You are on page 1of 4
Scie O00 newn ch Semester B.E. Degree Examination, Aug./Sept.2020 ity Surveying and Contracts Management ‘Times This, ax. Maks: 80 Note: ) For Regular Sudents: Answer any FIVE ful question respective of males 1) For Arear Stents Aner any FIVE jul questions choosing ONE fl question ‘rom each module. Module: 1 Prepare a detailed estimate fora resides building shown in Fig Qh, fr the flowing items of work (i) artwork excavation fo foundation nha sail {GBM wall with CM 16 fe super stctres (ancemen pater: isi and oti was Fis asa) 2 atime the cot oF RCC roof sabia C.C 11% 3 over a rom of inemal dimension 5m x 4.2m Callie the quantity of conerete and steel reinforce. Given : Slab ‘Bikes = [Soma Two-wy slab Stel equiterent Main sel = fun) @ 150 mu fe Secondiy steel rum @20mm ce. Atemare bas cranked a one end caly. TMT bar ted, hee rode Lind at end Wal thickness = 200 an, Cost of conerste= Bo 12.00, Cost of steel tare Re, SRS denen Module-2 3) Thedtasofmanhoe even in Fi Q3- Fad it quanites ofthe oliowing tens (i) Earth work excavation for funda is haa sl (G), BBMin CM [for walls (i) RCC root vocering sb in CC. 1234 cunir LIBRARY {is Plastering in CMT fo inside walls anton 0087 (9) Bedeoneteein CC 13:6 os arty ots iscvai Fiegs atinate he quasi of eachwvork om chsnage 70076 eseured with a tans 20 hin from the following data. Use meat sectional area method, Side slopes tin cating {nd 2:1 i banking. Fomation width of roa ie Tam Draw the longitu con ofthe rose road. China. a ‘Ground evel Ga) [B10 87.74 | BAD] HID [HOTS | HOT YATE 040. Formation level (o) | S850] Rang rien n 00 —> enter Module Menton the object of artng pein. oot ‘Whe the detailed pei Scans for any two ofthe flowing: (0) Firstelass brickwork in upertyuet n CM 15 (i) Bed conrete in fundstion In CC (1:48) (i) Distempering we conte with cou primar came) Mento the fos acing rate of tm of work coxa ‘Workout rom st principles tera por uit fray two ofthe flowing (i) Sie suess masonry in CM 16 fr Pints (i) 2mm tek plastering for inside walla CM 16 (Gd) REC work for beam in CCU: 14:3) ema Modute-t Define (0) Runningbill (i) Secured Advance Gi) Advance payment {iy Voucher (9) Quotation (3) Contactor (oe try ‘What are the ciferen ype of contact? Explain ay two. (esr) Esplin rit the ean in wh he contact can be ena. (srt) What are the advantages and diendvantages of Lump-Su contact? woman Expinin Tender Nati List he extent aration given slong wth der ice, (ts marty Whe the elements of stundud ender document (as te) ets 0 1scvsi Modules What is measurement book? What ar theres to be followed inrcordng measurement took? enn) ‘A bulding is sane bythe side of¢ main oa. The bil up portion is 20m * 15m. The bhilding i of fst clase type and provided With water supply, santaion ad else fing. ‘Age of the building i 30 years, Workout the valuation ofthe propery. Are of land on ‘nhich building stands is 300m. Asse’ pligh area rate as Rs 20,004, ie of the Duilling 100 ears andeasofand, Rs 2500'n" as men) Define (@) Obslesence _(ijeSinking find (i) Depreciaion iv) Mortage {Sera value” 7) Lewsbold propery conn ‘A poron has purchased plot of land costing Rs, 800,00 and hs consructed a building thate on aa total cost of Rs. 20 lakh incloing water supply. sentry and elects instalation e. Allow ne etien @ 79 on he cost of constuction ane @ 3% net eta ‘on the costo and workout he tad eno he property withthe following ts: Sinking find on #9 bss forth ure of 75 yeas = 0.0022 (iy Annual painerane 0.59% a the ost of eonsteton (Gi) Municipal toes and other outgoings @ 28% oF the goss ent omens) Contr LIBRARY 30f3

You might also like