You are on page 1of 50
HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AasO= oS TOT {CHECK SHEET NO. = Page BAVA S| AAAI Date Issues = RESULT OF INSPECTION / TEST 26-Jul-13 ae - ESF Project No. _ PN-082 TABLE OF CONTENTS | iy 5c of inspection Bae ea Be EASE Class/Authority NK [Dept QM [Place ONBOARD | Weather/Temp. © HULL & OUTFITTING 1. HULL DIMENSION 2. TANK AIR TEST 3 HYDRO TEST 4. OPERATION & LOAD TEST FOR ACCOMODATION LADDER 5. OPERATION & LOAD TEST FOR LIFE/RESCUE BOAT & DAVIT 6. AIR VOLUME CHECK FOR AIR CONDITION SYSTEM IN ACCOMODATION 7. FIRE LINE SHOOTING & WATER SPRAY TEST 8. VALVE REMOTE CONTROL SYSTEM 9. ANCHOR AND WINDLASS TEST 10, WINDLASS AND MOORING WINCH TEST 11, OPERATION & LOAD TEST FOR ELEVATOR 12. OPERATION & LOAD TEST FOR MONORAIL CRANE 13, OPERATION & LOAD TEST FOR F.0. HOS M. BOAT DAVIT 14, BILGE SUCTION DEMONSTRATION 15, PILOT DOOR OPERATION TEST 16, MECHANICAL FAN VOLUME TEST 17. WINDOW WIPER FUNCTION TEST 18, CHALK AND HOSE TI 19, CO2 FIRE EXTINGUISHING SYSTEM 20. CO2 AIR BLOWING & SMOKE DETECTION 21, BOW THRUSTER 22, SUEZ SEARCHLIGHT,CO2 & STEERING GEAR ROOM DAVIT. 23. GALLEY AND LAUNDRY EQUIPMENT 24, FIRE DAMPER TEST 25. BALLAST PUMP CAPACITY EP FAT FRYER & D.O LINES @HANSIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. }«———_itg"2v Hiovada + WoLLoa OWIGOZ : 0 ~ to lif é = pres ong naHs/s ‘ans gov WYOO/H 018 LW OL “g'¥ 1 SS HET sos 00 na soy) 284 Se wugs } Late 2 ik ara BE ATTACHED DRAWING. ? MANJIN HEAVY INDUSTRIES & CONSTRUCTION CO TSTOE Ts 7 THOM EGR SHEET NO. 2 Page of 1/1 CONFIRMATION REPORT Bate Issued WAR.04.2013 PRO? | SET, DRAFIMARK | ESSE coq APT Win RAE HARK NK | feo) ERECTION?] Pisce POCKNO.6 | Heather/renp. 30 Deq cel AFT HULL DRAFT MARK 1.9 GENERAL UNE TT etest DATE 03.04.2013 1.2 APTENDENTS : NK, OR(ZODIAC), QM STAFF RECORD PORT READING STARBOARD READING ACTUAL ——-REwARK | DESTGN ACTUAL REMARK 15.998 = TE000 T6-00r T 15,001 15000, 15.000 @ 14,001 1 14000 14,002 a 19.201 1 13200 13.202 2 32.199 a1 12200 12.202 2 11000 ’ 11000 * 10000 10000 9000 9000 ae00 eco 860 {to be omitted 8600 to be omitted 8400 8400 0 9200 ovo 8000 780 7800 7600 7600 7400 7400 7200 id 7200 ¥ 7000 07.002 1 7000 07.003 a 6200 06.0 1 6800 06.002 2 6600 06.599 6600 06.602 a 6400 06.400 0 6400 06.399 a 6200 06.200 ° 6200 06.202 2 06.000 ° 6000 06.002 1 04.999 1 5000 08.000 ° 04.400 ° 4400 04.401 1 04.000 ° 4000 64.000 ° 03.00 ° 3800 03,900 a 03.600 ° 3600 03.601 1 03.402 1 3400 03.401 1 03.199 1 3200 03.200 0 02.999 = 3000 03.002 ° or TS AEE Ba | seer] Renark Giner | Glass | authority bate [ele 2 |- [a Mn a 2am ft FT Fane SRE ATTACHED DRAWING, LUANJIN HEAVY INDUSTRIES & CONSTRUCTION €0.L10. we NO : CONFIRMATION REPORT -20.2013, DRAFTMARK e Thapee MID HOLE DRAFT MARK WE aE earcTion2] Fico Heathet/pemp. 31 peq cel ST DATE 12. NPTENDENT: 0 TEST RECORD MID HULL DRAFT MARK 02.20.2013 NK, OR(ZODIAC), QM STAFF ONT? PORT READING TTARBORRD TERDING besten ACTUAL newark | vesiGN —ACTUAT, _REMARK TSO 5.598 = Te ——T6-00 z 15000 15.00 15000 ‘000 0 14000 34.001 2 14000 ‘001 2 13200 43.20 : 13200 3.202 2 12200 12.199 1 32200 12.202 2 10001000 ° 11000 100 1 0090 10.00 1 10000 3000 09.001 1 900 2800 09.602 a se0o 3600 on c00 ° 8600 8100 99.299 1 e400 200 98.201 1. 8200 8000 98.000 0 000 7800 07.80 2 7600 7600 | 07.602 2 7600 740 97.400 0 7200 07.200 0 7000 97.001 e800 L 6600 6400 6200 6000 5000 4400 4000 1 L 1 3200 a 0 3000 3 3000 a o re eee checkar | Gicr_| Class _[anthorsty| “™*"" Taos [few -ererlezgioa} [is [My 4] ee ZZ | ye | gah we 14 HAXJIN HEAVY INDUSTRIES & CONSTRUCTION COLD, cifbck Shea No. agg of 1/1 CONFIRMATION REPORT Bate Tesued 03.12.201 DRAFTMARK | 2S Ge inspec FORE HULL DRAFT MARK say ERECTION2] Biace POCKNO-6 | feather/remp. 29 Deg ce FORE HULL DRAFT MARK © GneRAL ONTT: Mt «1 TEST DATE 03.12.2013 112 APTENDENTS ; NK, OR(ZODIAC), QM STAFF 2.0 TEST RECORD ‘STARBOARD READING DESIGN ACTUAL REMARK DESIGN ACTUAL REMARK Te000 15000 15.001 2 14000 14,002 2 14.001 1 23200 a3.399 2 19.199 12200 32.201 1 2.202 2 11000 11,002 1 02 2 10000 10.002 2 130.001 2 9000 09.000 0 03.001 1 e800 08 2 08.800 0 2600 08 2 08.60 2 8400 08. 1 § 8200 08 Q 1 8000 oe. ° 2 800 o7 ° 7600 07 a “2 7400 07 a 1 7200 on. ° 7000 on. 1 2 6800 06 0 2 6600 06. ° 6400 06 1 1 6200 06 ° 1 6000 os 2 6000 a 5000 oa “2 5000 1 4400 as ° ao 1 4000 a4 ° 2000 ° L 3800 1 2 3600 Q ° 3400 2 2 3200 03.201 3000 1 2800 1 2600 a 2400 1 2200 02 ° 2000 02 Noresicsts| Ger | clare lnstiontay || Yebeie-2016| 5 A arog ft FT tne SEB ATTACHED DRAWING HugQay HEAVY INDESTRNES & CONSTRUCTION co.t1D. Mane we oT a rec SHEET NO. Pageot = wear AMATE Bae j AAWALE AA Date lsued Fineeri RESULT OF INSPECTION / TEST —'— a TaF a PN-082 jaar ‘TANK AIR TEST. F ¥ DEMONSTRATION Projet a, inpeton tem Type of aspeton wee = ae Suse Class!Authority NK Dept. Ls Place ONpOaae: Weather/Temp. TANK AIR TEST Penns a La Test DATE IZATTENDENTS : NK SHIP OWNER : DATEOF x0. DESCRIPTION waessure | ,PATEOF T” nestanks 7 ToT WETS THnAR | amas | ACCEPT 2 Wo? WA Tank TsDAR | “Temata | ACCEPT 5 No? WB TK) TaBAR | “Tewari [ACCEPT 4 ‘No 3 W.B.Tank (P) 1.8 BAR 15-Mar-13, ACCEPT 5 Nos WT) TrpaR [aan] ACCEPT 6 Wo SW. Tonk BAR| TMi | ACCEPT 7 ROTSWB Tok) TEBAR | eMart] ACCEPT 3 TotW mE TsBAR | “Iran | ACCEPT Nea W TREO TamAR | —1rMaras | ACCEPT 0 Toa DW Tank TrBAR | tla] ACCEPT 1 Noe DB WBTonk TEBAR | —Wsits | ACCEPT 2 Tod SWAT TaBAR | “WeMici3| ACCEPT : TASER TAS) TTRAR | ewan] ACCEPT rm Nos WBTank Py TapaR | Taman | ACCEPT rH No WB Tank) TaDAR | “ewan | ACCEPT 16 To § BIR WB.Tank @) TABAR = [acer 7 No SDB WER) TaBAR | edee12 | ACCEPT Te NoSSWE TARP) TamAR | oratant3 | ACCET 3 Noss WT) TO BAR ACCEPT 20 Nog W Ta TSBAR ACCEPT aa | bar To | aT | et: aa BA sa Baa daly parity pe wat J BY, 6 wire v Kocworr [vit Kim, HANGIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. DUSTIRIES & CONSTRUCTION CO.LTD, FTE TE ao = vtec stat No. Page of x 5 7 BAVA LAL Die sed unico, | RESULT OF INSPECTION / TEST ee PN-O82 aes ‘TANK AIR TEST lela DEMONSTRATION, Projet No, Inspeton tem Type of inspection See = TE SEE Class‘Authority NK | Depe OM [Place ONPOARP | Weatherrtremp. © TANK AIR TEST ss DATEOF No. DESCRIPTION pressure | PATEOF || remarks a Tow ETS TDpAR | Tepe | ACCEPT 2 TOSDIBLWB Tank TaRAR | HeDext? | ACCEPT 3 No6 DB.WB Tank S) TapaR | 1¥Dext2 | ACCEPT 7m ToT WB Tk) T7BAR | eM] ACCEPT 3 eT W.B Tank S) ToBAR | ~orMeris | ACCEPT 26 Fresh Wat Tank Py T9BAR | 2eNects | ACCEPT 2 Fresh Water Tank) TEBAR | 28Nowts | accERT 8 Tod USHFO Tak 6 TEBAR | teresa | ACCEPT 2 No2TEO Tk) Tpar | ueapen | acct 30 No HFO Tank S) TSBAR | ~Wapeas | ACCEPT 7H No3THE-O Tank (P) T7paR | aeapeua | ACCEPT 2 Nos TLEO Tank) TSpAR | ~aApeis | ACCEPT 3 TEROSTRV Tonk @) T>BAR | ~20FemIa | ACCEPT 34 TROSETT Tank P) TaBAR | ~20Fee | ACCEPT 3 TSTFO SERV. Tank Py TABAR | eapets | ACCEPT 36 TSHFO SENT Tank) T7BAR | ~2Maris | ACCEPT 77 DOSTOR Tank?) TaBAR | 2>Mari3 | ACCEPT 38 DOSERY. Tuk (P) Tawar | 22Maris | ACCEPT 39] ULTRA DS NGO STOR. Tak) TpaR | 2>Mtaris | ACCEPT ao | ULTRA LS MGO SERV. Tark ) TepAR | 22Maris | ACCEPT a METOSinp. Tok T9BAR | TeDet2 | ACCEPT 2 TOI CYL-OILSTOR Tonk) TSBAR | Mar | ACCEPT a NO C¥L-OI-STOR Tank §) THBAR | Tiwari | ACCEPT aoe Vinee peed — Sa ST nema: Came _[arovety | owner | cue | Aut a7 pear ves [ayals Pei” ¥ [opt Pees HANHIN HEAVY INDUSTRIES & CONSTRUCTION COL. HANJIN HEAVY INDUSTRIES & CO} STRUCTION COLTD. HAAS we ICHECK SHEET NO. mom Page of AAVALa SAA RESULT OF INSPECTION / TEST want Date Issued HICH, Ciasiawtmiy NS [Dag om [rice ON OAR | Weteteng tt TANK AIR TEST 1.0 GENERAL 1.1 TEST DATE I2ATTENDENTS : NK SHIP OWNER 2.0 TEST RECORD xo. DESCRIPTION paessune | ,ATEOF T pesanks a FTE LOSTOR, Tank ®) T6BAR TaMaris_| ACCEPT cg MIE T,OSTOR, Tank (S) T9BAR TaMaris_| ACCEPT 6 MIE LOSETT, Tank (8) TSBAR T3Mari3__| ACCEPT 7 ST LOSUMP.Tank (C) TSBAR T2Nowl2 | _ ACCEPT w 7.0, OVERFLOW Tank(C) 17BAR T2Nov2 | ACCEPT @ WASTE OI Tank P) TSBAR T2Nov2 | _ ACCEPT 30 BILGE Tank (5) LT BAR T2Novi2 | _ACCEPT F.0. SLUDGE Tank (P) LGBAR B-Mari3_| _ ACCEPT 1.0. SLUDGE Tank (P) L9BAR B-Marid_|__ ACCEPT cw TaDAR TeDecI2_| ACCEPT Gray Water Tank TEBAR DsApeia_|__ACCEPT 8 APeTank (Void) T7BAR OS-Apri3_| ACCEPT 36 FP Tank (Vaid) - Air Keaping TRBAR Di-Apris_| ACCEPT 7 Noid VOID (Air Keeping TSBAR 25-Marci3 | ACCEPT 38 Nod VOID (8) Air Keeping T6BAR 25-Maris_| ACCEPT 2 No VOID (P)- Air Keeping TO BAR 2ieMari3_| ACCEPT @ No VOID (S)- Air Keeping TSBAR 2iMaris_| ACCEPT oi No VOID ( P) Air Keeping 17 BAR Oe-Mar13_| _ACCEPD a No3 VOID (Air Keeping TSBAR ORM S Not VOID (P Air Keeping 17 BAR O8-MarI3_[ ACCEPT a No VOID (S)- Air Keeping TSBAR OaMart_[ ACCEPT 6 Nod VOID (C)- Air Keeping TBAR OApeIs [| _ ACCEPT Dena Wan ape Tz wae | Pave | ae | oe | acs | Remarks: a uly aN aE Ad 8 ACovcemcio wocviort {visa THANIIN HEAVY INDUSTRIES & CONSTRUCTION CO, HANSIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. anole ws oA lcuzck sunt No. Page of AAA SAM Date Issued unic-pnu, | RESULT OF INSPECTION / TEST Pisa No P18 [ema tem —_HXPROTEST [7ST occion DEMONSTRATION Te oH BE ee 7 TANK HYDRO TEST 1LOGENERAL LUTEST DATE 12 ATTENDENTS : NK SHIP OWNER 2.0 TEST RECORD xo. bescrurtion pATEOF | aemanks T Nor WRC) OverrLow | 28419 | _AccePr 2 Noo WB-Tank Overrtow | 283 | ACCEPT 3 No.3 W.B-Tank (P) OveRFLOW | 28019 _| _ ACCEPT a No. S.W.B.Tank (S) Overriow | 2eturis | _ACCEPT 5 Nod W.B.Tank OveRrLOw | 26013 | ACCEPT 6 Nos DiB W.B.Tank P) ‘OveRFLOW [280013 | _ ACCEPT 7 Noa SWB. Tank (P) OveRFLow [260013 | ACCEPT 5 Nos W.B.Tank (P) OVERFLOW [2613 | _ACCEPT 9 No.5 D/B W.B.Tank S) OvERFLOw | 26auhi3_| ACEI 10 Nos S.WB.Tank S) OveRFLOw | 28013 | _accoPr 1 No.6 W.B.Tank (S) overrLow | 28uhi3_| ACCEPT 2 No DIB WEBTank (P) Overrtow | _28uh13 | _ ACCEPT 3 No W.B.Tank (S) OveRrLOw | 219 | _ACCEPT ue Fresh Water Tank (P) T7BAR TéAapris_[_ACCEPT 5 No2 WFO Tank S) TOBAR 25duni3 | _ACCEPT 16 Nos HO Tank (P) TSDAR Testunci3 | __ ACCEPT 7 TS HELOSERV. Tank) TLTBAR TreApela_[ ACCEPT rn THEO SERV. Tank (P) TSAR | 2®tebI3 | _ ACCEPT 0 DOSERV. Tank) TeBAR | _27-Mari3_[ ACCEPT 20 MELO. SET Tank ®) TOBAR TéMaris_| ACCEPT Daan Wane Tapp SO] ease] aoe recer_[Agmoveity | Owner | ctas_| auton aa - yaad bac [24 duly | 2€ 8] oa, | EE won Ya be wv heen At use Wexocviarr] V1 xm TIANJIN HEAVY INDUSTRIES & CONSTRUCTION COLTD, MANJIN HEAVY INDUSTRIES & CONSTRUCTION €O.LTD. HANOS WS HOTT [CHECK SHEET No. Page of we weary AMAL SAA Date Issued HHIC-PHIL RESULT OF INSPECTION / TEST. 31-May-13 a8 aNe= aNee Projet No. PN-082 | inspection tem “CC: LADDER | Tyee oF inspection DEMONSTRATION SMa FA ae ; aE Class/Authority NK | peps, QM [Place ON BOARP_| Weather/emp, c eal ACCOMODATION LADDER(P/S 1.0 GENERAL. LLUTEST DATE 1.2 ATTENDENTS : NK, SHIP OWNER 2.0 TEST RECORD © RESULT NO. TEST ITEM PorT | STBD 1 Load Test Ladder (4425 KG) OK OK 2 [Limit Switch Condition OK OK 3 Lowering Condition OK OK 4 | 55° Condition from Upper Deck OK OK 5 Hoisting Condition: OK OK 6 {Wire Rope Condition(Remaining) 31 rounds | 34 rounds 7 Manual Operation OK OK 8 Securing Device Function OK OK 9 Railing Installation Condition OK OK 10 _ [Insulation Resistance 1000 1000, Remarks: iam Ta ge BALE Pant & ae ae ‘oHSL2|al | Remarks ; as Dae [21 hay | ity! Lee] oP BONA oe SN ~ ea ee HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD. AAO] E Bis HTOTAT 2 CHECK SHEET NO. _ AAWAla SAM ued RESULT OF INSPECTION / TEST 24-Jun-13 a @ pus, 2NE= TIFERESCUE [BASH DEMONSTRATION Project No. Inspection Item __ BOAT_AND DAVIT | Type of Inspection_& LOAD TEST BAL aa SATS NK | Dept QM [place ONPOARP | Weather/Temp. Unit LIF CUE BOAT AND DAVIT TEST (P 1.0 GENERAL, LITESTDATE : 24-Jun-13 1.2 ATTENDENTS: NK, SHIP OWNER 2.0 TEST RECORD NO TEST ITEM RESULT, DAVIT OPERATION TEST WITHOUT LOAD. T_]_OUT-REACH FROM SHIP SIDE 10mm 2_[_ CONDITION OF LIMIT SWITCH OK 3_[_ CONDITION OF DAVIT LOCKING DEVICE OK 4 _[_ OPERATION OF 20° HEELING CONDITION, OK 5__[_ CONDITION OF MANUAL OPERATION OK LOAD TEST (TEST LOAD 5428.5 kg= 1.1 (2625 + 28 Wp) - Emp (2,964.5kg) | LOWERING SPEED : Min 52.62 M/MIN 53.76mv/imin 7_|[_ BRAKE CONDITION (3x During Lowering) OK 8_[_ HOOK RELEASING CONDITION(ON LOAD) (OK 9 | HOOK RELEASING CONDITION(OFF LOAD) ‘OK 10_|_LENGTH OF FALLS (WIRE ROPE REMAINING CHECK) 12 ROLLS T_|_LIFE BOAT STARTIRUN CONDITION (A/B Battery) OK 12_|_LiGHT Test OK 13_[_ MANEUVERING TEST OK 14_|_VISUAL INSPECTION AFTER TEST OK (RESCUE BOAT) DAVIT OPERATION TEST (TEST LOAD : 3120kg=Wb +6 Wp) 1 | RECOVERY DEMONSTRATION OK 2 | LOWERING SPEED : Min 52.62 M/MIN 53.01m/min 3. | HOISTING SPEED Min 10 M/MIN 19.03m/min 4 | LAUNCHING ATS KNOT (DURING SEA TRIAL) OK REMARKS: Lowering speed : S=0.4+0.02H(H=23.857) =0.877m/see Dene OM Witness / Approved by Remarks BAP Part & a= qa ase 5 Cocker | aporoved by | Owner Ciass__| Authority Sa ler vuly efor aye Laoses | 22d 23 CAE Maren vkooyiait |v Kin 7 QUANIINTIEAVY INDUSTRIES & CONSTRUCTION CO,LTD, HK i HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. MANE TS BOAT 22 ICHECK SHIBET NO. - Bascal ANA BAA Date sued RESULT OF INSPECTION / TEST 24-Junet3 ae PN-082 BNSS LIFE, aA DEMONSTRATION Project No. . Inspection Item BOAT/DAVIT _ | Type of Inspection_& LOAD TEST ‘Aree at BAL at aes ClassiAuthority —%K [Dept QM | Place ONBOARD | Weather/Temp. © Un LIFE BOAT AND DAVIT SPECIFICATION 1.0 GENERAL. LL TESTDATE : 24-Jun-13 1.2 ATTENDENTS: NK, SHIP OWNER WEIGHT OF EACH SANDBAGS 15 KG WEIGHT OF FULLY LOADED 4995 KG. WEIGHT OF BOAT FULLY EQUIPPED 2625 KG WEIGHT OF CERTIFIED PERSON (82.5/PERSON) WEIGHT OF EMPTY BOAT APPROX 2484KG, WEIGHT OF EQUIPMENT APPROX. 161KG. HEIGHT IN METER FROM DAVIT HEAD TO WATER LINE AT THE LIGTHEST SEA GOING 23.857M LOWERING SPEED: S= (0,4+0.02xH) (0.440.477) = 0.877m/s MINIMUM LOWERING SPEED = 2.62 m/min, ‘OVERLOAD TEST: 4995 X 1.1 = $428.5 5428.5 ~ EMPTY BOAT(2464 KG) 2984.5 KG / SANDBAG (15K) =197.68 PCS TECHNICAL DATA: Lifeboat Dimensions- Overall LLenath (Excluding Fender) = 5.90 m Beam (Excluding Fender) = 2.80 m Height = 3.00 m Capacity = 28 Person Weight Empty Boat = 2625k9 Total Davit load (28 petsons) = 4995 ko Speed (Solas 96)> 6 knots Winch Load = Max. 60 KN (Pull of Wire Rope) Lowering Load = Min. 20KN, Max, 60KN Dasign Condition = Heel 20° Trim 10° WINCH Working Load = 50 KN Hoisting Load = 27 KN Lowering Load Manual Working Load = 27 KN De OW, Winesat Approved Remarks ma | Pane a ae | aoe Checker | Approved by |__ Owner Glass] Authority oF nL Par ferouly | en uyy ray [20 | oe FEL vxoeyen | vittkim | sy tk ¢ ‘QHiANJIN HEAVY INDUSTRIES & CONSTRUCTION €0..LTD. HANJIN HEAVY INDUSTRI S & CONSTRUCTION CO.LTD. ASIA BS BOT ICHECK SHEETNO. Page of wear BAVA BAA Date issued RESULT OF INSPECTION / TEST 10-Jun-13 ae pn-os2 [EAE TIFF Ser DEMONSTRATION Project No. i Inspection tem BOAT /DAVIT _ | Type of Inspection _& LOAD TEST aNaaAT HA wa es ClassiAuthority NK | Dept QM [Place __ ONBOARP | Weather/Temp. ‘© Uni LIFE BOAT and DAVIT TEST (S) 1.0 GENERAL, LATEST DATE ; 10-Jun-13 1.2 ATTENDENTS: NK, SHIP OWNER 2.0 TEST RECORD. No TEST ITEM RESULT DAVIT OPERATION TEST WITHOUT LOAD ‘OUT-REACH FROM SHIP SIDE CONDITION OF LIMIT SWITCH CONDITION OF DAVIT LOCKING DEVICE (OPERATION OF 20° HEELING CONDITION CONDITION OF MANUAL OPERATION LOAD TEST (TEST LOAD :5,428.5 kg= 1.1 * (2625 +28 Wp) - Emp 6 _| LOWERING SPEED : Min 52.62 MIMIN 7_|_ BRAKE CONDITION Gx During Lowering) 5 a HOOK RELEASING CONDITION(ON LOAD) HOOK RELEASING CONDITION(OFF LOAD) T0_| LENGTH OF FALLS (WIRE ROPE REMAINING CHECK) TTROUNDS LIFE BOAT START/RUN CONDITION (A/B Battery) OK LIGHT TEST OK MANEUVERING TEST OK T4_[_VISUAL INSPECTION AFTER TEST OK REMARKS: comme - See Vepedvoy ve-tr sheer. fe Dene OM Winesd Approved by Remarks ae | me | a =] ae Crocker | anprovedby |_Owner_| Ct Autor a ert [aa | SUT " Elon: BY inbfliog | v.koogn Avett A QHANJIN HEAVY INDUSTRIES & CONSTRUCTION CO,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO..LTD. MATTE OS HOTA ICHECK SHEET NO. Page of wean AAVAL AAA Date Issued RESULT OF INSPECTION / TEST 10-Jun-13, ae pom [EAE TIFF ENS DEMONSTRATION Project No. Inspection item BOAT AND DAVIT | Type of Inspection _& LOAD TEST aaaT aT as eS Class/Authority NK | Dept QM [Place ON BOARP | Weatherrtemp. Unit: LIFE BOAT AND DAVIT SPECIFICATION 1.0 GENERAL LUTEST DATE : 10-Jun-13 1.2 ATTENDENTS: NK, SHIP OWNER WEIGHT OF EACH SANDBAGS 15 KG. WEIGHT OF FULLY LOADED 4935 KG. WEIGHT OF BOAT FULLY EQUIPPED 2625 KG WEIGHT OF CERTIFIED PERSON (82 5/PERSON) WEIGHT OF EMPTY BOAT APPROX 2484KG WEIGHT OF EQUIPMENT APPROX, 161KG HEIGHT IN METER FROM DAVIT HEAD TO WATER LINE AT THE LIGTHEST SEA GOING 23.857M LOWERING SPEED: S= (0.4+0 440.477) =0.877m/2 MINIMUM LOWERING SPEED (OVERLOAD TEST: 4035 X 1.1 = 5428.5 5428.5 ~ EMPTY BOAT(2464 KG) 2964.5 KG / SANDBAG (15KG) =197.68 PCS. TECHNICAL DATA’ Lifeboat Dimensions~ Overall Length (Excluding Fender) = 5.90 m Beam (Excluding Fender) = 2.30 m Height = 3,00 m Capacity = 28 Person Weight Empty Boat = 2625%9 Total Davit load (28 persons) = 4935 kg Speed (Solas 96) > 6 knots Winch Load = Max. 50 KN (Pull of Wire Rope} Lowering Load = Min, 20KN, Max, 6OKN Design Condition = Heel 20° Trim 10° WINCH Working Load = 50 KN Hoisting Load = 27 KN Lowering Load = 30KN Drum Capacity = 2x608 Manual Working Load = 27 KN Dap OM, Wiese / Approved ty Remarks mr | rane ae ae | cee Checker| Approved by | Owner Cy, | Authority Dae [lo vemectl fey th MY ace sles | vices [Se “QUANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. ANHIN HEAVY INDUS IES & CONSTRUCHON COLD, 2.0 AIR VOLUME TEST LITESTDATE: June 11,2013 12 ATTENDENTS: SHIP OWNER Wana we aH Heck stk TNo, Page of AAA SAA a HENC-PHIL, RESULT OF INSPECTION / TEST 11-Jun-13, Sate man [Oe URVOLUME CHECK [S2ER _omnoxsearion Gin Aur NK [Don ou Pace oxwoand _[Wreter Tenn © IR VOLUME TEST FOR AIR CON. SYSTEM LOGENERAL pores ied Vimisy [voum [TOTAL voum') | TOTAL CRT Bat au eee oa 29 aw. wesc ait Ta S TE TOES aa a3 me TE HOUSE art Bat Te EET 7 v7 RADIO SPACE? 5 = 1703 = ae we THs CHART? 187.5 eel 173.89" we aa ROT 73 Te ELEC EQUIP ROOM? 120) ay 178.13 3 TT Tar caPANDn¥ KOM Tia] 386 Ta] a TT a aR ep TsE67—[ ” aR Ter waa7 [os beck THOT Tae 138 193.68 19 Ti To CinerENaNEE Dy HO Taw] 36 ra] a Ti el TaeRaRT 13 TET LOCKER? BTS 5 652 184.35 sil TATE TOOT a oe oo Tas ily wa aa a] 22 SSS as oT pate fle 1-204) W-gwne-| M[Sorifres’ wa aE sone TANTIN HEAVY INDUSTRIES © CONSTRUCTION COLTD- ae IF j Xie vONG, [CHECK SHEET NO. Page of BAVA waaa HAVA St AAAL Date lssuedl a RESULT OF INSPECTION / TEST Hunst3 aw nas wise PN-082 eae AIR VOLUME CHECK DEMONSTRATION Djs No Inspection tem Type o Inspection enwenie aA as wee NK on oy noaRD Class Authoriy Dept Place WeatherTemp. © a oni DESIGN KCTUAT Ss Leases Youn] TOTAL WOLm"m) [|_TOTAT CREWS HESS ROOHTT Tas 309.09 CREWS HESS ROOHT? Tes] 580 Bost] eee CREWS HES ROOT Test a7 TRENT TTT Tr : CREWS PANTRY > Toa 5 208 20 CALTEYT * GaEV? 3 GALLEY aw] as TBI] 39574 GALLEY 7 017 GALLEYS a THe "pe DECK OHS PANTRTT 17 : aaa OFFS PANTRY > Tn 235 Ta ST 286 TERS HESS ROOT roe ast COFFERS HESS ROONT? TES] 580 Toe] eo FFT ESS ROOMS 35 Tizo1 CREWS RECREATION ROOWT Troe TaD CREWS RECREATION ROW? TMB] $12 HAT] 87020 CREWS RECRTATON OOH rae Srer ‘OFF RECREATION ROOMY 533 36295 OFF RFCREATION ROOM BHT] 760 TG] so1se ‘OFF RECHERTION ROOHT E555 36719 HOSPITAL 26.66 TOIT HOSHTALT eee] sto Teri] 708.5 HOSPITALS ewe ara DAY PROVISION STORE Be | 95 054 —| 2038 an peck WRNASTMT BS 35730 ‘YMNASTUN BS] 70s BET] 71896 ‘GHMNARTN 3 3025 BONDED STORE 60] Tan Tr67 | Tee TALLY OFFIC 39] a9 Bea | 31 TRGNCERS OFICET TI] sog non] — 55 ENGINEERS OFFICE? 9 ma] DECK SPS OFICET Bas 3ea55 surrens [Tosca ars onice? Bes 3a] BT DECK DECK & SHIPS OFFICES 236.5 = 9.10 25730, 1088.68 DECK EIPS OFT Bas 330—| 268 FIRE CONTROL STATION Ts ear—[ “17031 FIRE CONTROL STATION 2 Bs am 6.15 T7389 MM I Winey a ae | pa a aa | ware | Renate cincter_| Anvovedty | __Onner ccs | Autory WA y Seif, B vosie Mune 1-209 |)- Jame TIANTIN HEAVY INDUSTRIES CONSTRUCTION COLTD, MANN Hh: VV INDUSTRIES & CO} RUCTION CO.LTD. ATE wo [CHECK SHEETNo, Page of wear AAVALa SAA Date Issued ic-Pu RESULT OF INSPECTION / TEST ibe pxcogz | BNE urvonoececk [218% DEMONSTRATION Projet No. lnspeetion tem Type of Inspection aaeere eA ae wee Clas/Autoriy NK | dep ow Place ONBOARD | seater Temp, 2 9 Line DESIGN NCTUNE LOCATION ROOM NAME: Viaws) [vounrmn| TOTAL [Via | voun'm | TOTAL TENG DAYROOMT—[—4ez [os |~ 55, [sao [1399 TENG. DAY ROOM? | 462] 0s 590_[ 16682 ENG. BED ROOM aot |__| sates] ZENG ROOM 597 [es | 68 [6a | 19207 | 192 . OFF BEDROOM 594 [108 [108_[ 670 | 100.48] 109 beck ‘GOFF BED ROOM +o7 a2 132, 582 TSG 165, OFF DAY ROOM 4a [ms [saree] ‘COR _DAY ROOM? xa [has 30 | 108s LOCKER 498 [0 |__| 600] 109.65] TOR Day ROOM 9a [aes [008 [8337 TOF_DAYROOM? 3.6 | —26r 1030_[ 29135 i Bas Tae [eas [af 8s MM) S38 1s [6s | est) MRI) 53 130 [670] 9.8 | 189 TITER 5a 130 | 690} 19809 | 19s “yr TIFTERD 531 13 [ 666 | 1881 | 18 peck CADET Sa 150 i9227_| 192 CADET, 5 152 19509 | 195 Eig 523 a 19631 | 197 SET 180396 32 28 22 | 3 Twa Te ist70_[ 15 oD. 152 19227 | 192 asin is 19507_|__15 ose) 9 9085 [191 055) 182 13520 | _185 ABI 135 Tae02 [19 "Br 182 19285_| 195 apo 8 inte [175 COOK TR COOK = isai0 | DOSNT 1096] 5 HOSEN 13520 Dep OM Wines Aro a2 wae] Pane oF ee ETE] Remar Chseher_| appovedty | __Ovags tes] Auer a Wime/mors ove | nea-104 jegune | Kire/~1 wea ay ae FS TANIA HEATY INDUSTRIES © CONSTRUCTION COTO. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO..LTD. HOT CHECK SHEET NO. Page of a Aw Sur AAvALe SAA Date Issued HHIC-PHIL RESULT OF INSPECTION / TEST 26-Jun-13 ae 7 APES FIRE LINE WAS Broieet No PN-082 | inspection item _ SHOOTING TEST | Type of Inspection _PFMONSTRATION Area ae eA aa aE Ciass/Authority NK | Dept QM [Place __ ONBOARD | Weather/Temp, xc Uni FIRE LINE SHOOTING & WATER SPRAY TEST 1.0 GENERAL LI TEST DATE 26-Jun-13 L2 ATTENDENTS ; NK SHIP OWNER 0 TEST RECORD 2.1 FIRE LINE SHOOTING FIRES GS |FIRE & BILGE] EM'CY FIRE ITEM PUMP SIDE PUMP PUMP Pup PUMP SIDE GuclDischargs) | O2s/okgiena | O2s/oKgfend | O2Dketon2 PRESSURE [NAV.BRIDGE DECK (ke/ai) | S6kgiiem2 | Gtkgtioma | 4.skghome LE DECK (kg/ct!) 7.0kgtiem2 7.25keflem2 5.9kgflem2 INAV.BRIDGE DECK OK OK OK pump [PIRECONTROL STATION ox ok ox ON/OFF | E.C.R oK OK | | CONDITION) PUMP SIDE, OK OK OK IEM'CY GENERATOR ROOM, OK 2.2 SEA WATER SPRAY NO. TOCATION VALVENO, RESULT 7 PAINT STOR! wOss OK REMARK: Aree ditcharge adh peste deck Wewg, deck , 9/6 Np Deck aap Wines ppg 1 BA Part & ae ‘4 S7/ B+ | Remarks chester Aporved’s | _ Owner Atty oat er nae [PP daly BB | orreupi B21} Puy AN F By lio NG [v.kocvierr| _vuKIM HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO..LTD, AACE HS HOTAT CHECK SHEET NO. Page of BS Sra ) ZAWALE] BIN wee SAWALE Sata Date Issued Hinic-PHIL. RESULT OF INSPECTION / TEST 06-Jun-13 aw APES aS Tt Bruise No. PN-082 | inspection em —__YR-CS- Type of Inspection __TIME SETTING Aa Te FAT as SMS Class/Authority SK [ Dept. QM | Place ON BOARD weather Temp, cS Oni VALVE REMOTE CONTROL 1.0 GENERAL LAL TEST DATE : 06-Jun-13, |.2. ATTENDENTS : NK, SHIP OWNER 2.0 TEST RECORD 2.1 OPERATION TEST — 7 TIMESEPING] ACTUAL TIME NO. DESCRIPTION NO. OFVIV BASIS CLOSE | OPEN 7 [Bao NO.1 WB. (CENTER) 350A 1030 2007] 180s > | wave WBLINE MAIN FWD DUCT 3508 a 2805 | 2703 3 | BAGS NOIWATS) 250A 10-30 75.08 zi + [Bava NOIWBTP) 250A 10-30 1806 | 1707 5 | aos NOSSWBT(S) 250A 10-30 21 707 6 | BAoS NO.3 S.W.B.T (P) 250A 10 ~30 22.03 17.07 7 | BAO7 ‘NO.3 W.B.T (S) 250A 10 ~ 30 20.09 18.08 8 | Bags. NO.3 W.B.T (P) 250A 10~30 17.09 18.03 9 [Ban NOASWBT®) 250A 1030 e056 | 1707 10 | BAIZ NO.4 S.W.B.T (P) 250A. 10 ~30 15.05 18.02 11 | BAI3 NO4 W.B.T(S) 250A 10~30 17.05 16.05 72 | Bas Nod WRT) 230A, 10-30 8 13 [Bais NOADBWB.T(S) 250A 10-30 9 1709 1 [Bate NOs DBWB.TOP) 250A 1030 2106 | 18.06 15 | BAIT Noss WATS) 250A 10-30 2 2007 16 | BAIS NOSS.W.B.T UP) 250A 10-30 9 17.09 17 [pais NOsWBTS) 250A, 10-30 23.08 31 Den OM Winesed/ Approved by aa aim | rnd | Se | Sa [are] Remarks checker | Appoready | onner | cass | authority an POG [ee _leannne-ro| ve-sue- POE Ear i |< By umfloxe | xi vous HANAIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AOE TS TTOTAT CHECK SHEET NO. ascot seer AVAL BAA S BAVALE SM Date Issued HHIC-PHIL. RESULT OF INSPECTION / TEST 06-Jun-13 aw ZTE Ee Beviet Nos rae Lnspection hem VRS. __[ Type ot nspection aiveseTaiNe! 2 Nae as aE aS 7 Class/Authority NK | Deot. QM | Place ONBOARD | Weather/Temp. : eral Unit; VALVE REMOTE CONTROL vw DIAMETER [TIME SEFHING] ACTUAL TIME No. DESCRIPTION No. Orviv BASIS CLOSE | OPEN 18 | BAx0 NOSWBT) 250A vo-30 | 2106 | 2008 19 [waa NOSDBWRTS) 250A 10-30 17.06 30 | BARD NOs DBWBTy 250A 10-30 18.09 ar | Bans NOS WB.TS) 250A 10~30 77.96 = | Ban NOSWH.TP) 250A 10-30 oar 3 | BADs NOSDBWETS 250A, 10=30 672 24 | Baze NO6DB WB.TP) 250A 10~30 1533 35 | BA3® NOTWB.TS) 2508 10-30 2 8.08 26 | BAO NO.7 W.B.T (P), 250A, 10 ~30 19.01 17.04 27 [WDst| __BG EDUCTOR (CHNO3 PASSAGE) 150A 618 Tas | 110 28 | FOOT NO.1 L.S.H.F.O. (8) 200A, 8-24 11.09 16 2 | FoR NO.2HFO(P) 200A oe 1606 [1503 30 | FOU NO.2HFO(S) 200A $24 1706 | 1405 31 | ous NO.3 FO) 2008 $m 1509 5 32 | ous NO. AFO(S) 2008 1505 | 1408 3 [Avior TIFO OVERFLOW MAIN(P) 250A 7 1502 au [Avion HFO OVERFLOW MAIN(P) 250A 18.02 16 35 [avios HIFO OVERFLOW MAINS) 250A wo=30 [2608 | 2403 36 [Avis TFO OVERFLOW MAIN(P) 250A 1030 9 Tez 37 [avios HFO OVERFLOW MAINS) 250A 10-30 15 7405 NOTE 1. LO VALVE AND AV VALVE IS CONTROLLED AT EGR. ONLY 2, WD & B.G VALVE IS CONTROLLED AT SHIP'S OFFICE ONLY 3.B.A. VALVE IS CONTROLLED AT ECR. AND SHIPS OFFICE, 4, WHEEL HOUSE ; MONITORING ONLY Da Winesed Approved] BARE Part 2 a ‘8H 17/2 | Remarks: Coeeter_| Approvedy | _ovnee | class | authors at t Dae [ee -unne-nl cb sie [Bens ‘welat Lz ‘ ay « Aba ublhe HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD, AAWALE SAA AAT ES AS EOTAT |CHECK SHEET NO, Page of Tear Date Issued HHIC-PHIL RESULT OF INSPEt [ON / TEST 06-Jun-13 qe TPE ANS a Lee Mirae TN [fren ten YRS Tipeaomag — TMESETINE ClasvAuthority NK | Dept. QM __| Plage ON BOARD Weather/Temp. c tine VALVE REMOTE CONTROL, 7 DIAWETER [Th SETTING] ACTUAL TIME xo. DESCRIPTION No. OF VIV BASIS: CLOSE, ‘OPEN 38 | BGT CARGO HOLDNO(€) BA 3-15 3 508 9 | Boo CARGO HOLDNO.(C) 125A sor | 802 0 [B60 CARGO HOLDNO2(5) 5A sas a ar [ waos CARGO HOLDNO2(P) 125A 515 906 | 908 2 [ BG0s CARGO HOLDNOS(S) 125A ss 204 9 BGOG CARGO HOLD NOS(P) 125A) 5-15 8.05 7.06 4 | Ba07 CARGO HOLD NOAYS) FWD 125A 02 | 708 «5 | Baus CARGO HOLD NOA(P) FWD 125A sas a 46 | Ba09 CARGO HOLD NOA(S)AFT 125A 908 | 8.09 a7 | Bao CARGO HOLD NOA(P) AFT 125A 5 907 o we [Ban CARGO HOLD NOS(S) 1258 5=15 904 [808 «9 [Bor CARGO HOLD NOS(P) 125A sas Tas | 1006 50 [was CARGO HOLD NO(S) 125A Sa 15 7a) 737 31 [pais CARGO HOLD NO6(P) 5A so5 8a a3 2 | Bars CARGO HOLD NOT1S FWD 150A oa I8 To.6 B 3 [pate CARGO HOLD NOT P) FWD 150A nis 2.06 | 1203 si [Bar CARGO HOLD NOI (S )AFT 150A 18 nsf 1r03 5 [pais CARGO HOLD NOI P)AFT 150A oni 07) 107 56 | Rave PIPE DUCT FWD 65, a2 906 | 5083 Da ow Wines Apoeity a= aan | ome | Us | Sa [a7 | Remats Checker Approved by Owner Class Authority Daw | done-pa) ue jacty| on3 sy21 3} \ sS HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD. MOTE oe WOT Ti CHECK SHEET NO. Page of 5 weut AMAL SAA Date Issued HHIC-PHIL RESULT OF INSPECTION / TEST 28-Jun-13 aa ae ANCHOR AND SASF Project No. PN-082 | inspection Item __WINDLASS TEST _| Type of Inspection OPERATION TES Abarat Tae aA ae Sues Class/Authority NK [Dope QM [Place __ONBOARP__ | Weather/Tremp. 2 ANCHOR AND WINDLASS TEST 1.0 GENERAL LI TESTDATE: — 28-Jun-13 1.2 ATTENDENTS : NK, SHIP OWNER 2.0 TEST RECORD Depth of water 83M. TRIAL RESULT Deseripti Port Anchor/Windlass Starboard Anchor/Windlass [Total Chain Length 110m Hom Length of Chain Dropped 4 Shuekle 4 Shuckle Time to Hoist Two Shackles(Ftom 3rd to Ist) sm sm |Average Hoist Speed (Min. 9M/MIN) 10,1Sn/min or 0.17m/see 10.13mv/min or 0.17misee. IMotor Ampere 1108 Hoa, FUNCTION CHECK |Chain Lowering Condition OK oK |chain Cable Counter oK oK [Brake Condition oK oK {Chain Compressor oK oK Hoisting Condition OK oK ISlow Down Function oK oK JAnchor Stowing Condition oK oK |Chain Securing Condition oK oK INozzle's spray condition oK oK Dept OM, Winnessed7 Approved by aa wan Pat oF Ge | ele | Remarks Checker _| Approve by lass | Authority aa Tt? Date Pidaty I> ouguly 3 ws LE [ CONCEPCIO} v.kocyrart| _y.#.kiM HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AAS aS Moray 22 |CHECK SHEET NO. Page of Z a Aam wsant A AVAL SAM Date Issued tuucpun | RESULT OF INSPECTION / TEST 2Atun-13 ae aNee WINDLASS / MOORING] ANS Project No.__PN-82_| inspection Item _AUTO TENSION TEST | Type of Inspection _ FUNCTION TEST BAe et NK [eat - 22 ongoarp | P4ZE Class/ Authority Dept. Q Place Weather/Temp, ec ee] Unit SAFETY FUNCTION TEST 1.0 GENERAL LITESTDATE: 24-Jun-13 1.2 ATTENDENTS : SHIP OWNER 2.0 TEST RECORD E-MOTOR Q (% RATED LOAD) | I (mA) REACTION REMARKS 7 After 1.5s, overload alarm 20 168 will light up oK Gist & 2nd After 2s, overload alarm 130 20 | will light up and E-motor oK will switch off ill be switeh to lower speed(2nd speed) and overload alarm will blink (b)3rd step 20 6.13 |If the speed lover of control oK stand will be changed to 2nd step, overload alarm will switeh off Dept QM Witnessed / Approved by ua BA Part @ ae ag eae71a | Remarks: Checker| Approved ty | Owner cis | Authority wa pate?) duly 8 Jor gays [Ze wan [oe Bw HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO..LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. OLE Bhs HOH 7 |CHECK SHEET NO. Page of A SA BSur A AVAL SAA Date Issued tiucpm | RESULT OF INSPECTION / TEST 03 June13 aw ates WINDLASS / MOORING] @A;S 7 Project No. PN-082 | inspection Item __ WINCH OPERATION | Type of Inspection OPERATION TEST aeera eA ae SASS Class/Authority NK Dept. QM Place SHIECRED Weather/Temp. c ela Uni WINDLASS / MOORING WINCH TE! 1.0 GENERAL_ LITESTDATE: — 03-Jun-13 1.2 ATTENDENTS, IK, SHIP OWNER 2.0 TEST RECORD. TRIAL RESULT LOCATION NO. |Wind Up and Slack Down], Clutch Continues a Engagement &| — Running Condition ; os Disengagement | Condition wi OK OK OK WINDLASS we OK OK OK M1 OK OK OK M2 OK OK OK MOORING WINCH Ms ok OK oK M4 OK OK OK Remarks Dane OM Winased Approved by aa AE Part & ae ae @HE7|BE | Remarks Checker | Approved by | Owner | class _| authority an Mune of Due fe-sene ta SCZ | Lo spuse2oth 7 Zr”? Hela F Le— °G. Cabiteu | Y.. Kin HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD. WE eS CHECK SHEET No. Page of x ESurt AAALE SAA Date Issued HHIC-PHIL, RESULT OF INSPECTION / TEST 20-Jun-13 ae aS aNeH ‘OPERATION AND Project No. PN-082 | inspection Item ELEVATOR | Type of inspection LOAD TEST ZAzeai AT Be Saree Class/Authority NK | dept QM [Place ON BOARD | WeatherfTemp. © ea U ELEVATOR 1.0 GENERAL, 1.1 TEST DATE: 20-Jun-13 1.2 ATTENDENTS : NK, SHIP OWNER, MAKER 2.0 TEST RECORD 2.1 Load Test Load Upward Downward % WY | Voltage | Current | Speed | Voltage | Current | Speed (kg) ”) @) | Gaimim |) (A) | Ga/miny 0 448 54 30.08 448 47 30.25 50, 180 448 484 30.22 448 5.38 30.25 100 360 448 6.37 30.23 449 AT 30.12 CURVE OF LOAD TEST + UPWARD = DOWNWARD. CURRENT (A) ° 50 100 LOAD (ke) Dept. OM Witnessed / Approved by aa AAP Checker Part ae Na ae7iat Approved by | Owner Class | Authority aH che lower Date [POE fe te aa | y Remarks : LILLE v.kocyiGrr] HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD, HOA Page of 28 a Ay AAALE SAM sued RESULT OF INSPECTION / TEST 20-Jun-13 > EMER Se ‘OPERATION AND PN-082 Inspection Item BLEVATOR, Type of Inspection LOAD TEST EA Be See Class/Authority NE Dept. QM Place ONBOARD: Weather/Temp. c Unit ELEVATOR 1.0 GENERAL 1.1 TEST DATE: 20-Jun-13 12AT IDENTS : NK, SHIP OWNER, MAKER 2.0 TEST RECORD 2.2 Governor Test Catch Operating Speed Car side 83.11 m/min Counter weight side 75.87 m/min 2.3 Level Test Load 0% 50% 100% Landing Error 0% mm 0% mm 0% mm Dept OM Winessed/ Approved by ale aan | pane | ae se | aeviat (Remarks: Checker| Approved by | Owner | class | Authority mat HVitsie: - doh} pae _[2edmele | oy be Z| a Conehrerent—iLee [CKocyiGtr HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HEAVY INDUSTRIES & C 7 - [AaE es CHECK SHEET NO. Page of a8 AAAS AAAI a Date Issued HHIC-PHIL, RESULT OF INSPECTION / TEST 20-Jun-13 Giaswautnorty NK [Doo aM [insce ONBOARD [Westhevtemp. 2.4 Inspection of operating devices No. Items of Inspection Results 1 |Confirmation of limit switch and over travel limit switch operation ‘OK 2. [Hall button and car button operation OK 3 Emergency signal device operation(Emergency bell) OK 4 [Emergency stop button operation OK 6 [Door interlock operation ‘OK 8 [Landing door able to be opened from outside by a special key ‘OK 9 |Condition of landing OK 10 [Emergency stop device operation when escape hatch was opened (Interlock) ‘OK It |Emergency light OK 12 [Rolling / Pitching test ‘OK 14 |Overload alarm OK 15 |Pire Alarm OK 16 |CO2 Alarm OK 17 |Telephone (interphone )Test OK 18 [Abnormal and Emergency call alarm test OK 2.5 Temperature Test Earth-Megaohms Limit of a Ttems Cool I" Hot Success temp. Rise I Starter core motor 30.6 32.9 YES 20°C 2 | Gear oil casing of traction machine| 30.9 33.4 YES 30°C 3 Controller 30.4 314 YES 25°C 4 Machine room 30.2 31 YES Below 50°C BAL Part 2 ae a2 BHEt2|2 | Remarks _ te ge ‘welt | ea BY fu JH.LEE * V.KOCYIGIT| HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LID. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AaE os T CHECK SHEFT NO. Page of % aSest BWA SEAL Date Issued HHIC-PHIL RESULT OF INSPECTION / TEST 14-Jun-13 a 2e= Bee ‘OPERATIONS LOAD Project Ne RN-G82 Inspection trem: MONORAILV/GRAN Type of Inspection TEST peerereore Say a EE Class/Authority NK | Dept QM [Place ONBOARD | Weather/Femp = rat Unit 10 TONS MONORAIL CRANE 1,0 GENERAL 1.1 TESTDATE: —U4-Jun-2013 1.2 ATTENDENTS ; NK, SHIP OWNER: 2.0 TEST RECORD: 2.1 OPERATION AND LOAD TEST NO. ‘TEST ITEM ‘SPEC, RESULT “OPERATION TEST WITHOUT LOAD T HOISTING = OK 2 LOWERING - ox 3 TRAVELLING ox 4 LIMIP SWITCHES ox S_ENDLIMIT - ox OPERATION TEST WITHSWL (0 TONS) FORT St 3 HOISTING SPEED (I0m/nin ave) 10% oe 6 LOWERING SPEED 125% 5% {én 13a 7 TRAVELLING SPEED (10 m/min) 10% 5% 1066nmin 8 BRAKE TEST Aor MORETIAN WOFTMELOWERNODITANCE OK ‘OVERLOAD TEST (1a5NSWI= 125 TONS) 9 HOSTING IM REST 60 SEC OK 10 LOWERING 2M REST 60 SEC. ok 11 TRAVELLING AND TRANSVERSING - ox. 12__ LOAD LIMIP SEPTING AT SWL X 125 125 TONS ok REMAR Dan Ow Wine approed oy aa Bas | vd | ae | aa | waza | Remarks Checker| approvedty | Owner | cls | Author oF Nine. dae _|Itvone-}s ors | yay” wera Z 8» ficoxtrnconl niuse AK KocviatV BaLAncto |ANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AaATOe els HOTT 71 ICHECK SHEET NO. Boe AAVALE AAA Date Issued RESULT OF INSPECTION / TEST 31-May-13 es pnosz [242 r.o.Hose pavir | oS FUNCTION TEST Project No, Inspection item “Type of Inspection Zaae ae wa Ba AEE Class/Authority OWNER | dept, QM [Place ONBOARD | Weather/Temy F.0.HOSE HANDLING DAVIT (0.9 TON) 1.0 GENERAL 1.1 TEST DATE : 31- May-13 1.2 ATTENDENTS SHIP OWNER 2.0 TEST RECORD NO TEST ITEM PORT ‘OPERATION TEST WITHOUT LOAD @_|_EMERGENCY STOP OK T_| LENGTH OF FALL (WIRE REMAINING CHECK) TT ROUNDS: 2_|_LOWERING & HOISTING OK 3_|_ SAFETY DEVICE FUNCTION (LIMIT SWITCH) OK ‘OPERATION TEST WITH SWL (0.9 TONS) @_|_HOISTING SPEED (IOM/MIN) T.36MiMtin 3_| LOWERING SPEED(TOMIMINY T153M/Min, 6__|_ MANUAL OPERATION OK 7_|_ BRAKE FUNCTION OK ‘OVER LOAD TEST (1.254SWL= 1.125 TONS) 3__|_ STEADY CONDITION AT OVERLOAD @ SMIN OK Remarks: Dept. QA Witnessed / Approved by aaa [Pan ae WE] ASE] Remarks Checker | Approved by | Owner Class | Author a > dae fet May-afiety ty [2x60 BY Bla Nay GQ HANJIN HEAVY INDUSTRIES & CONSTRUCTION COLD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. Mao e ae OAT oO CHECK SHEET NO, Page of na eee BAVA SAA Date lssued huicpu, | RESULT OF INSPECTION / TEST dune13 a prosy [2AeE FOHOSES SUEZM, | GAPE ‘OPERATIONS LOAD Project No. +082 [inspection item BOAT DaviT__| Type of Inspection TEST anal a |B m [22 onpoarp | 22= e Class/Authority Dept Q Place ‘Weather/Temp. a al Unie 4.0 TONS SUEZ M. BOAT DAVIT 1,0 GENERAL, LITESTDATE: 11-Jun-13 1.2 ATTENDENTS : NK, SHIP OWNER 2.0 TEST RECORD. 2. OPERATION AND LOAD TEST. No, ‘TEST ITEM SPEC. RESULT OPERATION TEST WITHOUT LOAD HOISTING TOP/BOTTOM LIMIT oK | SAFETY DEVICE SLEWING SLEWING LIMIT oK LUFPING UP/DOWN LIMIT oK "EED (to Right/Left) 0.5 pm 1.61RPM 3 abl. 45 SECI35.5°-71.3 AL IT SEC. OPERATION TEST WITH SWL (4.0 TONS) 4 HOISTING SPEED 0-10 m/min 10.58MMin 3 BRAKE TES oK 6 WING TEST oK lEMERGENCY OPERATION (Power off Position) 7 EMERGENCY LOWERING OF LOAD z ox 8 EMERGENCY LOWERING OF THE JIB = oK 9 EMERGENCY SLEWING OF CRANE. é (OVER LOAD TEST (1.25XSWL=5 TONS) 10 OVERLOAD TEST ~ ok L_LOAD LIMIT SETTING AT 4.5 TONS S ow REMARK. Den OW Winessed7 Approved by ua aa | Pane Sa | ASI | Remarks Checker _| Approved by class | Authority BS [ies] 2604-3] 1h 85 | BS wn ge w “oan : Concter M.W Lit FT xocwagy Wx HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.L1D, HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AAAS AS HOTT |CHECK SE TNO. Page of a Ieces| wee AAAI as AA Date Issued Hore FHL RESULT OF INSPECTION / TEST 20-June3 a pn-og2 | a8 pitce suction | 845 DEMONSTRATION Project No. Inspection Item Type of Inspection, BAe et BAT at Saez ClassiAuthoriy NK [Dept QM [Place ONBOARP | Weather/Temp. eral Unit BILGE SUCTION TEST 1.0 GENERAL LL TEST DATE: 29-Jun-13 1.2 ATTENDENTS ; NK SHIP OWNER 2.0 TEST RECORD. |NO.| LOCATION had PUMP |NO.| LOCATION, = PUMP |RESULT| 1 fownorcey [BGor] rneecs [OK | 15 fomnorcsyrwo] Bars| raeaonce | OK 2 founerccy [poor] rmceos | OK | 16 fomno7crywo] Bore] rneanuce | OK 3 fomnoacs) [paos| rrceos | oK | 17 fomsorcsirr| parr] naceonce [OK 4 |CHNo.2(P) BGO4 | RE kos OK 18 |C/HLNo.7(PIAFT | BGI8 | FIRERBILGE OK 5 founoacs) [aos] races | oK [19] Pipeducma | BG99|rncamncce] OK 6 founoscey [pcos] racecs [ OK [20] Pipedusan [wore] reac | OK 7 [orineacswn] pGo7| races | OK [21] Noawioe) [ac2o] waa | OK & fonineacrrwn] pGos| races | OK | 22| NoavidS | paw | awa [OK 9 fomnoacsvar | pcoo] receos | OK | 23[ Boss) | BGe2] Ea | OK 10 fonssoacrrart [aato| rinceos | OK | 24 | Camentersiop | G63] Fduvor | OK it femnos(s) [pert] neeonce [OK | 25 franca ampsonl Boss] Educor | OK 12 femnoscr) [Gra] nacwouce [ OK | 26 |crintocer [Rass] Edo | OK 13 femnoscs) [pois] emwocce [OK | 27 |romreavoa | pGo7| caucor | OK ia femnoscr) [acra| recancoe | OK | 28 faowtwacre.[ aces] Facor | OK Dens Ow Witnessed Approved by aa aan | pane | ae Te | ASe | Remarks Checker | Approved by | Owner Class | Authority aa Rh.2d? Date }Of Suby 13. fF oa ae A on By econo wsocicn| _yauKiM HANSIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AAAS HS HOT Esa o ANATE SAA Bacau wnicun | RESULT OF INSPECTION / TEST O5June13 a 8 aes aee 7 Project No. PIN-082 | inspection Item PILOT DOOR | pe of Inspection OPERATION TEST aNaee Hf az SEE Class/Authority NK Devt. oi Place ONEGSED Weather/Temp. c et tn PILOT DOOR OPERATION TEST 1.0 GENERAL 1.1 TEST DATE 05-Jun-13 1.2 ATTENDENTS : NK / SHIP OWNER 2.0 TEST RECORD 2.1 Opening Operation by Hydraulic Unit (60 seconds) REMARKS OPERATION TEST LOCAL INDICATION Lamp) Port [StaRBOARD Opening by ydrauie Motor Bese | Tse Power Whte(ON) . Main Powerand Motor Heater tobe] Contol Source = White(ON) [switch ON Hyd. Heater «+ Blue (ON) OK bad Rel Hear = Blue (ON) Thal eater Ble OFF 5. siydutie Pump tobe switeh ON fel Heat ~ Blue (OFF) ox ox [Clear Unlock Push Burton Cher Unlek = Rea ON) OR OR 5 Door 10 be open by Push Ratton Door Open =Red ON) OK OK [6.Ladder Down by Push Button ‘Ladder Down -- Red (ON) OK OK [?. Turn Off the Hydro and Main: OK ‘OK 22 Closing Operation by Hydraulic Unit (60 second) REMARKS OPERATION TEST LOCAL INDICATION (Lamp) PORT [STARBOARD Closing by Hydraulic Motor Tos see | aloe B. Tum ON Fjdro and Main Power OK OK B. Wind up the ladder by Push Button | adierup = Gren OND OK OK [Clarify the Cleatook Red(OND OK OK 5. closed the Door by Push Burton Door Closed Geen OND OK OK [cack te Door by Cleat Lock push oR oe Button ‘Motor Running = Green (OFF btu Ofrthe Hydo and Main Power] Hyd#eaer~ Blas(ON) ok ok Ree Hear Blue (ON) Oa Wane Apply az mas [pe | Se [sa | abi [Roms Grecer | sppoedbs | Omner_| cas | Antaris aH . —— “ foamy we? | acr [pA ml ZA = - ZA |Z | ae HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. RAATOTE We OA Jcurck SHEET No Page af rh AAAI SAA Bate sued uuuc-puu, | _ RESULT OF INSPECTION / TEST 05-Jun-13 ca TEs THEE Saloni Project No, PN-082 | inspection Hem PILOT DOOR | Type of Inspection OPERATION TEST ENae AT =a) aE SES Class/Author NK | Dept QM [Place ONBOARD | Weather/Temp, ro a PILOT DOOR OPERATION TEST 3.1 Manual Operation by Emergency Hand Pump (180 seconds) REMARKS [Emergency Operation Opening peney OD pening PORT | STBD inergensy Opening by Fandpamp 5S | See T Release the safety bar installed at the pilot door 2. Install the hand lever atthe hand pump 3. Turn the manual override to push Y3 solenoid valve tap. And unlock the door clea using the hand pump. 4. Turn the manual override to push the YI solenoid valve tap. And open the door completely using the hand pump. 5. Install the safety chain assy at the side coaming, 6, Install the temporary rope guide at the bottom coaming ox | ox 7. Spread the ladder down following the procedure below - Release the hand lever stored at the ladder ree! Fite hand lever onto the motor shaft thorough the hole atthe center of the ~ Spread the ladder down by rotating the ladder reel using the hand lever 8. Install the Temporary hand rail atthe bottom deck 9. Remove the safety chain assy atthe side coaming 10. Remove the hand lever from the hand pump and the ladder reel REMARKS, Emergency Operation Closing vort | stan Emergency Closing by Handpump See | 60Se T. Fit the hand lever onto the hand pump and the ladder reel 2.install the safety chain assy at the side coaming, 3.Remove the Temporary hand rail atthe bottom deck 4.Wind up the ladder by rotating the ladder reel using the hand lever 5.Remove the temporary rope guide at the bottom coaming ‘6.Remove the safety chain assy at the side coaming 7.Tumn the manual override to push Y2 solenoid valve tap. And closed the door using the hand pump. 8.TTurn the manual override to push V4 solenoid valve tap. And closed the door using and lock the door using the hand pump 9. Remove the hand lever from the hand pump and ladder reel and store them at norm] position 10, Return the safety bar to the oFiginal locked position, ox | ox Dept QM ‘Witsessed Approved by ue wan | rae | Ne aa | ately [Remarks checker | Approredby | Oxner Coase showy aa bae_prosme sol fee | gar tN | 6m ae LM Kel HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. rar |CHECK SHEET NO. Page of Ae wear AMAIA SAA Date Issued HHIC-PHIL, RESULT OF INSPECTION / TEST 21-Tun-13 oie Pn.osz | ENS FAN VOLUME CHECK | 218% DEMONSTRATION Project No, Inspection tem Type of Inspection ABATE =A we SES ClassiAuthority NK | Dept om Place __ ONBOARD | Weather/Temp. v co Unit FAN VOLUME TEST LOGENERAL LITEST DATE: 21-Jun-13 L.2 ATTENDENTS : SHIP OWNER 2.0 VOLUME TEST DESIGN ACTUAL Location —_ | system xo. OCATION _ |SYSTEMO. vows) vou] Tora | vows) oum'] TOTAL 0.1 COLD E04 ss6 | 5600 | 5600 | 637 | sario | onio EXEL ME-05 sso | 5600 | 5600 | sso | ssoso | ssox0 No2cmonp | ME-o6 | 034 | ara | 17000 | 17.000 | 943 [177487 [177487 EXHL me-o7 | 034 | 874 | 17.000 | 17.000 18,5458 | 18545.8 Noscuonp | ME-08 | 072 | 94s | 24500 | 24500 | 10.93 [28.3306 | 283306 Ext om | 94s | 24500 | 24500 | oss [247sae | 247536 Noacmonp | ME-10 | 072 | 907 | 23500 | 23.500 50,9485 | 30048.5 E a 072 | 9.07 | 23,500 | 23500 | 1483 [37.0018 | 370018 Noscmoup | ME-12 | 072 | 1022 | 26500 [ 26300 | 1840 [a7.c028 | avons 7 Me-13 | 072 [ 1022 | 26500 | 26,500 | 15.75 [40,8240 | aos200 Noscmorp | ME-14 [033 [ tas | 27.000 [ 27000 | isas f3sons | sons EXH. 033 | t4as | 27,000 | 27.000 | ts3a [20,345.1 | 29345.1 xoremory | ME-16 | 079 [ 703 | 20,000 [ 20.000 | 18.00 [51,1920 | 511920 EXE. (079 | 703 | 20,000 | 20,000 | 13.84 [39,3610 | 39361.0 Den On Winesad Approved by aa wa | Pats ae ae | wae Chockor_| approved ty | Owner cass | Authority Dae [2tow 42 | Me > |S iN eg [ee 8 | BY Ri Rein v KocVIGtt 7 TANJINTIEAVY TNDUSTRITS © CONSTRUCTION COLTD. & CONSTRUCTION CO.,LTD. al ATOTE TS HOTAT CHECK SHEET NO. Page of ZAALA| a Ad wear AAVALE SAA Date sued HHIC-PHIL, RESULT OF INSPECTION / TE 19-Jun-13 ae aes mer ESE : 5 Project No, PN-082 inspection tem __!NPOW WIPER Toe oF inspection OPERATION TEST BART eT FAL aS : ene Gloss/Authority NK | Deo OM [Place ONBOARD | Weather/Temp. ea Uni WINDOW WIPER FUNCTION TEST 1.0 GENERAL LLITESTDATE — 19 June, 2013 1.2 ATTENDENTS : SHIP OWNER 2.0 TEST RECORD A. WINDOW WIPER wo. | cova: | PONANOH | uparer Lamp | wiper MoToR | WATER SPRAY Conpition | conoimon | CONDITION | CONDITION | CONDITION PORT o« ok ok oK ok center} 0K 0K ok ok ok sTBD oK oK oK ok oK B. CLEAR VIEW SCREEN PORT/STBD. CVS CONTROL CONDITION POWER HEATER . MOTOR Nov Jswircu/amp| swircuiLamp | TAMPSIITCH [CVS CONDITION) conprrion CONDITION | CONDITION PorT ok ox ok oK ok STBD. ok oK ok ok ok AIR DUMPER/HEATERS BLOWING CONDITION ron STED. OK OK Dat OM Wines Approved by ae aan] pane | oF Be | ABS | Remarks Checker | approved by | owner | Chass | _authoriy Ux ny > i 3 | ee) vue Peely'B) 2s uy. 3] wm [eo ; ny | kocyiGir HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LID. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD. AACE AS HOTAT 13 neck SHEET NO Page - mee AAA SAA PSO wemays RESULT OF INSPECTION / TEST aw BANeS . 2 BASH a 7 Project No. PN-082 | inspection Item CHALK & HOSE TEST | Type of inspection TGETNES Ae I NK FAL M at ON BOARD ayes Class/Authority Dept. Q Place Weather/Temp. CHALK & HOSE TEST FOR ACC' (UPPER-DECK TO N.B.-DECK) 1.0 GENERAL II TESTDATE: 06-May-13. 1.2 ATTENDENTS : SHIP OWNER 2.0 TEST RECORD. LOCATION ROOM NAME we [ory REMARK PRSSRGEWAY SCOOT x EMERGENCY GENERATOR R|STEEL DOOR [1 o INDOW oR peck esmrornce NPV fT os FRONEERS OFICE——wnow cS ICU. ROOK COUMER VENT} 2] HAL [or Steec Door —[-1|-xo os JGARBAGE ROOM |LOUVER VENT 3 CHALK ‘OK cc. uerER Dg¢x FRECONTROL STATION LOUVER VENT [1 [ CHALK [OK FAN ROOM Stee. Door | 1-[_ Hose [ok FAN ROOMS) STEELDOoR [1 | Tose | on ENGINE CASING STEEL DOOR [1 }_ Hose [or azROoM STeECDoOR [| ena [OK Ea ROOKT STEECDooR [1 | CHALK [OK STEE-DooR [1 | Hose [OK beck srone COVER VENT-[ 1 [CHALK [on OMA Steet Door [1 [nose | on loser rouvER VENT} 1} CHALK [OK RaNDOW eae RRLUROOM COUMERTEDT | cHALK [or ace.ta beck). ROMBCERDRVER CREW LAUWLOUVER-VENT_[1[cHALK [OK TALLEY OFFICE cOuvERVENT-[ 1 | GHALK [OK TOUVERVENT-[ 1 [ cnat [oR evanasiom INDOW hea foe Tao Tosa ampoeity AE Pan ae a2 A 27|: Remarks Cater [Appelty| Owner | cs [Autry Hay 83,2 \y meget AMA) Ty ws Lez ey © transi HEAVY INDUSTRIES & CONSTRUCTION CO. vp. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO4LTD. MANOS oS HOT i [CHECK SHEET NO. - Fags of BAAS SAA Barkeeeg 06 Mar 3 RESULT OF INSPECTION / TEST a a anes es ASR Projecto, PN=082 [Fin tem CHALK TESTE sect TIGHTNESS APB | 2h LAL Bt ayes Class/Authority SK | Dept. QM | Place ON BOARP | Weather/Temp. ACC.AB-DECK) OFFICER'S RECREATION RoqUCO Ge es SANITARY FANSPACE|LOUVER VENT | _1_| CHALK BA Part 2 ae aa @HSt7|2 | Remarks a byes WL em Han ‘ wy Z- 5 ANY 2 0 O nanny ne VY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AAO E oS HOT 3B |CHECK SHEET NO, Fags of : ! HAVA SAA Becreued 06-May-13 RESULT OF INSPECTION / TEST I Tae TSF ProicaNo, ——PN-982 [Frepecton tem CHALKTEST [Te finspeation TIGHTNESS Baeza BAI gt eee Class‘Authority SK | dept QM | Place ON BOAR | Weather/Temp. LOCATION ROOM NAME TYPE cueck ] REMARK SANITARY FAN SPACETE) [LOUVER VENT | 1] CHAT OK LIFT MACH. ROOM LOUVER VENT | 1 CHALK OK CHIEF ENG DAY ROOM | WINDOW [CHALK OK ICHIEFENG BED ROOM WINDOW T_[-GHALK OK ACC. (DECK) OWNER WINDOW TL GHADK PILOT WINDOW TI GnAcK CAPTAIN BED ROOM WINDOW TI CGnAcK [CAPTAIN DAY ROOM WINDOW 2 [CHALK WHEEL HOUSE | LOUVER VENT | 2] CHALK BATTERY ROOM LOUVER VENT [3 | CHALK NB-pecK — |EIFTPULLY SPACE ILOUVER VENT | 1] CHALK [CHART SPACE ILOUVER VENT |__| CHALK STAIR CASE, [Goose vent | 1] CHALK ; — ENGINE CASING [STEEL DOOR | 1 CHALK COMPASS DECK ISTAIR CASE }OOSE NECK VE? I ‘CHALK Da Ow Winesed Approved by az Part 2 ae aa HEtia | Remarks Anroved by | Owner | Ctass | Authority aa CT Wee] Sela % Ming By © HANJIN HEAVY INDUSTRIES & CONSTRUCTION HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. AAS FS BROTAT Wt ICHECK SHEET NO. Page of AAWALE SAM Dale Issued RESULT OF INSPECTION / TEST 19-Jun-2013 aa ae ction test ESE : Project No. PN-082 [inspection Iter_CO? FUNCTION TEST | tyne of Inspection FUNCTION TEST aaa we Ea mw )2= onsoarn | === Class/Authority Dept. Q Place Weather/Temp. v ea unit CO2_ FIRE EXTINGUISHING SYSTEM 1,0 GENERAL 1.1 TEST DATE 19-Jun-2013 1.2 ATTENDENTS NK , SHIP OWNER RESUI REMARKS 1 | PILOT LINE LEAK TEST OK 2 | MAIN LINELEAK TEST OK ALARM AND 3 | accumuLator system OK 4 |CO2 BOTTLE LEVEL CHECK oK FUNCTION TEST ITEM RESULT REMARKS CYL.VALVE OPENING OK CONTROL BOX CO2 ROOM OK CONTROL BOX FCS. OK TIME RELAY (30 SEC.) oK Dept. QM ‘Witnessed / Approved by via ty aaa | Pan © a WS | META | Remarks: Manca orton Goocker_[approved by] Owner Gigs [Authority eT vn bag? Gb Ae / TA Ta tune 13 es AE Pe 5, eave Upon Date ure = [9073 2 dudd 4 © Baa ° BY Kbéoox {Saree | vxocvian _|vnatanc Aly BA le 4 QHANIIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. ASAE 2S HO ; |CHECK SHEET NO. Page of S BSuar AMAR SAM Date'ssued RESULT OF INSPECTION / TEST 19-Jun-2013 ae pn-os2 [S485 con runcrion test | 24487 FUNCTION TEST Project No. Inspection Iten Type of Inspection BAe B BAL ae SA/EE ON BOARD Class/Authorit) BE Dept. om Place Weather/Temp. c eal Unit: CO2_AIR BLOWING & SMOKE DETECTION TEST 1.0 GENERAL, LI TEST DATE: 19-Jun-2013 1.2 ATTENDENTS : NK , SHIP OWNER 2.0 TEST RECORD. FIRE SMOKE ALARM. AIR NO. | LOCATION | FAN | gi cpu | Accumulator | BLOWING | REMARKS ME-04 OK 1 | No.1 c/HOLD oK oK ME-0S OK ME-06 OK. 2 NO.2 C/HOLD OK OK ME-07 OK 3 NO.3 C/HOLD MEO, ok. OK OK ME-09 OK 4 NO.4 C/HOLD ae = OK OK ME: OK. MET OK s | NoscmoLp ok ox ME-I3 OK ME-I4 OK 6 | NoscmorD oK oK MEAS OK MEI OK 7 | No.7 CIHOLD ok oK MENT OK ALARM POSITION POSITION RESULT REMARKS COZROOM OK WHEEL HOUSE OK OK Den OM Witnessed Approved by aa aay Part & ae ae aye71z | Remarks : Checker _[Approvedby| Class | Owner | Authority Wane 194 (270 7 arn ate |/4-nner fo] 0/3 jee \ ‘OIA LB BY, Ont JLAL Y.H.KIM_]V.KOCYIGIT (O HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUC TION CO.,LTD. AACE oS BIOTAT ICHECK SHEET No. Page of z zean EEE ae RESULT OF INSPECTION / TEST ae pn-os2 | 24" now THRusteR | 218% CENTERING INSP, Project No. Inspection lem Type of Inspection eae KA BE wATEE Class/Authority NK [Dept QA [Place ONBOARP | Weather? Temp. ° Uni, BOW THRUSTER 1.0 GENERAL LUTESTDATE: — 08-Apr-13 1.2 ATTENDENTS : NK, SHIP OWNER 2.0 TEST RECORD 2.1 SHAFT CENTERING uta SAG GAP FORE woz @ APTER 0.08 6a PORT oa 63 GAP SBD 0 63 REMARK GAP TOLERANCE: 54MIN. & 7.4 MAX CENTER 2.2 BLADE GAP SAG TOLERANCE: 0.28 MAX ANGULAR: 0.33 MAX UPPER UN 1 2 3 4 FORE 8 8 ® 8 LOWER ot ol 6 61 AFTER 36 36 36 UPPER 58 38 58 REMARKS Low Dept. QA Witnessed / Approved by 4 2 Baar Pan a aa SST _| Remarks Checker| Aporoved by | Owner Class Authority aA 1 es Daie_ [29 May) Be hea ty OS, | Q HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. ASAE aS HOTAT. ICHECK SHEET No. Page of, wear aenale S541 Date Issued eeu RESULT OF INSPECTION / TEST ae ae SuSE [Project No, PAWS? [ insocction em _SHIPSPAVIT | Type oF Inspection __MOAD TEST 2 APSE EAT TE See GlassfAuthority NK | Beps, QM [Place ONBOARD | Weather/Temp. © EFF Gnit: SHIPS DAVIT FOR GENERAL USE 1.0 GENERAL LITEST DATE: 23-May-13 1.2 ATTENDENTS : SHIP OWNER 2.0 TEST RECORD 2.1 LOAD TEST No. Test rrEM SPEC, RESULT TOAD TEST AT SWL (02 TONS) 1 LOAD 200K6 @ 5 MIN 2 OK 2. CENTERING OF DAVIT TO HATCH OPENING = OK 3._ MANUAL LOWERING AND HOISTING ok ‘CO? BOTTLE HANDLING DAVIT 05 TONS 1 LOAD S006 @ 5 MIN. HOLDING TIME - ox 2. CENTERING OF DAVIT TO HATCH OPENING - ox MANUAL LOWERING AND HOISTING - ox. STEERING GEAR ROOM DAVIT 05 TONS 1 LOAD S00K6 @ 5 MV. HOLOING TIME - ox 2. CENTERING OF DAVIT TO HATCH OPENING - ok 3. MANUAL LOWERING AND HOISTING “ OK REMARK DM Winesed Appovedy aa wa | pe | Se | Se | Gow | Remarks: Checker| appoedty | owner | cass | autory as 7 Be foe may Ip horde OY 239" wel " yr | HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD, anew ao mean to fa? oO ANTE BAA a Har RESULT OF INSPECTION / TEST 26/salts ae BASS 7 AAS TUNCTION Project No. PN-082 [inspection Item GALLEY & LAUNDRY Tie of inspection DEMONSTRATION aera A at eaee ClassiAuthority NK [Deps om Pla ONBOARD | Weather/Teme ise GALLEY & LAUNDRY EQUIP. OPERATION TEST 10 ¢ENERAL LITESTDATE + auly 262018 L2ATTUNDENTS: SHIP OWNER a0TustnecoRD i Trem vocation | ony | RESULT lorena ar cag 7h es Gales —[ 10K 3 eoiting ae Gates [108 1 Jbsking Oven Galley [1 [ox >it Kee Galey [1 [0K 6 [Deep Fat Fryer Galley 1 OK Pout Peer a Retiro a 9 Icotree Machine [Officers Pantry], ‘OK Crew's Pantry(1) OK io [bi Waser aly [10 TT [Waste Disp Galsy [1 | 0K 12 [Micave Oven Orisa pangeO[ 1 [OK cers aunt 19 [ooyng Tumbe 2 ying Tumble (Crew's Laundry(1)} OK aa TT — Sa ee EP ae | TEs an pr 3 boa oee_[ ohn kv aielat fv kocyicrr TIANJIN HEAVY INDUSTRIES & CONSTRUCTION CO,LTD, HANJIN HEAVY INDUSTRI & CONSTRUCTION CO.,LTD. AAAS a wor IcHECK SHEET NO. Page of = wade AVAL SAA Date sued HHIC-PHIL RESULT OF INSPECTION / TEST 2614uN13 a a aes ae FUNCTION PN-082 GALLEY & LAUNDRY Project No Inspection hem Type of Inspection DEMONSTRATION Sea NK TH MM BE ovpoarn [== Class/Authority Dept a Place Weather/Teme aa tt MISCELLANEOUS EQUIPMENT 1.0 GENERAL LU TEST DATE + July 26,2013 1.2 ATTENDENTS : SHIP OWNER RECORD NO. ITEM LOCATION QTY | RESULT Corridor of Upper Dk 1 |Cold Drinking Water Fountain Corridor of B Dk 3 ok Corridor of Engine Room 2 [safe Captain Bed Room T OK Tunior, Petty Officer & ie Refrigerator (Abou —_ 2 3 |Blectric Refiigerator (About 46 L) Be we Roome 4 OK Captain & Senior Officer 4 Electric Refrigerator (About 96 L) ‘Class rooms (4 Set) 5 oK ECR.(1) Crew's Pantry, Officer's ofvive Pantry 5. |Blectie Refrigerator (About 200 L oF 230] Gon ta Cows 4 oK Recreation Room ©_[Microwave Oven Oifficer’s Mess Room i OK 7_ 4 Slices Toaster Officer's Mess Room T OK 5 ‘Crew's Laundry & rum type Washing machine (About 7.0K] Gres taney 2 ok ‘Crew's Laundry 9 [Drum type Washing machine (Abou! [Drum type Washing shine (About 10.0 Officer's Laundry 2 OK _, ‘Crew's Laundry 10. |Etectric Portable tron Omners Laundey 2 oK 1” [Elecirie Heater (15 kW) Drying Room z OK a Taal aly TR) rae | SF] ES | AEA | tons bray | or =o O° TIANJIN HEAVY INDUSTRIES & CONSTRUCTION COAUTD, HANJIN HEAVY INDUSTRIFS & CONSTRUCTION CO.,LTD. uiicen, | RESULT OF INSPECTION / TEST HAAS WS mora |CHECK SHEET NO. Page of Me weet AAMAS SAA Date Issued [daw frodmneera| aS 74h Joe a ‘telah led y fel _su.tee {V.xocviorf|y. naLancio) 17-Jun-2013 ae wes Sh Project No, PN-O82 [inspection tem FIREPAMPER | Type of inspection _DPMONSTRATION wae A = eee classiAuthority NK | dep OM [Place __ONBOARP | WeatherTemp, v 9 Unit HIRE DAMPER TEST 1.0 GENERAL 1.1 TEST DATE — 17-Jun-2013 1.2 ATTENDENTS : NK SHIP OWNER 2.0 TEST RECORD NO. DESCRIPTION Location | Qty | RESULT FD-A-O1:AUTO & MANUAL FIRE DAMPER 1 UPP' DECK 1 OK FOR RETURN DUCT FD-A-02: MANUAL FIRE DAMPER 2 B-DECK 1 OK FOR GALLEY MECH. EXH. FD-A-03: MANUAL FIRE DAMPER 3 B-DECK 1 oK FOR GALLEY MECH. EXH. Dent OA Wiese Approved by ae we | rate | oF De | ASE | Remarks: Checker| Approved by | _Ovner_| class | Authority ay HANSIN HEAVY INDUSTRIES & CONSTRUCTION CO,LTD, HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. ASAT S TS mLOTAT |CHECK SHEET NO. Faget ay AAA SAA Date Issued RESULT OF INSPECTION / TEST 28-Jun-13 ae pnosa | aE BALLAST PUMPS [SABE Project No. Inspection tem __CAPACITY TEST_| Type of Inspection aaa aA BE Por Class/Authority Dept. OM [Place SEA TRAY | Weather/Temp, etl Unie BALLAST PUMP CAPACITY TEST 1L0GENERAL LLTESTDATE: 28-Jun-13 1.2 ATTENDENTS : SHIP OWNER 2.0 TEST RECORD = BALLAST PUMP CAPACITY : 900 m'/h * 40 mTH DISCHARGE VOLUME ‘CARGO PUMP: ‘TEST TIME, Oral PUMPNAME | niny | START | FINISH Joy yyge] DISCH. ] sucr. | VOLUME voLume|voLume}YOCUMF! press. | press. |!) coy | oy | | coeiem’ | cope’ No. PUMP BALLASTING] 15 min 706.6 912.9 207.3 3.2 02 829 No.1 WBT (C)] No2 PUMP DE-BALLAST| 15 min. 903.6 706.6 197.0 3.0 03 790 No.1 WBT (C) Dept OA Witnessed Approved by aa aT Part & ae ae THe Te | Remarks : Gresser | approved by | Ouner | iss] Authony a pate fay uuty 13 | one 3 | Or” ‘BONat . CG a by CONCEPCION AS NG_]V.KOCYIGIT] OANJIN HEAVY INDUSTRIES & CONSTRUCTION CO,LTD, HANJIN HEAVY INDUSTRIES & CONSTRUCTION COLTD. ASAE BE HOTT o CHECK SHEET No Page of S| aA weet AAA SAA Date Issued hue-puu RESULT OF INSPECTION / TES’ 24-lun-13 a a anes ENSE FUNCTION Proigct No. PN-082 | inspection tem __PEFP FAT FRYER livoe oF inspection DEMONSTRATION Za eeeT EA WE ES ClassiAuthority NK | Dept om Place __ONBOARP | WeatherrTeme EPI wnie Deep Fat Fryer_& Fire Fighting System Operation 1.0 GENERAL LATEST DATE: 24-Jun-13 1.2 ATTENDENTS: NK, SHIP OWNER 2.0 TEST RECORD 2.1 DEEP FAT FRYER OPERATION NO. ITEM SPEC. RESULT 1 SOURCE LAMP 220V LED(WHITE) OK 2 HEATER SWITCH : oK 3. HEATING LAMP 220V LED(GREEN) OK 4 HEATER 7.2KW oK 5 LIMIT SWITCH(SAFETY) : OK 6 PRIMARY THERMOSTAT 60~200°C OK 7._ SAFETY THERMOSTAT(SIMULATION TEST) SET 240°C oK 2.2 IN CASE OF POWER FAILURE OF DEEP FAT FRYER EXPECTED x NO. ITEM ace RESULT 1 OVERHEATING ALARM alarm 0K 2. WET CHEMICAL DISCHARGE ALARM alarm oK ES3 STOP FOR DEEP FATT FRYER AND . GALLEY FAN COIL UNIT shut oK ESS STOP * FOR GALLEY SUPPLY/EXH. FAN she OK Da oM WinsselApproedby az war | ems | Se | Se | Aaa | Remarks Crocker | Appronedby | owner | class | Autoriy an ; fae [O1 duly | oxoaly rg] oN | 724 >? wax by ya ben aol FAG Lexocviar| vars HANGIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.,LTD. ASAE AS BIOTAT EET NO. Page of a weet | BAVA AA Date lssied RESULT OF INSPECTION / TEST aa PN.082 | 22S F.00.0. SYSTEM | aS Project No. 7 Inspection Item PRESSURE TEST ___| Type of Inspection BAe SA Be aes Class/ Authority NK [Dept QM | Place ONBOARD | Weather/Temp, eb Unit F.0./D.0. SYSTEM PRESSURE TEST 1.0 GENERAL LITESTDATE: — 19-Jun-13 1.2 ATTENDENTS : SHIP OWNER/NK 2.0 TEST RECORD ACCORDING TO APPROVED PIPING DIAGRAM, THE PRESSURE TEST WAS DONE. UNIT : ker : DESIGN TEST SERVICE PRESSURE, PRESSURE, F.0/D.0, LINES, 35 60 Dept. QA ‘Witnessed / Approved by 4 2 oT Pat ae WS] AeTE | Remarks: Checker | Approved by | Owner Class Se [ee praitgy PAonboslen tev | 7] ‘QHANJIN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD.

You might also like