REQUEST FOR INSPECTION RECORD

PLTU 2 Jateng 1×660MW Adipala, Cilacap


NO:CNTIC-CCTD-R-011
Turbine electronic room at 6.4m
Location
boiler electronic room at 13m

Work Items DCS emergency power on and the switch test

Submitted Date March 25, 2014

Inspection Date March 26, 2014

Reference Contract Document Requirement

Attachment Check List,

Weather Fine

Contractor CNTIC

No. TEST Quantity Approved Remarks

1    

INSPECTION Results
Attached

CCTD CNTIC JASER

Name

Signature

Date
INSPECTION RECORD

PLTU 2 Jateng 1×660MW Adipala, Cilacap


NO:CNTIC-CCTD-W-011
Turbine electronic room at 6.4m
Location
boiler electronic room at 13m

Work Items DCS emergency power on and the switch test

Submitted Date March 25, 2014

Inspection Date March 26, 2014

Reference Contract Document Requirement

Attachment Check List,

Weather Fine

Contractor CNTIC

No. TEST Quantity Approved Remarks

1    

INSPECTION Results
Attached

CCTD CNTIC JAESR

Name

Signature

Date