You are on page 1of 1

Page 8

Karnataka State Highway Improvement Project -II, Stage 1


Name of the Project :
Contract No :KSHIP-II/STG 1/ICB/

CLIENT: KSHIP
CONSULTANT: Egis International in J.V with Egis India consulting Engineers Pvt ltd and Aarvee associates
CONTRACTOR:
TEST : 10 PERCENT FINES VALUE
( BS : 812 PART - 111 )

Lab Ref. No : _____________ Date of Sample :__________

Type of Material :______________________ Date of Tested :__________

Source Km. :______________________ Location:__________________

Weight of Surface dry


Compressive Load
aggregate Weight of fines Mean % of
Applied for 10 minutes
Sl.No. Passing 14.0mm & passing 2.36mm IS % of fines fines
(Kn)
Retained 10mm Sieve (gm) "y"
"x"
IS Sieve (gm)

14 * x
Load Required for 10 Percent Fines = y+4

Where x = Load in tones.


y = Mean Percentage fines from two tests at x tones load.

Remarks :

Authorised Representative Authorised Representative


(For Contractor) Page-8 (For Consultant)

You might also like