Assignment No.

Due date 23/11/2020

1. Refer the EIA report for Vizhinjam deep water port Identify two major negative impacts

each on the biotic, abiotic and socio economic environment during the construction

phase. Suggest one alternative each

Ref : (https://www.vizhinjamport.in/download/CEIA_Vizhinjam-Port_Volume-

1_27.05.2013_FINAL.pdf).

2. Assume that a new water supply project is coming up in your locality. Prepare a checklist

(simple/descriptive/questionnaire type) to assess the impacts on environmental

components during the construction phase. Analyse and predict the impacts