You are on page 1of 1

Project Name: Umm Wu’al

GC-CV-029,Rev.A01
Phosphate Project
Contract Number: 20-WS-043
Project Location: In - Kingdom

Check list – Coating Inspection Report No.

Tag Description: Tag No.:


P. O. No.: Inspection Classification Area/Unit:

Contractor: GAC GAC  Turnover System:


Work Package: MWSPC  Other  Sub – System:

Item Description of Check GAC MWSPC

1 Coated surface is clean &dry

2 Specified DFT achieved

3 No paint faults e.g.: brush marks, sags, runs, orange peel, etc...

4 Evenness of applied coat is acceptable

5 Appearance and finishing of the coated surface is satisfied

6 Color of the coat is accepted / Specified ( Important for Final Coat)

7 House Keeping done as required by HSE

Notes:

GAC MWSPC OTHERS

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date: