Squbitial gguatee rs
ENGINEERING CONSORTIUM PO Box
CONSULTING ENGINEERS tran) 4antor® Fo) 4280774
Ea logesiamatona con, encore arias
24°'February 2
Ref. No: 1361KKID10217/1
The Building Perit Section
Dubai Municipality
Dubai, UAE,
Project’ «NOS. TOWNHOUSES ON PLOT NO. 333-1373, AL BADA FOR MR. ZAKA
‘KHALIL IBRAHIM DOLEH
Subject CONFIRMATION
ear Sir,
Reference to the above mentioned project, we hereby confim the following
41. AIG type - DX Ducted Spit Unit
2. Ventilation = Untreated fresh air with ducts connected to a mixing box at the back of
‘machine, exhaust provided wih centilugal inne for toilet and kichen
3, Refigerant Gas shal be R410A, HCFC & HFC free refrigerant
Hope this will meet your requirements
Yous fait,
Se
(fay Soot
[3 cacicenns consort
SS cnsunTeng EAGINEFRS|Gault! gguaiee
ENGINEERING CONSORTIUM
‘The Building Permit Secton
Dubai Municipality
Dubai, UAE,
21% February 2
Ref. No: 43740KKI0110217/1
Project’ AKOYA OXYGEN ~ PHASE 6 DEVELOPMENT BY FRONTLINE INVESTME
DuBal
‘Subject CONFIRMATION
Dear Sir,
Reference to the above mentioned project, we hereby confim the following
1. AiG type — Package Unit
2. Ventilation — Untreated iesh air with ducts connectedto return our duct, exhaust provided
Centrifugal inline for tollet and kitchen
3, Reigerant Gas shall be R410A, HCFC & HFC free relrigerant
Hope this will meet your requirements
Yours faithfully