Proposal Required for Sargodha Project

Client needs a system where he can disconnect the meter when allowed
units reached. The reason is that he want to deploy advance payment in
shops. meters will be installed in a Plaza.
Requiremetns
Any communication method
Water,gas and electricity utilities may be integarted
android application
Single Phase Meter=300, Three Phase Meter=50 and CT=10