You are on page 1of 9

RLNG SYSTEM OF

BQPS COMPLEX
ELECTRICAL SCOPE
CONTENTS
• CONCEPT DRAWINGS: SLIDE 1-2
• LAYOUT: SLIDE 3
• LOAD LIST: SLIDE 6
• PROPOSED BQ2 CABLE ROUTE: SLIDE 6
• REFERENCE PICTURES: SLIDE 7-9
Concept Drawing of RLNG System for BQPS Complex Spur Line

Gas Regulation
Station of BQPS-III

Metering
Station

Gas
Regulation
Station

Mixing
Station

Mixing
Station of
BQPS-II To Gas Turbine
Electrical Power Supply Drawing of RLNG System for BQPS Complex Spur Line

Gas Regulation
Station of BQPS-III
From BQPS-I (120KW)

Metering

From BQPS-III
From BQPS-I Station

Gas
Regulation
Station
From BQPS-II

Mixing
From BQPS-III Station

Mixing From BQPS-II


Station of
BQPS-II To Gas Turbine
LOCATION OF
METERING,
REGULATION AND
MIXING STATIONS
Gas Regulation Station of
BQPS-III
Metering Station
for BQPS-I,
BQPS-II and
BQPS-III Gas Conditioning Skid
Gas Regulation (BQPS-3)
Station of
BQPS-I

Mixing
Station of
BQPS-II
CMN BQ1 BQ2 BQ3
Station Load

Metering Station for BQPS-I, BQPS-II and BQPS-III 95KW

LOAD LIST Gas Regulation Station of BQPS-I 130KW

Gas Pressure Regulation Station of BQPS-II 160 KW

Gas Regulation Station of BQPS-III 120KW


EXISTING CABLE TRAY CABLE TRENCH
BQPS-II CCR
CABLE ROUTE:
1. 3rd Floor
Cable Room HRSG-1 HRSG-2 HRSG-3
2. 1st Floor
Common PC
3. Termination
in ACB
BQPS-II GT Hall

BQPS-II WAREHOUSE Underground

PROPOSED BQPS-II RLNG SYSTEM


CABLE ROUTE
BQPS-II RLNG SYSTEM
BQPS-I RLNG SYSTEM

Gas Regulation Station of


BQPS-I

Mixing Station of
BQPS-I