P 91A 01 02 03 04 05 06 07 08 09
CL OF STATION
139400
2950 17050 17500 17500 17500 17500 17500 17500 17350 725
1500
+64.800 TOC.
1800
2000
PPC-1 PLATFORM PIER ARM PPC-2 PPC-3 PPC-4 PPC-5 PPC-6 PPC-7 PLATFORM PIER ARM PPC-8 U- GIRDER PPC-9
250
CAST-IN-SITU RCC CAST-IN-SITU RCC
2700 2700 2700 SLAB (TYP.) 2700 2700 2700 2700 2700 SLAB (TYP.) 3000
124650
2750
2200 2200 2200 2200 2200 2200 2200 2200 2200 CONCOURSE LVL.
(TOTAL LENGTH OF CONCOURSE LEVEL)
+59.290 TOC.
1300 1300
300
2800 2800 2800 2800 2800 2800 2800 2800 2800
SECTION L-L
(SCALE 1 : 200)
05
P 91A 01 02 03 04 CL OF STATION
06 07 08 09
141700
2950 (TOTAL LENGTH OF PLATFORM) 139400
17050 17500 17500 17500 17500 17500 17500 17350 725
C PIER C PIER C PIER C PIER C PIER C PIER C PIER C PIER C PIER
L L L L L L L L L
4450
1150 700 7600 9705 3295 9705 3295 7600 700 8300 3850
OPENING FOR OPENING FOR ESCALATOR OPENING FOR ESCALATOR OPENING FOR OPENING PLATFORM LVL.
STAIRCASE STAIRCASE +59.165 TOC.
SC2 RAIL LVL.
PB12 PB2 PB3 PB6 PB7 PB6 PB7 PB8 PB12 SC2 +64.800 TOC.
PB3
SC3 PB1 PB4 PB4 PB4 PB9 SC3 PB9 PB11
LIFT
CB-2 CB-2 CB-4 CB-4
PIT ESCALATOR PIT
CPA1 CPA2 CB1 CPA3 CPA4 CPA5 CPA6 CB1 CPA7 CPA8
ESCALATOR PIT
1475
CAST-IN-SITU STITCH PRECAST PIE PRECAST PIE
9200 9200
200
SECTION L1-L1
(SCALE 1 : 200)
NOTES :-
1. CUT-OUT SHOWN IN THIS DRAWING ARE INDICATIVE.
2. FOR EXACT CUT-OUT LOCATION REFER ARCH. DRAWING.
CAST IN SITU
FOR BHOOTNATH STATION
NAME SIGNATURE DATE NAME SIGNATURE DATE BY V.I.E NAME SIGNATURE DATE
DELHI METRO RAIL CORPORATION LTD.
ACCEPTED BY
DY.CE. (DESIGN) Reviewed CHECKED TARUN MOHAN Digitally signed by TARUN MOHAN
Date: 2021.03.17 15:58:26 +05'30' R1 REVISED AS PER COMMENTS 26.02.21
A.T. T.M. M.V.
Digitally signed by MAHENDER PAL FOR BHOOTNATH STATION STATUS
CE. (DESIGN) Reviewed & comments as marked on Drawing PROOF CHECKERS'/CERTIFICATE DESIGN QUALITY ASSURANCE APPROVED MAHENDER PAL VASHIST VASHIST
Date: 2021.03.17 16:04:04 +05'30' 28.01.21
R0 FOR APPROVAL
PROJECT MNGR. THIS DRAWING HAS BEEN PROOF CHECKED WITH THE RESPONSIBILITY OF CONTROL CHECK & VERIFICATION OF ACCURACY
A.T. T.M. M.V.
Reviewed and no Objection issued with THIS DRAWING MUST NOT BE EITHER LOANED COPIED OR OTHERWISE REPRODUCED IN
INDEPENDENT CALCULATION AND FOUND SUITABLE CORRECTNESS COMPLETENESS INTEGRATION & FULL COMPLIANCE OF WHOLE OR IN PART OR USED FOR ANY PURPOSE WITHOUT THE PRIOR WRITTEN PERMISSION DRG. NO. :
comments as marked on Drawing FOR EXECUTION CONTRACT PROVISIONS IN RESPECT OF DESIGN ANALYSIS & DRAWING OF V.I.E. REV. DESCRIPTION DATE DRN. DGN. CHD. APD. REV.
ENGR./CPM RESTS WITH THE DESIGN CONSULTANT AND CONTRACTOR.
Size A1