e Io [Jal N/A AJA Compressor Unit 2 Serial No-tican2 1 sg [ast [see [4s [4a [4 ws | Jal Ja townie: S62 Rl Power 408 | Ph; ona st Dimako Power input Power, y 4o0 jh; Hes FAP Bs tra VEY eae 38613561386 [6 +) [6-) |6-) [NJel val n/a Condenser | FanNo 2 b&b |3%6|266 |e & 15-5 |e L/W fans [Fan No. 3 2&b [2 & [286 | og [5-2 [s-e|n/al w)al A/p Feo Wo. 306 [356] 386/601 21 12) Iwan whl v/p Fan No.5 Wal eel a [AA TRA [oA [NA TY DS fa Fanta Wal Nal Pals INA DA PAA ‘Compressor Unit NO. 4 Compressor UnitNo,2 Discharge Pressure Pst 422 PSL 430 PST Pressures | Suction Pressure i | ISoPSL 130PST a 2 3 Conpresor Unit | > Gonpresorunn2 | winding | FOO 4 @ FAT Insulation [Fan No.2 ( a Fano. l anna TELATE: M81 000000 500 FOR PROCEDURE: 000000 G0. PHO DOOR (©2016 Sout Arabion Becie Canpany ond Ainabon General Corirators and Consldted Contracts Campany WEL Use scsi or reprosiction of this iformation oly ypermision ofthe Project Director. lights reseed. RIYADH METRO PROIECT-PACKAGE? AIR HANDLING UNIT-DX Deciment=FORM: TYPE & CONDENSING foe ¥en UNITS fevine: on FUNCTIONAL ISUEDATE: os 0802019 PERFORMANCE TEST REPORT pace: 6016 fantas 77k rae Pin waneient | 19 AB me | NDA “hFormotors ond compressor winding Insulation tet ether tobe conducted by the vendor oto prove FAT res 2. Formase& slvotion test ether be conducted by the vendor r vendor o provide FA esl. General Notes: 1. Obtain values forthe items in the following formula. (Fan Total Static Pressure = External State Pressure + Specified Internal Losses + Unspecified internal Losses). Refer to Schedule onthe drawings for additional information. 2. Check the motor connection and the matching ofthe supply voltage at the rated voltage a fluctuation of supply voltage between + 5% Is permitted 5. For Single Type Fan, use only Supply Fan Test Data Table and matk cross the Return Fan Test table. 4. For Variable Air Volume type ANU, run Variable Frequency Drive contra in varying frequency, starting from 25%, 50% to 100% (60H) then take operational readings at 100% (60H) condition. 5. Tolerances: Set HVAC system airflow and water flow rates within the following tolerances; ‘5.1 Supply, retuen and exhaust fans: Plus Sto plus 20 percent. 5.2,Air outlets and inlets: 0 to minus 10 percent. ‘Test Modification ‘Modification installation Restored Spedalst Date Specialist Date In the event that the equipment is nat materially in compliance with the performance, initiote a deficiency report in accordance with the requirement ofthe standara work process procedure for Control of Noncanforming Items. (Ref 5) ‘Measuring & Test Instruments Used: item Description ‘Manufacturer [Model Serial Wa Cal Cerificate | —Calbration Due Date 4. |ELamP en LUKE 3/9| FLUKE - Bi 419 062 65 | Iefo3) 2010 lo Ta02 ase SE [sesanree [B57 PRI. lee Povol NTO, 3. ire \6ST- TEOMA D0 nero | Jor, F ZR Tz Ke |gsT-717 |He1129 £3 fo ¢/o og] a PSYC EXTecy 06 |jo383209 [rod foorh “TEMPLATE: M81-000000.900-FORSa PROCEDURE: m--00006300-P80-000021 ‘© 2016 ous Arobion Bechtel Company and Rinaban Gera Canara and Cansoiaed Contactors Company WLL Use dsclosureoreprodction ofthis information only by permasion ofthe Projet Directo. Al ighs served RIYADH METRO PROJECT - PACKAGE 1 AIR HANDLING UNIT-DX ‘Document FOR! [M-BL-000000-6500-FOR-200000 TYPE & CONDENSING UNITS mm pall jas FUNCTIONAL REV.No.: 001 3 101 ISSUE DATE: 06-Dec-2019 BAcS thee PERFORMANCE TEST REPORT pase: Sots Come 7aeROvALs Performed by: BistimsN Pus BEA Dh-O¥- e2<] Pint Nome Signature ate Sorup Specs Ai du not pers (Clsane atreored) Print Nome Sanat reewedy, — Sacre Maatdd Sela D6 Pint nome Sonetwe ter Pint Name Sinature Date PROCEDURE: M-su 00000-6500 90-0021 (© 2016 Sau Aroban Bechtel Corpony and Rimaban Geral Canacars aod Coneaaaed Controctars Company WIL Use, dlcosure or reproduction of ths nformeion nly by permission ofthe Project Ditetor Al rights reserved. Zamil CoolCare COMMISSIONING REPORT DATE 1 26]a9[202 JoBNo, =: AHU-0 CUSTOMER =: HApC® BLOG.NO. 2G geen hae mee 2s ee {door Unit Outdoor unit o Package Unit EPMO Iawaxpse-anicpvar-241-anuda [Em | w/a MoseINO. IT W24P5B 417 RID2-261-Arly yMOwINO | CTX OS O SeialNo Newevnop area SeiaWo | BHLIBPO01/M SYSTEMNO: LOCATION: * Tem baad fae T._| Check the equipment is tastalled in the right Tocation and hooked up with matching tag numbers 2. | Check any obstruction for condensation 3. | Check whether access to control panels are proper | Visual inspection ofthe equipment and accessories for damages during transportation / installation 5. | Check voltage / cable size / disconnect switeh / breaker are inline with name-plate data, 6. | Wiring in control panel, electrical components and other applicable areas are proper and terminals tight 7. | Control panels have proper schematic diagrams 8, | Compressor mounting retainer brackets are removed and bolts adjusted 9. | Check proper grounding of the unit 10. | Spring isolator/rubber pads are installed (as applicable) 11. | Expansion valve bellow strapped, insulated, tight at proper location 12, | Control panel gasket YAN RARKARARNNAR 13. | Evaporator coil clean and free from damages, etc. Form: 6500:85-A-A035 Page 1 of S Zamil CoolCare ‘ tem ox [OFT ete [Remar 14, | Air fers are installed and in clean condition = 15. | Evaporator drain pan and drain pipe 7 16, | Check bower belt sizes and tension; ensure they are identical a 17. | alignment of plleys a 18. | Uniteabinet insulation Y 19, | Evaporator fan on comet direction _ 20, | Condenser ol clan and fe fom damages on fins 21, | Condenser fan motor propels are ightened and are in line with ventury ca 22. | Condenser fans on coret direction me 23, Cont switches invalid propery apts) | 24, | Temperatre and pressure gauges eadings are ‘correct (if applicable) 25. | All cabinet screws and bolts are in place and tight oo 26, | eigen valve caps ae installed a 27. | Flexible canvas connections ra 28, | Suction line insulation Y 29, | Thermesta/contol devices installed and checked = 30, | Oi pressure switch — 31, | Sight glass Gifapplicable) y 32. | Time delay (if applicable) a 33. | Ant ice thermostat (if applicable ee Form: 6500S. A-a8 Page 2 of Zamil CoolCare Item NorOK] Not applicable Remarks Air flow switch (if applicable) Auxiliary drain pan (if applicable) 36. Damper operation (if applicable) \INME 3, (Crank case heater on 24 hours Bitamed Tesepy ZAG Representative gee 10: abl? x avr Fon: 6500.58-4-A035 Customer Representative, S-ee/ Al tals == Page 3 of 5 Zamil CoolCare TEST REPORT ate 2bloF|202& 0B No AVII-O4 CUSTOMER | HAPCO BLOG.NO: sD &y TAGNO, 2Gl- AWW -04 ye Unie Onrtoor unica W2k PSBAITERYD?-2G)-Ariu-pe| ENN | N/A 2 EPS B AI TERYDZRAGl-AMey| Movsh | CT XO.S'O IKHEYD6002M Bens lhe FHLB PO ONT System No: Time: 10: S5AM [Time []: GoAt| Remarks Peg $1 86 Export Ai-Out BS eae Condenser Aid 103.4 Jo*+ pa amp N u&s enorme 4054 lo4 Room Temp'F 5 Grille Tempe OG ‘Suction PSI System #UNSOl#2 730 [#3 I [HA N/D Discharge PSI System | #14224#2430]#3 N/n [#4 N/A KN Blower pulley | Mod: a8 y Loom ‘Motor pulley —| Mode 2 Deo mm V-belt Sue 2240 Qty 2 Deseription Blower Motor RPM 163 IW14 Volts 12990 13394 [23374 Blower amps Phi BB [paz 32 Form: 6500-SS-A-A035 Page of 5 Zamil CoolCare Description Blower Motor Compressor tamps | Phi 4] |rm2 40|Ph3 40 L Compressor 2amps [Pht 4% [pha 42 [m3 Aa Compressor 3.amps [Phi N/A [Ph2 N/A | PHS pI/A Compressoréamps [Pat Ay [Pa2 N/A [PH3 v/a | Condenser fan tamps [Pht 6 -\ [Paz G. } [Phi G.] 1 Condenser fan 2amps [Phi 5.8 [Ph2 5.9% |Ph3 5.¥ Condenserfindamps [Pht 5.9 |Pe2 6.9 [rns 5S Condenserfan amps [Phi Go [m2 G.| [pms G | CondenserfanSamps [PRT AI J4 [P2 tla [PHS ATA Condenser fan 6 amps [Pht A/a |Ph2 N/A | Pm3 yh] Condenserfan Tamps [Ph1 N/A [Ph2 ATA [POS ALA Condenser fan 8amps_| Phi JA [PR2 A/a | Pm3 AIA Heater amps Put pacz| P22 Pace |k3 2 Pac Dustteateramps [Pht Pua | m |_| B irameN) Gosepe Customer! Represennetive Form: 6500-S8-4-A035 SaccA Dacha Soa ACCUR o4 — x S, UNIT PERFORMANCE CARD UNITARY /APPLI & IED PRODUCTS Lala Faun excKaceiconDensne UN oe SOLA 4. MopEL: 2. cour. sx UMTS @7 * BROT g TaN: ] ee eae a [RUN TEST PARAMETERS. sys. | Svs. ‘CHECK POWTS. imsPecTOR [DATE ‘fables tame CF) -Wewdry [wt — Oy ——~ |[sleoumnessonin rest t~ S- _[05/0/78 oecumin canvas oun [37 >U nA /31F [ad 2 Pmenuanresr cesond PDB ec [orsurrivy-rH-rRea (597 5 v. om me || 3 [evmcvaron (so umton) | -aLoweR uoroR 7. 7 [ ARG perme) 129-07 [rou oLowen wie. 2 x ~ + [Rew-conoensen aw 3 fs |eonteor soxvaa ase @ [stone uoroR airs 7 [courasororcnowiows WA ‘CALIBRATION INFORMATION [calibration Date + 140ct19 Result Type Aa Found Due Date » teoa20 Ambtemperature + 23 £2°C Procedure Used: KYORITSU 3005 Performance Relative Humidity + 201060 % Ri seat al site CML Riyadh ‘TRACEABILITY INFORMATION Messurements are traceable the St Unis insmaton ‘The estimates expanded unceraty (it spied) of mat coridence level of approximately 95% with «caverige factor oF al Sytem of Unis) a national or intemations! lebron, surement to be aiccold wih the revs Is ealeueted at REMARKS / DEVIATIONS 1 ANY The desrbed instrument has bean cabrate under the ambient condition tated ave, UT meets manufac’ speciation, 5. The UT was rcolved in good consti. Asset # of uur ‘Authorized By A TE 5006859 Eng. Abcutsh Saoed essere, Calibration & Variation Laboratory, Svaa # DOL, tnd TRAST CH, Te 966020079293) Ext: 1205 & 1214 Biemh, KSA F7S.10/0101 Page vo Rev00 C217 B MOTABAQAH Ciena CALIBRATION CERTIFICATE Seu Spend Labret Co Work Order # 202001404 Issue Date : 17-Mar-20. Asset Number ; GCS009904 ‘CUSTOMER INFORMATION lcuetomer Name: Hamad AS Alahei & Partners Contracting Co. Led, laces £ P.O Bok 69, Ryadh £1471, KSA UT INFORMATION |Description: + Clamp Meter AC/DC ‘Received Date L-Mar-20 \Manufacturer ‘Fluke ‘Serial Number 47640628WS Model + 39 ID Number WA [Range # NA UUT Location MA CALIBRATION INFORMATION eee cess nico Rest Type TeFound Due Date * 16or28 AmbTempersture + 7342 Procedure Used + Fiuke 319: (1 year) VER Relative Humidity + 30t0 60% RH /S520A+SS00A/COIL Cal Site Mcvi Riyadh TRACEABILITY INFORMATION Measurements are taceable to the Si Units (Intematonal System of Units) fa natial or Intemational leeratorse The estimated expanded uncertainty ( specified) of measurement to be assécated with the resus ic cafetted at confidence level of approximately 95% with coverage tact of k= 2. REMARKS / DEVIATIONS IF ANY 1. The measurement rests are given onthe attached sheet(s). The page numbers may be numbered separately. 2. This caliration certifeate apples only to the item identified and still not be reptodsced except in ful without the approval by CVE. 13. The described instrument has been calbrated under the ambient conditions stated above, 4. UUT meets manufacturer's specication. 5. The UUT was received in good conden, Sieasurement, Caftvation & Verification aborekary, Strest ® 201, 2nd incisal Ch, Rad, KSA AL-HOTY CALIBRATION SERVICES A BRANCH OF AL-HOTY CO. LID. Calibration Laboratory ©. R 2051015391 P.O. Box 31729, Al-Khobar 31952 Kingdom of Saudi Arabia Tel. : (013) 864 4150 / 894 8020 / 894 5452 Fax : (013) 898 1644 / 894 3980 E-Mail: acs.kh@al-hoty.com Website : vww.alhotycalibrationcom Certificate of Calibration Certificate No: 1908-333907 (RecneDirED) Calibration Cert #: 2467.04 Customer Name: Hapco Address: P.O.Box 3488 Riyadh 11417, (K.S.A) Product Identification and Specification Item Submitted: Digital Psychrometer Page No: 1of2 Manufacturer Extech Instruments Received Date: 03 September 2019 Mode! RH300 Calibration Date: 16 September 2019 Serial Number: 10303211 Calibration Due Date: 16 September 2020 Asset Number. N/A Certificate Issue Date: 18 September 2019 Customer P.O: NIA Received Condition: In tolerance Returned Condition: In tolerance Calibration Procedure: ICP-1-031 ‘Summary of Procedure: The Unit Under test (UUT), a digital psychrometer was calibrated by comparing its indication with known values. Environmental Condition: 23.61 + 0.16°C / 34.40 + 2.19%RH Callbration Results: (sae the next page) Calibration Notes: Basis of Tolerance : Manufacturer's Specified Tolerance Location: Temperature Section, ACS Laboratory, Al Khobar The statements of compliance is based on the performance of the unit under test against manufacturer's specified tolerance and taking the measurements uncertainty into account. ‘Standard Used to Calibrate Instrument: Description ACS Number Cal Due Date Traceability SPRT ‘ACS-KH-TEOO1 22 February 2020 88207027 (NIST, USA) Reference Multimeter ACS-KH-ELOO1 25 October 2019 _EVL493476 (NIST, USA) Laboratory Drying Oven KH/0/108 ‘34 January 2020 188123 (NIST, USA) Humidity Calorator ‘ACS-KH-TEO10 17 June 2020, 198251 (NIST, USA) High Accuracy Thermo-Hygrometer ‘ACS-KH-TEQ20_ 21 June 2020 £89625063 (NIST, USA) High Accuracy The 6 May 2020 5 Calibrated By: rec cltraten a cay ey pao eparong te og tem Suny OH ‘sete maya eo Sern nb ep ne spo ey Cin Snes.

You might also like